Post Job Free
Sign in

Highlights of Qualifications Able to take the lead in developing a new

Location:
Rawlins, WY
Posted:
October 20, 2020

Contact this candidate

Resume:

ROBERT MURPHY

PO Box ***

Sinclair, WY *****

Home: 307-***-**** Cell: 307-***-**** *********@*****.***

NATURAL TEAM LEADER INNOVATIVE DESIGNER MECHANICAL EXPERTISE MULTI DISCIPINE DESIGN 3D VISUALIZATION 3D MODELING QUALITY CONTROL

Highlights of Qualifications

Able to take the lead in developing a new design concept and integrate it into the final design packages. Provide a field feasibility studies, when making a determination on customer (operations) needs. Able to collaborate with all disciplines to meet protocol and application needs. Interact with multiple disciplined Engineers to integrate each functionality. Capable in preparing or revising Piping & Instrumentation Diagram's to improve new or revised functional process of equipment, pumps, valves, vendor interface and other related components. Able to review/check, evaluate client specifications, equipment requirements, 3D Modeling, spooled Isometrics to meet Piping & Instrumentation Diagram's with accuracy. Capable of overseeing shop fabrication, assembly and meet field installation requirements. Be open to potential customers (operations) when updating function ability in the Plant process Areas. Prepare 3D model of piping, valving, support mechanisms, miscellaneous steel and equipment layouts. Not limited to mechanical. Make provision for HVAC, cable trays, platforms, steel/concrete building structures, lighting, monorail supporting systems, etc. Prepare Structural 3D models of Structures and finalize structural Design Drawings and issue for fabrication.

Skills

Natural Team Leader

Self-motivated

Professional Communicator

Mechanical Expertise

Good Work Ethics

Trusting Relationships

Loyal and Trustworthy

Engaging Presentation

Quality Control Assessment

Intuitive Problem Solving

Attention to detail

Innovative Designer

3D visualization Safety Conscious

Time Management

AutoCAD 2014/2016-2019

PDS Customization - 1996

PDS Piping Model Creation

PDS 3-D Orthographic

PDS Isometric Extractions MicroStation V8i 2016 MicroStation Open Plant

2014 SolidWorks Essentials

CADWorx 2014/15/17-2019

Navisworks 2014/2017-2019

SolidWorks Essentials 2014

2016-2019 Microsoft Office

Experience

SinclairOil & Gas Refinery – Consultnet LLC 9/15/2017 – 6/26/2020

PIPING DESIGNER

· Perform 3D modeling design/layout of equipment, piping, miscellaneous supports in the tank farm, truck loading facility, Alky Unit, Boiler House, Reformer, Crude Unit, Coker Unit and utilizing CADWorx 2017 – 2019. Produced Isogen Isometrics shop drawing for fabrication. Insure conformance with procedures, good engineering practice codes, specs, and timely issue. Create Navisworks 3D models for viewing piping and equipment layouts for Project Reviews. Initiate safety procedure compliance training and meet annual training schedule for Contractors associated within Engineering Department.

PUBLIC WORKS PROJECTS

SENIOR CAD DESIGNER

WATERWORKS ENGINEERING, Pleasant Grove, UT, 2/2016—9/2016

Prepare Piping Layouts of Force main Sewer lines in residential street right of ways using AutoCAD Civil3D CAD program. Layout junction boxes, vortex odor control vaults, yard piping and overlay topographic photos and topo surveys. Create 3D structures, equipment and piping through the use of MicroStation Open Plant modeler. Layout 3D model of existing facilities for future expansion.

DRAFTING / DESIGN

CAD DESIGNER III

NES Global Talent contracted to Campos EC, San Ramon, CA, 7/2015—2/2016

Prepare Piping Layouts of main Natural Gas Lines in San Francisco Bay Area and Sacramento area for PG&E. Layout Pig Launchers and Receivers and overlay aerial photos and topographic surveys. Interface with AutoCAD software in using Cadworx for deliverable 3D presentation drawings. Use MicroStation software to complete final design construction drawings.

FACILITIES DESIGN / Upstream Natural Gas Production

SENIOR PIPING DESIGNER

Precision System Engineering, Sandy, UT, 7/2014—6/2015

Perform design/layout of equipment, high pressure piping systems, pipe ways, process facilities and utilizing CADWorx 3D, Isogen, Orthogen and AutoCAD 2014 prime software to create new shop drawings. Insure conformance with procedures, good engineering practice codes, specs, and timely issue. Generate 3D isometric drawings and Ortho piping drawings of new/existing Gas and Oil facilities. Re-trofit existing equipment and piping systems. Final review and checking of isometrics and ortho drawings. Coordinate with other design disciplines, seismic calculations, and Civil/Structural groups.

CAD DESIGN

CAD SUPPORT TECHNICIAN VI

URS Corporation (AECOM), Boise, ID, 2/2001—8/2014

· Provide input in the development and maintenance of CAD standards for CAD production.

· Provide new/retro-fit design developments of equipment, piping, support mechanisms, steel/conc. structures

· Prepare design change notices to facilitate construction of revised or new design packages in a timely manner.

· Interact with Operations, System Engineers, Environmental, Quality Assurance and other disciplines to expedite critical path items related to design and systemization activities.

· Prepared, redrawn new and improved P&ID's to improve complex mechanical process systems.

· Maintain/update piping, mechanical process and HVAC system documents by redlining or by document revision and generate new design drawings of new piping processes, including new equipment layouts.

· Provide field walk down and problem resolution assistance; with priority given to Environmental Quality and state regulations (RCRA) given in plant safety in operations and public safety.

· Review Project design and other documents for operations and maintenance prior to system turn-over.

· Perform 3D layout designs of Rinsate Collection System: Chemical Agent process to Liquid Incineration Furnace (inside a lethal environment), Brine Reduction piping: double wall containment with heat trace and freeze protection (from pipe rack to underground trench via tanker loading) Boiler Feed Water: hot water flush piping and Brine Reduction service pump with associated piping.

Umatilla Chemical Agent Disposal Facility - Army Corps of Engineers

PRINCIPAL DESIGNER

Infrastructure Division - Parsons Corporation, Pasadena, CA, 6/1998—2/2001

· Support field construction: feasibility studies, surveillances, and solves field design problems of piping and HVAC system design.

· Instrumental in developing Redline Tagging procedure to provide system management of construction, design changes and issued new updated drawings to reflect redline changes per Microstation V7 CAD files

· and tracking matrix through the use of Excel and Access database.

Holly Sugar Plant - DESIGN

SENIOR PIPING DESIGNER / MECHANICAL PLANS CHECKER

MCE Technical Services, Richland, WA, 10/1997—12/1997

· Support field/design activities in equipment layout, retro-fitting conveyor and mechanical process systems.

· Perform feasibility study of plant design, troubleshoot, and rework problem areas for ease of maintenance and operations. Facilitate construction efforts, provide miscellaneous design of hoppers, equipment, piping, and support mechanisms. Reviewed piping design drawings, isometrics and orthographic drawings.

· Initiate final design drawings for construction.

Great Lakes Chemical Plant - Design

SENIOR PIPING DESIGNER

National Engineering, Newport, TN, 11/1996—5/1997

· Provide feasibility studies of existing vessels and new design of Equipment and Piping.

· Layout equipment and pharmaceutical type piping/general arrangement plant

· Facilitate construction efforts, provide miscellaneous design of hoppers, equipment, piping, and support mechanisms. Reviewed piping design drawings and isometrics.

· Generate hand drawn piping isometrics and equipment/process piping layouts, and utility piping tie-ins.

Merck Pharmaceutical process facility - DESIGN

SENIOR PIPING DESIGNER

John Brown Engineers, Albany, GA, 7/1996—11/1996

· Perform design/layout of equipment, tank farm, truck loading facility and isometric piping, utilizing Intergraph Microstation 5.0 to insure conformance with procedures, good engineering practice codes, specs, and timely issue. Generate 3D isometric drawings. Familiar with PDMS piping and equipment layouts

LA Metropolitan Water District

LEAD MECHANICAL DESIGNER

Butler Service Group, Los Angeles, CA, 8/1992—7/1996

· 2D and 3D (PDS / Plant Design System software) Plant layout of structures and site topography.

· 3D Modeling of piping systems, HVAC and utilities, associated equipment of Chemical Storage/Feed Systems, underground trenches and tunnels, Railroad unloading, Sulfuric Acid Storage/Feed System,

· Chlorination Feed/Injection system, Sludge Separation/conveyor /Truck unloading System, and Ozonation Peroxone Treatment Facility and Contactor Treatment Facility.

· Assign duties to Designers and drafters for orthographic drawing production, used for final design and deliverable on Intergraph 2D & 3D CAD NT Microstation version 5.0 prime software.

Mobil, Shell and Exxon Projects

PIPING DESIGNER

The Ralph M. Parsons Company, Pasadena, CA, 9/1989—8/1992

· Layout LAX Mogas jet fuel storage, distribution and major pipe way systems, pumping station, tankage, heat exchanger, boilers, sulfuric acid piping system, water deluge system and offsite revamps.

· Review and generate piping isometrics of shop drawings. Provide MTO's, field change notices and validate Client Specifications, Equipment requirements and ensure P&ID accuracy.

MATERIAL CONTROLS / ESTIMATING

SENIOR MATERIAL CONTROLLER / Gas and Oil Refinery facilities

The Ralph M. Parsons Company, Pasadena, CA, 3/1989—9/1989

Performed plot plan and P&ID material take-off estimate of Piedo Bay Facility, Northslope Alaska oil/gas modules, and North Korea Yukon oil / gas plant facilities.

· Perform major material take-offs, weight totals for placing materials on shipping modules sent to Alaska and material controls by utilizing computer (DMC's) prime software. Cost estimates for piping, freeze protection, steel, and misc. components used for actual construction.

Mariposa Chevron Gas Plant Facility – Maintenance Dept.

Vans Constructions, Santa Maria, CA, 9/1987- 3/1989

MAINTENANCE SAFETY COORDINATOR

Developed and organized a detailed safety/preventive maintenance inspection program. Generated engineering plans with scope of work required to maintain and repairs on plant safety equipment. Provide feasibility study of field construction & safety related piping and equipment. Generated CMMS computer system to track public safety, plant security incident reports and construction progress to which meets county public safety under the direction of operations and engineering.

Mariposa Chevron Gas Plant Facility in CA – Sub Contract

ENGINEERING ASSISTANT

Project Construction Co, Denver, CO, 5/1986—9/1987

· Responsible for overseeing heavy construction and design of steam tracing, trap manifolds, sulfur pit, steam jacketed sulfur piping, and process piping throughout gas plant and generated new design of isometrics.

Mariposa Chevron Gas Plant – Construction Engineering (Heavy Construction)

FIELD PIPING ENGINEER

Hardaway Constructors, Gaviota, CA, 10/1986—4/1987

· Responsible for areas were acid gas removal, caustic scrubber, tail gas, double jacketed sulfur piping with freeze protection, including steam injection, condensate piping, flare piping and flare stack construction.

· Coordinate field construction efforts with client and project engineers.

· Performed routine constructability inspections, include NDE welding applications.

· Initiated design change notices, material take-offs and 3D design sketches to assist the craftsmen.

· Provide piping feasibility studies and generate restoration punch list.

· Provided a Reconciliation Study of final construction phase, (Balance of Plant performance review)

DESIGN ENGINEERING STUDIES:

16 years of experience Chemical Disposal Facility: Rinsate Collection System, Chemical HD Agent process to Liquid Incineration Furnaces, Brine Reduction piping: double wall containment with heat trace and freeze protection, Boiler Feed Water: hot water flush piping and Brine Reduction service pump with associated piping, Retro-fit existing design - High pressure steam supply inside a lethal environment for agent cleaning, Toxic cubical 3D model layouts of Heal Transfer System – (Toxic blister agent known as chlorinated sulfur, an oil base fluid transferred to furnaces) – of Rinsate Collection System – of agent HD Glovebox and exhaust HVAC system study and agent process and tank studies. Lethal work environment. High priority in Safety Design and Operational functionality.

Four years experience of Water treatment facilities: Ozone Production and Utilization of Ozone/Peroxone at Jensen and Mills Filtration Plant facilities, Jensen Plant Makeup LOX design study, Jensen Oxygen Plant design study, Jensen Filtration Plant Contactors, Chemical storage and feed system, Sulfuric acid storage and distribution.

Ten years experience of Petrochemical and refineries: Oil and Gas storage and distribution system, refinery revamps, major pipeways, pumping stations, heat exchangers, boilers, hf sulfuric acid piping systems, field coordination, underground replacement studies and oil recovery, Steam injection / oil recovery.

Eight years experience of Nuclear power plants: Piping Designer: Coolant (liquid sodium) circulation piping system design. BWR/PWR reactor shutdowns retro-fit and post start-up system design and perform feasiblity studies of quality level II inspection of piping, HVAC and supports NDE qualifications. Troubleshoot, reworked problem areas; Perform QA level II piping system final verification for post start-up. Prepared restoration punch list, initiated field change notices. Provided calculated thermal and seismic movements for piping and instrumentation systems. Re-design piping Systems related to Three Mile Island Incident at Oyster Creek Facility.

Nuclear Projects:

Fast Flux Testing Facility – Breeder Reactor - Bechtel Power- Richland, WA – Piping Designer

Washington Public Power Supply System (WPPSS# 2) WBG Inc. – Richland, WA – Piping Design / Plans Checker

LaSalle County Generating Station – Marseilles, IL., CDI Corp. – Engineering Supervisor

Midland Nuclear Power Plant – Midland, MI, Comstock Engineering – Instrumentation Designer

Clinton Power Station – Clinton, IL (Contracted) System Walkdown Engineer – Piping Design

Oyster Creek Nuclear Power Station – Forked River, NJ (Contracted) Piping Designer

PGE Diablo Canyon Nuclear Power Plant, Avila Beach, CA – Pullman Power Products Corp. Level II Inspector – Piping, Structural Supports and Hangers – NDE Application

Education

Drafting Technology

Walla Walla Community College, Walla Walla, Washington

Advanced Topography - 3 dimensional layouts of topo's

Mechanical Drafting & Design

Mechanical Machine drafting

Civil / Architectural

Chemeketa Community College, Salem, Oregon Civil computations and Stadia Equipment operations

Architectural Design

CAD Technology

Columbia Basin College, Pasco, Washington

AutoCAD II - 2014

Certifications

Intergraph: PDS Customized Training - 1 week Intergraph/TPDS1003: Workstation and MicroStation Use for PDS 3-D Intergraph/TPDS3002: Creating Equipment Models Dwgs with PDS 3-D

Intergraph/TPDS3003: Creating Piping Models Dwgs with PDS 3-D

Intergraph/TPDS3004: Extracting Orthographic Dwgs with PDS 3-D Quest Integration: Solidworks Essentials 2014

Honors/Awards

INNOVATION AND RECOGNITION AWARDS:

· 2011 Pyramid Award / Presented by UMCDF Project General Manager, Steve Warren

· 2011 Presidents Award / Presented by URS - Federal Services President, Randy Wotring

· 2002 Winners Choice Award / Presented by Washington Group International – UMCDF Project Manager, Loren Sharp

Additional Information

· NavisWorks 2014 /2017-2019 3D model loading/viewing applications / June 2014 thru July 2015, Sept 2017 thru Present (Oct 2019)

· UMCDF NT-111 Math and Physics Class for WTP workers / June 2011

· Intergraph IGDS 2D with Ralph M. Parson / May 1992

· MicroStation version V5 and Modelview with Metropolitan Water District

· CAD Training by Intergraph Representative 4th St. Los Angeles (MWD).

· Intergraph IGDS 3D (PDS) Database Equipment & Piping Solid Modeling

Professional References

Waterworks Engineering:

Dave Torgersen

Civil Engineer 801-***-****

Email: **********@*****.*** or **********@*****.***

Campos EPC Engineering:

Terry Banta

Lead CAD Designer 720-***-****

Email: *****.*****@*********.***

Precision System Engineering:

Dave Peterson

Lead Piping/Mechanical Designer 801-***-****,

email: ************@*****.*** or *********@*******.***

URS Corporation (Aecom):

William Hampton

System Process Piping Engineer,

541-***-****, Email: *************@*****.***

Dave Lorenzen

Civil/Structural Engineer, 253-***-****

Email: ********.****@*****.***

Bob Vance:

Piping Process Engineer,

208-***-****, Email: ********@********.***



Contact this candidate