Post Job Free

Resume

Sign in

Chemical Process Engineer and simulation and conceptual design.

Location:
Calgary, AB, Canada
Posted:
September 22, 2020

Contact this candidate

Resume:

ilhee Jang

**** ** ****** ** *******, Alberta, Canada, T2T5B9

Home Phone: 403-***-****, Cell Phone: 403-***-****, E-mail: adgbxr@r.postjobfree.com

OBJECTIVE: Industry Application Engineer

HIGHLIGHTS OF QUALIFICATIONS & SKILLS

•Professional Engineer member in Alberta and Saskatchewan, Canada

•Prepared datasheets for equipment such as vessels, columns, heat exchangers, pumps, compressors, storages tanks and instruments for gas/oil and chemical/petrochemical plants

•14 years North American Experience in designing SAGD Project, Gas/Refinery, Aromatics (BTX Plant), Gas/Oil Pipelines, Compressor Station and CO2 Flooding Project in Canada and USA

•10 years Middle East and East Asia international experience in engineering Oil & Gas, Ethylene, Aromatics, HDPE and PP Plants as a Process/Start up Engineer

•6 years experience in plant operation and plant start-up for Gas, Ethylene, Refinery and PE/PP plants

•Have hands with plant trouble shooting and maintaining plant safe

•Very good at Pipeline Transient Analysis (Synergi Pipeline Simulator and FAT Simulator), and Hysys, VMG, Pipeflow Simulators

•Effective team member who is comfortable with leading or collaborating

WORK EXPERIENCE:

2019.08 – Present Lauren Services, Calgary, Canada and Home Depot Warehouse

Senior Process Engineer & Material Picker

Performed Process simulation and developed PFD, UFD & P&ID and Material & Heat Balance and prepared data sheets for equipment and instrument. HAZOP Studies, OPPSD and ORA.

Projects involved:

Pembina Facilities Modification Projects and driving forklift in the Home Depot Warehouse

2010.09 – 2019,07 Stantec Consulting Ltd, Calgary, Canada.

Senior Process Engineer

Performed Process simulation and developed PFD, UFD & P&ID and Material & Heat Balance and prepared data sheets for equipment and instrument. Performed system hydraulics, pipeline hydraulics with Synergi Pipeline Simulator, FAT Simulator, HAZOP Studies, OPPSD and ORA.

Projects involved: Various MOC (Management of Change) Projects

•Enhanced Oil Recovery(EOR) Projects

NCG-Steam Co-Injection to Well Pads, Aqueous Ammonia–Steam Co-Injection to Well Pads, CO2–Steam Co-Injection to Well Pads

Liquid and Gas Pipeline Projects

SGS Pipeline Pump Station, Acid Gas Injection Pipeline, LACT Units Design, Kitimat Pipeline Expansion FEED, Narrow Lake Offsite Pipeline, Compressor Station Expansion

Gas/Oil and SAGD Projects

PMA (Polymer Modified Asphalt) revamping, Vapor Recovery Unit Studies, Pellican Well Pads Design, Slop Oil Treatment by Centrifuge, Gas Plant Revamping, Surmont 2 SAGD

2007, 08 – 2010, 07 Kellogg, Brown & Root, Houston, USA & Saudi Arabia.

Senior Process Engineer / Start-up Engineer (2009, 3 – 2010, 7) at Houston in Texas and Al Jubail in Saudi Arabia

Projects involved:

•Saudi Kayan Olefin Project. (2009, 03 – 2010, 07), Saudi Kayan Petrochemical Co, Ltd (1350,000 MTA ethylene plant).

•Performed engineering of olefin plant of ethane crackers at KBR head office in Houston

•Generated PFD, UFD, P&ID, DBM and prepared instrument/equipment datasheet.

•Simulated olefin facilities and participated HAZOP, ORA, OPPSD.

•After IFC-P&IDs, participated commissioning, pre-commissioning and initial plant start-up as a commissioning engineer

•Wrote operation and commissioning procedure for ethylene plant initial start-up.

Technical Professional Process Lead (2007, 08 – 2009.02) at Houston in USA

Projects involved:

Performed and developed PFD P&ID and Material & Heat Balance. Performed system hydraulic, pressure relieving calculation, HAZOP Studies and prepared equipment data sheets.

•Ras Tanura Integrated Project. (2008, 10 – 2009, 02), Saudi Aramco & Dow Chemical

•Performed Aromatics (BTX) Plant Design for Hydrogenation and Extraction Unit.

•Reviewed the Licensor Package and Commented on Licensor Package.

•Prepared PFD and the related P&ID and Reviewed and commented Licensor items.

•Yanbu Export Refinery Project. (2007, 08 – 2008, 09), Saudi Aramco & ConocoPhillips

•Developed CDU/VDU Unit’s PFD, P&ID and prepared equipment data sheets.

•Performed hydraulic calculation and pressure relieving system design.

•Prepared Solid Handling Unit PFD, P&ID (Coke & Sulfur Transfer System).

2005, 08 – 2007, 07 Hatch Energy., Calgary, Canada

Senior Process Engineer

Projects involved:

•N-Solv Project, Petro-Canada, Calgary, Canada. (2007, 02 – 2007, 08),

•Weyburn CO2 Recycle Compressor Expansion Project, Encana. (2006, 06 – 2007, 01)

•SCOP HAMRIN Oil Field Development Project, Kirkuk IRAQ. (2005, 08 – 2006, 05)

2005, 03 – 2005, 07 IMV Projects Engineering Co., Calgary, Canada

Process Specialist

Projects involved:

•Blackrock Orion SAGD Heavy Oil Projects, Blackrock Adventure co. (2005, 02 – 2005, 07)

2003, 09 – 2005, 02 Fluor Canada Ltd., Calgary, Canada

Process Specialist

Projects involved:

•Ultra Low Sulfur Diesel Upgrade Project, Shell Canada (2003, 9 – 2004, 10)

2003, 01 – 2003, 08 Shell Canada Limited., Calgary, Canada

Process & Safeguarding Specialist

•Updated PFD, P&ID and Safeguarding Dwg of Shell Caroline Sour Gas Plant

•Conducted and Corrected field inspection of Process and Utilities Facilities Trouble Shooting

1993, 04 – 2002, 03 Daelim Industrial Co. Ltd., Seoul, Korea

Projects involved (all Turnkey Projects):

•1,000 MMSCFD Southpars Gas Development Phase-1 Project (Iran),(2000.02 – 2002,03)

•250,000 MTA HDPE Haldia Petrochemical EPC Project (India), (1999, 01 – 2002, 01)

•2,000 MMSCFD Petronas Gas Processing EPC Project (Malaysia), (1996, 09 –1998, 12)

•200,000 MTA LDPE Phillips Plant EPC Project (Singapore), (1995, 05-1996, 08)

•350,000 MTA Ethylene Thai Olefin Plant EPC Project (Thailand), (1993, 03 –1995, 04)

•Simulated and prepared P& ID, PFD on Gas Dehydration Unit, Condensate Stabilization Unit and Fractionation on Sour Gas Plant Project

•Developed Waste Treatment System (Oily Water, and Law Water Treatment System

•Planned and developed initial plant start-up sequence diagram for converging all department on the priority work and complete project on time

•Performed precommissioning, commissioning and initial start-up for all above plants

1986, 01 – 1993, 03 YNCC Co. Ltd in Korea

Process/Operation Engineer:

•Operated Naphtha Cracking Heater, Quench, Cold Box, Cracked Gas Compressor Section, C2-, C3- Refrigeration System, Fractionation Section, Raw Water Treatment, WWT, and Boiler System.

EDUCATION

•B. Sc., in Chemical Engineering, Chung-Ang University, Seoul, Korea



Contact this candidate