Post Job Free

Resume

Sign in

Mechanical Engineer Plant

Location:
Chennai, Tamil Nadu, India
Posted:
October 24, 2020

Contact this candidate

Resume:

APPLIED FOR SUITABLE SENIOR POSITION IN MECHANICAL ENGINEERING.

ARUMUGAM THAMODARAN Email: adg9xn@r.postjobfree.com

adg9xn@r.postjobfree.com

Skype ID : arumugam.thamodaran

Mobile: +91-944*******, +91-971*******

Chennai, Tamil Nadu, India.

CAREER OBJECTIVE

To work in the most challenging position with an organizational that provides amble opportunities to learn and contribute.

CORE STRENGTHS

Maintenance Management.

Turn Around Shutdowns & Annual Shutdowns.

Cost Control, Procurement, Vendor Management.

Mechanical Construction Execution & Project

Co ordination, Pre Commissioning.

Startup & Commissioning of Rotary &Static

Equipment.

Reliability System & Team Management

AN OVER VIEW

A result oriented professional with Qualitative experience of over 30 years Proficiency in Managing all types of Maintenance Operation of Various equipment, Spare parts Management system, Turn Around shutdowns, Annual shutdowns, Cost control, Sourcing & Vendor Management

And Mechanical construction Execution, Construction coordination, Pre commissioning, Startup & Commissioning of all Rotating & Static equipment, Enhancements & Team Management

FUNCTIONAL ARAEAS

Maintenance Operations

Planning day to day strategies, all types of maintenance schedules, along with resources allocation.

Planning & Scheduling of Preventive, Periodical Maintenance, Preparing Materials, Resources & pre requisition.

Equipment & Machineries Failure Analysis and Trouble Shooting.

Vendor Management

Assessing the performance of the vendors based on the various criteria, such as quality improvement, cost,timely delivery, credit time etc.

Over seeing follow up with vendors for deliverables, and quality checks, ensuring timely payments.

Planning, organizing and controlling all requisite activities to perform such as techno commercial evaluation negotiation, recommendation, inspection etc

Spare parts management

Over seeing follow up vendor recommendation spares, such as Commissioning spares, Critical spares and maintenance spares .Performing & ensure of the vendors spares cost, Quality etc.

Follow up the spares preservation procedures & Easily locate the spares in warehouse & lay down areas.

Team Management

Directing, leading & Motivating workforce and importing continuous of job training for accomplishing job completion effectiveness / efficiency.

Working on succession planning of the workforce, shift management activities & appraising the member’s performance

& providing the feedback

Turn Around Shutdowns

Management skills in Maintenance management system, Time Management & Resources Utilization, Inventory & Cost Control, Vendor Development System

Performing all pre shut down, Main window & Post shutdown activities, Directing, Leading & motivating work force to complete the jobs without delay in Turn Around shutdowns.

Effectively coordinating for all safety procedures, minimizing occurrence of incidents & accidents. Performing all PTW System as per work procedures.

Construction Execution & Coordination

Execute mechanical construction, Installation of equipment as per international standard, codes and P & ID, Constructional drawings.

Responsible for Executing & Coordinating of construction for Quality control measures, as per design standards, codes & project Schedule.

Completion of Construction as per Project Schedule.

Pre commissioning and start up & commissioning

Review all mechanical completion documents as per constructional standards, designs.Walk through and Preparation of pnch list And Tagging the Equipments as per P&ID.

Inspect & Review all punch close status and coordinate with all disciplines for startup & commissioning.

Preparation of all requisites, like resources, materials, tools & tackles and equipment etc.

Responsible for Witness Start Up & commissioning of all equipment as per RSD Direction & Conclusions.

Initiative & Implement of all Reliability System Department operations. And Coordinate with all Discipline clearance to start up & commissioning of all Equipments.

EMPLOYMENT OUT LINES

I have More Experience in Turn Around Shutdown Maintenance in Refineries, Gas Plants, Petro Chemicals, Fertilizer Industries, Specialized in Static Equipments, like Columns, Heat Exchangers, Scrubbers, Vessels, Driers, Reactors,Flares, Drums, related Maintenance activities including Spading & De spading, Opening, discharge & charge Catalysts, Pull rings & high pressure cleaning, Hydro Testing, Nitrogen pressure Testing, Dosing. Various Miscellaneous of (MOC) Mechanical, Structural, Piping Hot & Cold work etc. And also Specialized all Rotating Equipments. Plant Maintenance, Mechanical Construction Execution, Project Coordination, Pre Commissioning, Start up Commissioning of all equipment etc.

MECHANICAL ENGINEER

M/S.BAHWAN ENGINEERING COMPANY LLC. OMAN ; SOHAR INTERNATIONAL UREA & CHEMICAL INDUSTRY- TURN AROUND SHUTDOWN PROJECT-2020 FROM JANUARY-2020 TO FEBRUARY-2020

TA Shutdown Maintenance has done as per TA Planning as below :-

Maintained,Various Types of Heat Exchangers, CO2 Compressor condensers, Oil Coolers, strippers, Carbonate Condenser (Fixed Tubes, Floating Heads & “ U ” Bundles Etc.) Hydro pressure Testing, Helium Testing etc.

Removal, Repair & Replacement of Various Valves( MOVs, Control valves, PSVs etc.)

Blinding & De blinding in Various Pipe Nozzles & Pipes in ISBL. OSBL and all other areas.

Various Types Process vessels, Tanks, Columns and Reactors.

Removed, Repaired & replaced various Pumps suction Strainers,CO2 Compressors suction Strainers & Filters.

Removal & Reinstallation steel & Rubber Bellows in Vacuum Separate Holder & Granulator Scrubber Tank etc.

Various Miscellaneous of (MOC) mechanical, Structural, Piping Statics Hot & Cold Work have been done. in Urea & Ammonia Plant.

PROJECT MANAGER

M/S. WATER SYSTEM INDIA PRIVATE LIMITED, FROM JULY-2019 TO OCTOBER-2019.

Water Treatment Plant, Effluent Treatment Plant & Sewage Treatment Plant Design, Engineering, Supply & Construction of all Plant in Various location in South India. Pre commissioning, Start up Commissioning, Operation & Maintenance of all plants. Revamping of Existing Various plants in Various Locations. As per project Management and Project Cost followed to complete the Projects. Coordinate & Execute the construction of Project.

BLOCK LEAD- TURN AROUD SHUTDOWN PROJECT.

M/s. QATAR ENGINEERING & CONSTRUCTION CO.WLL. : QATAR SHELL GTL TURN AROUND PROJECT-2019 FROM JANUARY-2019 TO MARCH-2019.

TA Shutdown Maintenance has done as per TA Planning as below :-

In Various Types of Heat Exchangers, Oil Coolers, Condensers,( i.e. Fixed tubes, Floating heads, “U” Bundles etc.)

Hydro Jetting, Pressure Testing, Helium & Hydro pressure testing.

Removal & Re installation of Various types of Valves

Blinding & De Blinding of Various Pipe Lines.etc.

Slug Catchers Inlets & Out lets, EDV Lines, Vessels, Tanks etc.

Various Miscellaneous of Mechanical- Static jobs (Hot work & Cold work). In Feed Gas Process Plant.

OPERATION MANAGER(PLANT & MACHINERY)

M/S. SRI GOVINDA PERUMAL ENTERPRISES, FROM MAY-2018 TO JULY-2018.

TA Shutdown Maintenance has done as per TA Planning as below :-

All Types of Maintenance Planning & Scheduling, Spare Parts Maintained, Stores, Purchase, Materials Stock maintained, Sub Contractors, Vendors, Suppliers development to meet our requirements. Coordinating to Production dept, to achieve Production Planning.

Bud jetting for Plant & Machineries & Dept, operations, etc.

Maintained & Serviced various Automobiles like, Tippers, Loaders, Excavators, Fork lifts, Pick ups, RMC Transit Millers & Concrete Pumps etc.

Maintained Jaw Crushers, Blue metal Crushers, M- Sand Crushers, Agitator, Ready Mix Concrete Plant Equipment & Associates equipment, etc.

Maintained Diesel Gen sets, Air Compressors, Submergible Water Pumps, etc.

AREA SUPERINTENDENT MECHANICAL

M/S. QATAR NATIONAL FACILITY SERVICES, PROJECT: QATAR SHELL GTL TURN AROUND SHUT DOWN PROJECT-2018 (MARCH-2018).

TA Shutdown Maintenance has done as per TA Planning as below :-

Various Types of Heat Exchangers, Oil Coolers, Condensers,( i.e. Fixed tubes, Floating heads, “U” Bundles etc.)

Hydro Jetting, Pressure Testing, Helium & Hydro pressure testing.

Removal & Re installation of Various types of Valves

Blinding & De Blinding of Various Pipe Lines.etc.

Slug Catchers Inlets & Out lets, EDV Lines, Vessels, Tanks etc.

Various Miscellaneous of Mechanical- Static jobs (Hot work & Cold work). In Feed Gas Process Plant.

DEPUTY MANAGER MECHANICAL

M/S. DESCON ENGINEERING LLC (ABUDHABI), PROJECT: M/S. ABUDHABI POLIMERS COMPANY LTD BOROUGE-1, TURN AROUND SHUT DOWN PROJECT-2017(FROM FEBRUARY- 2017 TO AFRIL-2017).

TA Shutdown Maintenance has done as per TA Planning as below :-

Various Types of Heat Exchangers, Oil Coolers, Condensers,( i.e Fixed tubes, Floating heads, “U” Bundles etc.)

Hydro Jetting, for cleaning of tubes, Hydro Testing, Helium & Nitrogen pressure testing.

Removal & Re installation of Various types of Valves

Blinding & De Blinding of Various Pipe Lines.etc.

Different Types of Columns, Reactors, Vessels, Tanks etc.

Utility Various Static Equipment and Replacements & Repair of Seawater GRE Lines Spools, Stub Ends Flanges etc.

Various Miscellaneous of Mechanical- static jobs (Hot work & Cold work). In Ethylene Plant, Poly Ethylene1&2 and Utility

Off sites.

SHUT DOWN ENGINEER

M/S. ENERGY TECHANICAL SERVICES.(QATAR),

PROJECT: M/S.ARAB-D IN DUKHAN FIELDS (TURN AROUND MAINTENANCE SERVICES-2017.(DECEMBER-2016 TO JANUARY-2017).

TA Shutdown Maintenance has done as per TA Planning as below :-

Various Types of Heat Exchangers, Oil Coolers, Condensers,( i.e. Fixed tubes, Floating heads, “U” Bundles etc.)

Hydro Jetting, Pressure Testing etc. Various Types of Heaters.

Removal & Re installation of Various Kinds of Valves

Blinding & De Blinding of Various Pipe Lines.etc.

Different Types of Columns, Reactors, Vessels, Tanks etc.

Various Miscellaneous of Mechanical- static jobs (Hot work & Cold work). In Poly Ethylene Plant.

AREA ENGINEER – MECHANICAL ( SITE SHIFT IN CHARGE)

M/S. Qatar Engineering & Construction company WLL, PROJECT : M/S. ABUDHABI GAS LIQUFACTION COMPANY LTD.(das island) turn around shut down-2016. OAG TRAIN .1, PLANT 2 & COMMON FACILITY & LNG train -2 (January- 2016 to APRIL- 2016).

TA Shutdown Maintenance has done as per TA Planning as below :-

Various Types of Heat Exchangers, Oil Coolers, Fin Fan Coolers, (i.e. Fixed tubes, Floating heads, “U” Bundles etc.)

Hydro Pressure Jetting, N2 Pressure Test, Hydro Test & Pneumatic Test etc.

Various Types of Static Equipments.

Removal & Re installation of Various Kinds of Valves

Spading & De Spading of Battery Limits, Various equipments & Pipe Lines.etc. Different Types of Columns, Drums, knockout drum, Vessels, Tanks etc.

Painting & Coating of Thermal Spray Coating, Belzona Coating in Various Equipments.

Various Miscellaneous of Mechanical- static jobs & Pipe spools Replacement (Hot work & Cold work). In OAG & LNG BOOSTER Plant.

MAINTENANCE COORDINATOR

M/S. EMIRATES INDUSTRIAL LABORATERIES L.L.C.(FROM JANUARY-2015 TO MARCH-2015) PTOJECT:- M/S.QATAR CHEMICALS CO .LTD. TURN AROUND SHUTDOWN-2015 (POLY ETHYLENE PLANT-3)

TA Shutdown Maintenance has done as per TA Planning as below :-

Various Types of Heat Exchangers, Oil Coolers, Condensers,( i.e Fixed tubes, Floating heads, “U” Bundles etc.)

Hydro Jetting, Pressure Testing etc. Various Types of Heaters. Removal & Re installation of Various Kinds of Valves

Blinding & De Blinding of Various Pipe Lines.etc.

Different Types of Columns, Reactors, Vessels, Tanks etc.

Various Miscellaneous of Mechanical- static jobs (Hot work & Cold work). In Poly Ethylene Plant.

UNIT IN CHARGE - MECHANICAL

M/S.EDAC ENGINEERING LTD ( AUGUST-2014 TO DECEMBER-2014) PROJECT- M/S. EQUATE PETRO CHEMICAL CO.

TURN AROUND SHUT DOWN – 2014 (ETHYLENE UNIT-1) KUWAIT.

TA Shutdown Maintenance has done as per TA Planning as below :-

Different Types of Heat exchangers, Oil coolers. (i.e Fixed tubes, Floating heads, “U” Bundles etc.) Different Types of Columns, Reactors, Vessels, Tanks etc.

Blinding & De blinding in ISBL, gas line, lube oil line, plant air line & ethylene, propane process lines etc.

Varies kinds of control valves, Manual valves, PSVs removal, replacement & reinstallation etc.

Removal & Reinstallation of sea water lines Valves & Rubber Bellows.

Varies Miscellaneous Mechanical- static jobs (Hot work & Cold work) in Ethylene Unit-1.

SENIOR SUPERINTENDENT (EQUIPMENT

m/s. Qatar Engineering & Construction company WLL, SITE : Ras Gas shut down Project in AKG – 1

& Train-7 ( August 2013 to December 2013)

TA Shutdown Maintenance has done as per TA Planning as below :-

IN AKG – 1

Various Types of Heat exchangers, Oil coolers .And Different Types of Fuel Gas & LNG Strainers. Turbine blowers replacing. Blinding & De blinding in gas line, Lube oil line & Compressed air line & ISBL & OSBL Etc.

IN TRAIN – 7

Replaced Filter house all Air Filter cartridges in Four Gas Turbines (Designed by M/s.GE Electric Co. USA, Mfd. by ; M/s. Nuevo Pignone, Frame 9,stages 3) Inspection carried out through Integrity in Clean air ducts and Dirty air ducts.

Replaced in all Gas Turbine Fuel gas Scrubber Filter Cartridges. And Blinding & De blinding in all Gas Turbines fuel gas lines and CO2 lines.

Inspection carried out through Integrity in all Gas Turbines Stacks and Exhaust Plenum welding joints, refractory

& all claddings. And Replaced in all Gas Turbine Fuel gas drain line tapping and valves.

SENIOR MECHANICAL ENGINEER – DSM Soft Pvt. Ltd.

SITE - RELIANCE INDUSTRIES LTD, JAM NAGAR – GUJARAT(JULY 2005 TO NOVEMBER 2005)

Value Maximization shutdown project (Turn Around) FCCU- Plant in refinery.

Value Maximization TA Shutdown Maintenance has done as per TA Planning as below :-

Regenerator & Combustor, Capacity 6000 m, Design Pressure 3.7 Kg/cm (g) Fabricated by L&T. As per VMP project (Turn Around shutdown) plan. Reactor & Stripper, Design Press.3.7 Kg/cm (g), Fabricated by HANJUNG. As per VMP Project (Turn Around shutdown) plan. Direct Fire Air Heater (DFAH) Power Recovery Train (PRT) equipment etc. Exchangers, Fin Fans, Oil Coolers, TSS, FSS & Flue Gas Chamfer etc.

AREA ENGINEER – OCC Ltd. (Doha Petroleum Construction Co .Ltd)

QATAR PETROLEUMS MESAIEED SITE – QATAR. (MARCH.2005 TO MAY.2005)

GRTA SHUT DOWN PROJECT- RFCC Complex and Condensate refinery.

TA Shutdown Maintenance has done as per TA Planning as below :-

Regenerator & Combustor, capacity 2142 M, Design Pr .3.45 bar (g) and regenerator cyclone tube systems. And Reactor, Macchi Boiler, Belco unit scrubber system, Main Column, Orifice chamfer, Catalyst Storage hoppers, etc.

Different Types of Heat exchangers, Oil coolers, Air Coolers, etc. and Fin Fans, Re boilers, Extractors, Storage tanks, etc Condensate feed / Overhead exchangers & Combined feed exchangers and Distillate splitters, furnaces, Towers, Filters, Ejectors, Absorbers, etc.

PRE COMMISSIONING ENGINEER

HYUNDAI ENGINEERING AND CONSTUCTION CO. LTD. (JULY 2009 TO OCT 2009)

RAS LAFFAN C - IWPP ( QATAR)

Inspected & Monitored Construction status in Gas Turbines (Model; MHIM70IF3) and Equipment for pre commissioning and commissioning as per P & I Diagram.

Prepared all materials for Pre commissioning and commissioning for Lub. oil Flushing & Circulation, Control oil Flushing & circulation and Seal oil Flushing & circulation.

Pre Commissioned in (MHIM701F3) GAS Turbines for all other operational systems and Tagging & Punch list prepared in all operational system lines & associated equipment in GTs. as per P &I Diagram.

In other Plant equipment & associated all pipe lines also inspected and monitored for Pre commissioning & Commissioning i.e. ; HRSGs, WTP, STP, Cooling towers, Fire Hydrant systems, NG Receiving plant, Black start DGs. Etc.

Coordinate with sub-contractors and project main contractor for commissioning.

EQUIPMENT IN CHARGE (INSTALLATION)

DESCON ENGINEERING LLC. (APRIL-2012 TO JUNE-2012) IN M/S. BARZON ON SHOR ROJECT-QATAR

(JAPPAN GAS CORPORATION – EPC)

Preparation of Method Statements to install the various Static & Rotary equipment as per M/s. Descon Engineering scope. (i.e Various Types & Capacity of the Pumps & EOT Cranes, Various Types & Capacity of the Columns,Heat

exchangers, Reactors,Storage tanks, Knock out drums & Flares etc.)

Checked & verified all equipment documents related to installation of all equipment. And all Equipment foundations,

Equipment & their accessories and site conditions etc.

Preparation of Tools, Cranes, Materials, Manpower and other facilities for installation of Equipments Collected all the Equipments documents related to install the equipments from EPC. and Coordinated with EPC, CLIENT,

Vendors & Other Sub contractors.

ROTATING EQUIPMENT ENGINEER

AL BARRAK INDUSTRIAL SERVICES (JUNE 2010 TO DECEMBER-2011) SAUDI KAYAN PETRO CHEMICAL PROJECT

AL JUBAIL INDUSTRIAL CITY. K.S.A)

RSD & CSU (Start up & Commissioning) all Functions, have done the following Rotating equipments in PHENOLICS PLANT (Specialty Products) and AMINES Facility Project.

Various types & capacity of the pumps like centrifugal (API-610) horizontal overhung, center hung pumps, vertical sump pumps, Submerged pumps, packaged Reciprocating pumps, duplex & Triplex diaphragm pumps, Springs supported pumps, Gear pumps, Vacuum pumps (Make: NASH) etc. (All API Seal Plan:682) and Various capacity centrifugal blowers, Induced draft fans, fin fans, Incinerator blowers, Safety shower fans etc.

Horizontal Solid Bowl screen Centrifuges ( Make : ANDRITZ),Various capacity Agitators (Make : EKATO),Glycol Chiller package Centrifugal compressors, Acetone chiller package Screw compressors, (Make: York process system)

Instrument air package centrifugal compressor( Make: CAMERON), Phenol chiller package screw compressors (Make York process system). Safety shower chiller package Screw compressors Make: Bitzer etc.

BPA Prilling system package equipment like Prilling ID fans, Screw conveyors, Rotary valves, Vibrating screens, Scrapper conveyors, BPA distributor conveyors, Prilling bucket elevators, Prilling machines etc.

Ammonia Recovery package compressors (Make: Blackmer .U.S.A),Nitrogen package (Make : Kwang shin Machine Ind.Co.Ltd.) Eye wash & Safety Shower Chiller package (Make: THI Refrigeration Seoul, Korea) etc.

INSTALLATION & COMMISSIONING ENGINEER (PROJECT COORDINATOR)

GULF CONSOLITED CONTRACTORS CO. LTD – (MAY 2007 TO JUNE 2008)

(PETRO RABIGH DEVELOPMENT PROJECT POLYMER PLANT (E & I) IN PC 1, RABIGH, KSA.)

Execution of construction, Coordination of (E&I ) Project, Supervision of construction in Product Ware house, Raw material area, Poly propylene (1& 2), Sub stations, Logistic control Centre Pelletizing building & Silo areas, All Pipe Racks and Central Control Rooms (CCR-1 & CCR-2), etc.

Designed & fabricated various Cable tray supports and other electrical & Instrumentations installation supports and Maintained Construction equipments like, Welding machines, DG Sets, Fork lifts, Hydraulic cranes, Boom trucks & Man lifts etc. And Prepared Weekly planning & scheduling and weekly reports for construction in Product Ware house.

Preparation of construction Materials as per planning and Controlled Material Inventory .Computed Safe working load for all Cable drum stands.

SHIFT IN CHARGE – HADEN INTERNATIONAL GROUP INDIA PVT.LTD.

SAINT GOBAIN GLASS INDIA LTD., (UTILITY OPERATION AND MAINTENANCE).(JULY 2002 TO DEC 2002

All types of operation and maintenance responsibilities in the following equipments.

Pretreatment Plant Equipments (Static and Rotating Equipments) and their connected accessories. Water Treatment Plant Equipments (Static and Rotating Equipments) and their connected accessories.

Cooling tower: Make Paharpur, Type:Cross flow induced draft, System Volume 600 M3. And Cooling tower fan RPM 1664 Type HP7 Glass Reinforced Epoxy blade,Fan.168”dia No. of blades 6, Steam Boiler Make: JN Marshal Ltd.

Capacity: 2800 Kg/hr, Working Pr. 12.25kg/cm2, Type; Packaged, Wet Back, 3 Pass, Fire tube. Air Compressors, Atlas Gapco, Mode; GA200w, Free Air Delivery; 614 Ltr/sec, Max Pressure; 7.5 bar and Model GA 110W

Free air delivery 338 liter/sec, Max Pr: 7.5 bar.

Effluent treatment plant equipments and their connected accessories .And Sewage treatment plant equipments. Capacity:180 KL / day. And Liquefied Petroleum Gas and Heavy furnace oil, storage and handling equipment. And Firefighting equipments and all type of pumps and valves.

MECHANICAL ENGINEER - DSM SOFT Pvt. Ltd.

SITE - RELIANCE PETROLIUM LIMITED JAMNAGAR, GUJRAT (AUGUST 1999 TO FEB. 2000)

Start up & Commissioning, Predictive, Preventive, Break down & Shutdown maintenance of the following equipments in Captive Power Plant:

BHEL and NUOVO PIGNONE Make Gas Turbines Frame # 6, Capacity 30 MW; Combine Cycle Co- Generation with Connected Equipments.

BHEL TBW DEUSCHE BABCOCK Make, Heat Recovery Steams Generator, Capacity 125 Tons/Hr, Pressure -139 kg/cm .Temperature – 500 deg.c : Single pass. Natural circulation, Vertical, with connected equipments.

TBW Make Auxiliary Boiler Capacity: 125 Tons/Hr, Pressure 135 to 139 kg/cm2, Temperature; 500 C, Two pass, Water Tubes with Connected Equipments. And GHH BORSIG Turbomaschinen Gmbh Make; Steam Turbine Generator,

Type: Dk 063/130 RE2, Capacity; 30 MW with Connected Equipments.

KG KhoslaMake Air Compressor, Reciprocating Type, Multistage, Double acting, Discharge Pressure; 9 kg/cm, Flow:1650 NM /hr (Normal ) and its accessories.

Feed Pumps, Dosing Pumps. Turbo Drives, Fans, Blowers, Heat Exchangers .And Wartsila Make, Diesel Generator, 3.3.MW, Vertical, No of cylinders 9+9, with connected equipments. Motor Operative valves, Heavy Duty Valves, Gear Boxes, Pumps and Mechanical Seals, Cooling Towers, Storage Tanks etc.

CONSULTANT – Prumotech Services Pvt. Ltd .

(Project: EID PARRY (I) LTD (JULY 1998 TO DEC. 1998)

Data Collection from various source of Records for Mechanical Equipments, Machineries & Materials, for Codification, Catalogue and Equipment Register. Preventive Maintenance planning and scheduling for Mechanical Equipments & Machineries, Documentation for equipment register for Asset Management System. etc.

SECTION ENGINEER-PLANT MAINTENANCE.

INDO MATSUSHITA APPLIANCES CO.LTD. (NOV.1996 TO NOV. APRIL 1998)

All kinds of Maintenance work in Plant Production Equipments; i.e.100Ton Godrej Mechanical Presses,300Ton Simomura

Mechanical Press,Body Curling Machine, Trimming Machine, Spot Welding Machine, 63T Blanking Press, Riveting

Machines 10Ton Mechanical Press, 40 Ton Godrej Press,Flow Bracker Machine, Paint Shop Equipments, Pre Treatment

Pumps, Fumes Exhaust Blowers, Chain Conveyor, 0.5 Ton Hoist, Acid Pumps, Air Tools, Radius Lathes, Belt Conveyors,

40 Ton Hydraulic Press, Aging Oven,Cast Heater Furnace, etc.

TP.04 Thermic Fluid Heaters and their Connected Equipments, 125 PSI, IR Compressors and their Connected Equipments, Cooling Towers 25T/R Chilling Plant, ACCEL Refrigerant Compressors, 250 KVA Kirloskar Cummins Diesel Generators and their connected accessories, etc.

ASST. PLANT ENGINEER

INDIA CASTORS LIMITED (NOV. 1995 TO NOV. 1996)

Erection and Commissioned Veesons Steam Boiler, Capacity 2500 Kg/hr, Working Pressure 10.54 kg/cm Type 3 pass fully

wet back. And Fire tube Oil fired boiler etc.

Screw Conveyor, Roller Conveyor,Belt Conveyor,Twin Screw Conveyor,Hydraulic Presses.Vibrating Screen, Expeller & Filters Press,StorageTanks, Bucket Elevator, Submerged Bore well Pumps, Cooling Towers, Process Pumps, Rotary feeder Food separator etc.

MECHANICAL TECHNICIAN

SRF LIMITED –UTILITY DIVISION (MARCH 1984 TO MARCH 1995)

Preventive and Breakdown Maintenance work and Annual Shutdown work in IAEC Steam Boilers, Capacity 4 MT/Hr,

Working Press. 10.5 kg/cm, Type 3 Pass, Fully Wet Back, Fire Tube, Oil Fired, Poly Fuel oil Boilers and Nylon 66 Steam boilers.SKL Diesel Generator Type Inline, Capacity 700KW, 1100 KVA, 428 RPM with Connected Equipments Yanmar Diesel GeneratorTypes GLETC, Capacity 1600KW and 2000KVA, 750 RPM with Connected Equipments SKL Diesel Generator V type capacity 1160KW, 1450KVA, 1000 RPM with connected equipments.

Khosla Air Compressors, Reciprocating Type, Pressure 7.8 to 14 kg/cm, Ingersoll Rand Air compressors,Reciprocating Type Pressure 8.6 kg/cm, Discharge Capacity 1000 Nm3 /Hr. A/C. Plant 1790 Tons of refrigeration, Make Blue Star and Kirloskar with connected equipments. Water Treatment Plant and DM water plant equipments. Effluent Treatment Plant equipments Nitrogen plant equipment and Air dryer. Air Blowers, Centrifuges, Cooling Towers and Centrifugal Pumps, etc.

SRF LIMITED – PRODUCTION PLANT EQUIPMENTS

Breakdown, Schedule and Preventive Maintenance Work in Draw Twisting Ply and Cable Twisting Machines, Coning Machines, Butt and Pirn Winding Machines, Fork Lifts of 1 to 2 Ton Capacity.

Shutdown Work and Preventive Maintenance work in Static Equipments, i.e.StorageTanks, Condensers, Cyclone Separator V.K. Tubes, Aging tank, Drying tower, Washing towers, Cooling Towers, Heat exchangers, etc.

PREVIOUS EMPLOYMENT

March 1982 – March 1984, The KCP Ltd, Chennai-Company in plant Maintenance Technician Trainee

September 1980 – September 1981, MRF LTD, Chennai-National Apprenticeship

And some other Industries worked as Maintenance Manager/ Senior Engineer/ Executive in Organic Chemicals, Steel Industries.

TRAINING ATTENDED

5-S, ISO 9001- 2000, In plant Training,Work Shop Training, Bearing Maintenance & Technology, Mechanical Seal Fundamental, RCM,RCA& PTW,

HSE Plan for Major Shut Down, Confined Space Entry, H2S/ BA Awareness, Work at Height, Fire Fighting etc.

PROFESSIONAL CERTIFICATIONS

Certified Bearing Maintenance & Technology by SKF Saudi Arabia Ltd.

Certified Mechanical Seal Fundamental by Flow serve.

EDUCATION & CREDENTIALS

BACHELORE OF MECHANICAL ENGINEERING – A GRADE - 2015

Asian Institute Of Engineering And Management-Delhi.

Diploma in Mechanical Engineering (DME) – First Class - 1991.

State Board of Technical Education and Training, Department of Technical Education, Madras.

Chengalvaraya Naicker Polytechnic- Chennai.

(I.T.I) Course in Mechanical Fitter First Class -1980.

Government Industrial Training Institute – Thiruvannamalai – Tamil Nadu.

National Council for Training in Vocational Trade, National Trade Certificate.

Foundation Course II year (Pre University Course) – II Division - 1986.

Annamalai University – Annamalai Nagar- Chidambaram- Tamil Nadu.

Computer Skills : Microsoft Office – Word, Excel, Power point, Internet. Outlook Express, and Microsoft Windows.

PERSONNA L DOSSIER

FATHER’S NAME : SRI. R. THAMODARA ACHARI

PASS PORT NUMBER : K 0341008:

LANGUAGES KNOWN : ENGLISH, TAMIL (SPOKEN HINDI)

DATE OF BIRTH : 01/03/1962

PRESENT & PERMAMNT ADDRESS : PLOT NO.23, SRI RAM NAGAR, MAIN STREET,

SELAVOYAL, M.M.C. POST, CHENNAI – 600051. TAMIL NADU, INDIA.

RELIGION & NATIONALITY : HINDU & INDIAN

ABROAD EXPERIENCE : KUWAIT, QATAR, SAUDI ARABIA, ABU DHABI & OMAN. MARTIAL STATUS : MARRIED



Contact this candidate