Mob : +91-999******* Mail :adg4ub@r.postjobfree.com
SKYBE ID :nithya.manav
CURRICULUM VITAE
K . MANAVALAGAN WELDING INSPECTOR
CV SUMMARY :
. I am an Diploma holder in Mechanical Engineering and CSWIP 3.1 certified welding inspector .Also I have ASNT Level II in RT, UT, MPI, and DPT. Total 12 Years of experience in Quality Control of WELDING,NDT, PIPING for Thermal Power Stations, Oil & Gas Projects like ARAMCO,KOC,GASCO,SABIC,PDO,NLC,EXXON MOBIL
KEY SKILLS:
Welding inspection of Piping,Structural, PWHT, Hardness Testing, Non destructive testing(UT,PT,RT,MT), PMI
Piping Hydro test,Line walk,Test package, Pre-commissioning of Piping(such as Bolt Torqueing,Flange Alignment,Valve installation,Piping Reinstatement ),
Heat exchanger Maintenance
Boiler,Bunker, ESP Erection
Material Handling:
A106 Gr. B, A333 Gr.6 (Low- Temp. CS) A335 Gr.P11 (Alloy Steel),A312 Gr.304, 304L, 316/316L (SS).Duplex stainless steel A970,
Codes Knowledge and Specification:
ASME IX, B31.3,ASME SEC II, AWS D1.1,ASME SEC VIII,ARAMCO SPECIFICATION (W-011 etc..)
SP 1096,SP1097
Welding Process Handling:
SMAW, GTAW, SAW, MIG
EDUCATION &TECHNICAL CERTIFICATION
Diploma in Mechanical Engineering (D.M.E)at TEPT( YEAR 2002),INDIA.first class with (70))
CSWIP 3.1 (10 YEAR RENEWAL Certificate No : 359369 EXPIRY DATE: 1 MARCH 2024
NDT LEVEL II : UT, RT,MPI,LPT, TRICHY,TAMIL NADU,INDIA
COMPUTER KNOWLEDGE
MS-OFFICE, QMIS,
Known languages
TAMIL,ENGLISH,MALAYALAM
WORK EXPERIENCE:
EMPLOYER : ENKA & KENT JV, BASRA, IRAQ
DURATION : JUL 2018 TO MAY 2019
Client : EXXON MOBIL
Project :INITIAL OIL TRAIN(IOT)
Position :QC Welding Inspector
Responsibility includes:
Checking joint fit-up & Monitoring and controlling welding consumables
Familiar with welding inspections that is before, during and after welding activities at site
Ensure and follow up for all open RFIs & close RFI’S on time.
Familiar with PMI, Hardness, PWHT tests etc
Handle with various materials like A106 Gr. B, A333 Gr.6 (Low- Temp. CS) A335 Gr.P11 (Alloy Steel),A312 Gr.304, 304L, 316/316L (SS).
Inspecting fit up and welding as per WPS & client specification and ASME B31.3
Monitoring welding as per proper WPS.
Monitoring welding consumables, storage and usage as per project specification
Knowledge in materials as per ASME section ll – A
Ensuring that all installed pipe/fittings are to the correct specification and that the material is in accordance with the specified Material Traceability requirements.
Issuing and closing the NCR and log book entry.
Monitoring all welding activities like a Calibration of welding equipments, measuring instruments, Consumables Handling, Welder ID, Inter-pass Temperature etc.
Monitoring welder repair rate.
Review Test Certificates, Reports & Other Documents.
Establish, implement and maintain all the site quality control, technical and any computer integrated control systems.
Conducting tool Box meeting.
Knowledge in fittings flanges ASME 16.5/16.47/16.9/16.11
Preparing the punch list items as per P & ID and Isometric such as, Pipe supports, Valves,Guides, Shoe supports and NDT completion and approving/ releasing packages for hydrotes
Witness hydro test and pneumatic test with client inspector
Piping reinstatement inspection activities (such as bolt torqueing,flange alignment,valve installation,piping reinstatement )
Rise and close Log book Entry and NCR
EMPLOYER : ARCC,(AL SUWAIKET)SAUDI ARABIA
DURATION: JAN 2017 TO MAY 2018
Position :QC Welding Inspector
Client : SAUDI ARAMCO
Contractor : JGC & DAEWOO JV
Project : Naptha& Aromatics Project,Jizan,Saudi Arabia
Position : QC Welding Inspector
Responsibility includes:
Check the quality of welded fabrications for fit up, consumable, visual appearance of the weld and the distortion.
Rise and close Log book Entry and NCR
Conduct weld audit and ensure that welding parameters are conformance with WPS.
Prepare heat treatment operating sheet & verify the chart for (heating & cooling rate, soaking period & temperature).
Will monitor the performance of welders, while implementing and monitoring proper storage and usage procedures for welding tools and equipment
Follows inspection and test plan for the welding works and carries out the various stage inspections and tests, records findings, prepares various reports.
Investigates/anticipates work problems and takes/recommends suitable action to correct deficiencies.
Checking the applicability of the WPS utilized for the work being performed and ensure compliance with regard to preheat, consumable and welding parameters
Receives and implement instructions, documents, technical specifications and details regarding probable welding requirements.
Observed safety procedures and strictly followed golden rules of safety work, (confined space, Working at heights, PPE, Excavation, Lifting etc.
Knowledge about various code like ASME IX,B31.3,ASME SEC II,AWS D1.1
Employer : ANABEEB,OMAN
Company : Oman LNG
Project : Oman LNG Train 3 Shutdown Project
Position : QA/QC Engineer
Duration : Oct. 2016 to Nov. 2016 (Shutdown Project)
Job Descriptions:
Inspection Activities in Heat Exchanger, Column, Reactor
Hydro Test in Heat Exchanger
Employer : Kharafi National, Kuwait
Contractor : Saipem (Italy Based EPC)
Company : Kuwait Oil Corporation, Kuwait
Project : BS-171 Booster Project
Position : QC Inspector (Piping & Welding)
Duration : Feb 2015 to Jan 2016
Job Descriptions:
Fit up and Welding Inspection.
Ensure and follow up for all open RFIs& close RFI’S on time.
Ensuring that all installed pipe/fittings are to the correct specification and that the material is in accordance with the specified Material Traceability requirements.
Reviewing final Packages for Hydro tests, approving & releasing for Hydro test.
Preparing the punch list items as per P&ID and Isometric such as, Pipe supports, Valves,Guides, Shoe supports and NDT completion and approving/ releasing packages for hydro.
Monitoring all welding activitieslike a Calibration of welding equipments, measuring instruments, Consumables Handling, Welder ID, Inter-pass Temperature etc.
Monitoring welder repair rate.
Familiar with Test Pack, RFI, NCR.
Ensure that all Welding, Heat Treatment, any hardness testing, Inspection and Non-destructive testing are in compliance with the relevant codes and specifications.
Review Test Certificates, Reports & Other Documents.
Establish, implement and maintain all the site quality control, technical and any computer integrated control systems.
Checking joint fit-up & Monitoring and controlling welding consumables.
Familiar with PMI, Hardness, PWHT tests etc.
Conducting tool Box meeting.
Knowledge about various codes: ASME 1X, B 31.3, ASME SEC II etc.
.
Employer : Daelim Engineering Construction Ltd.YANBU Saudi Arabia
Client : YASREF(Yanbu Aramco Sinopec Refinery)Yanbu, Saudi Arabia
Project : EPC-3
Position : QC Inspector (Welding)
Duration : Apr. 2012 to Dec. 2012
Job Descriptions:
Fit up and welding inspection.
Inspection and continuous monitor of welding and piping activities at Fabrication shop also at site.
Inspection activities are carried out as per Quality Plan, Project Drawings and specifications.(As per Aramco Standards(E.g.SAES-W-011,SAIC,SATIP(ITP)
Witness and review of Positive Material Identification as per ASME Sec II and client requirements.
Ensure and follow up for all open RFIs& close RFI’S on time.
Ensuring that all installed pipe/fittings are to the correct specification and that the material is in accordance with the specified Material Traceability requirements.
Issuing and closing the NCR and log book entry.
Monitoring all welding activities like a Calibration of welding equipments, measuring instruments, Consumables Handling, Welder ID, Inter-pass Temperature etc.
Monitoring welder repair rate.
Ensure that all Welding, Heat Treatment, any hardness testing, Inspection and Non-destructive testing are in compliance with the relevant codes and specifications.
Review Test Certificates, Reports & Other Documents.
Establish, implement and maintain all the site quality control, technical and any computer integrated control systems.
Conducting tool Box meeting.
Knowledge about various codes: ASME 1X, B 31.3,ASME SEC II etc.
Handle with various materials like A106 Gr. B, A333 Gr.6 (Low- Temp. CS) A335 Gr.P11 (Alloy Steel),A312 Gr.304, 304L, 316/316L (SS).
Coordinate with Construction team,sub-con QC and Clint inspectors.
Knowledge about the safety aspects.
Employer : JGC,HABSHAN,ABU DHABI
Client : GASCO
Project : HABSHAN 5
Position : QC Inspector (Welding)
Duration : JAN 2011 TO JUN 2011
Job Descriptions:
Fit up and welding inspection
POSITIVE MATERIAL IDENTIFICATION OF SS(316/316L,P5 etc..). AND ALLOY MATERIAL.
Issuing and closing the NCR and Log Book Entry.
Monitoring welder repair rate.
Ensure that all Welding, Heat Treatment, any hardness testing, Inspection and Non-destructive testing are in compliance with the relevant codes and specifications.
Review Test Certificates, Reports & Other Documents.
Establish, implement and maintain all the site quality control, technical and any computer integrated control systems.
Conducting tool Box meeting.
Knowledge about various codes: ASME 1X, B 31.3,ASME SEC II etc.
Handle with various materials like A106 Gr. B, A333 Gr.6 (Low- Temp. CS) A335 Gr.P11 (Alloy Steel),A312 Gr.304, 304L, 316/316L (SS).
Coordinate with Construction team,sub-con QC and Clint inspectors.
Knowledge about the safety aspects.
Employer : Daelim Engineering Construction Ltd.Jubail,Saudi Arabia
Client : SABIC
Project : HDPE - Saudi Kayan Petrochemical Complex
Position : QC Inspector (Piping & Welding)
Duration : July 2009 to Aug. 2010
Job Descriptions:
Inspection and continuous monitor of piping activities at Fabrication shop.
Witness and review of Positive Material Identification as per ASME sec II and client requirements.
Spool fabrication in shop and site activities are carried out as per project drawings and specifications (SABIC Standards).
Fit up and welding inspection.
Monitoring all welding activitieslike a Calibration of welding equipments, measuring instruments, Consumables Handling, Welder ID, Inter-pass Temperature etc.
Monitoring welder repair rate.
Ensure and follow up for all open RFIs,close RFI’S on time.
Ensuring that all installed pipe/fittings are to the correct specification and that the material is in accordance with the specified Material Traceability requirements.
Issuing and closing the NCR and Log Book Entry.
Conducting tool Box meeting.
Review of test packages and generate punch.
Conduct punch listing prior to flushing/hydro testing of piping.
Line inspection with client inspector.
Witness and approve pressure test (Pneumatic & Hydro) and loop packages prior to mechanical completion.
Review Test Certificates, Reports & Other Documents.
Establish, implement and maintain all the site quality control, technical and any computer integrated control systems.
Knowledge about various codes: ASME 1X, B 31.3 etc.
Handle with various materials like A106 Gr. B, A333 Gr.6 (Low- Temp. CS &SS (NACE) A335 Gr.P11 (Alloy steel), SA 312 Gr.304, 304L, 316/316L (SS),321.
Knowledge about the safety aspects.
Employer : Al Hassan Engineering Co. S.A.O.G. Oman
Contractor : GS Engineering Construction, Oman
Company : SalalahMethonal Company, LLC, Oman
Position : QC Welding Inspector
Duration : Jan. 2008 to July 2008
Job Descriptions:
Welder Qualification &Fab Shop Welding Activities&Erection.
Checking with welding consumables to before welding, during welding and after welding.
Check consumable handling, as per method statement.
Check the raw material testing certificates & Heat No.
Check the welding machine calibration certificates.
Check the fit up and edge preparation before welding as per ISO drawing & WPS. Preparing fit up Report.
Check the welding activities & Visual welding check. Prepare welding Report.
Co-ordinate with client.
Prepare the NDT request as per the client requirement.
Check the NDT result & Monitoring the repair status.
Inspection of field joint surface preparation, coating and wrapping.
Line checking, Spool verification and monitoring the pneumatic test and flushing activities.
Knowledge about various codes: ASME IX, B 31.3 etc.
Employer : SPICJEL Engineering Construction Ltd. Neyveli, Tamil Nadu, India
Now EDAC Engineering Limited, Chennai
Contractor : BHEL India
Company : Neyveli Lignite Corporation, India
Project : 2 x 250 MW, Thermal Power Station II Expansion
(Boiler, Bunker, ESP Erection)
Position : QC Inspector
Duration : Jan. 2007 to Dec. 2007
Job Descriptions:
Welder Qualification (CS / Stainless Steel) &Fab Shop Welding Activities &Erection.
To check the material filler wire, Batch No & Test certificates.
To check dimension as per drawing.
To checking with welding consumables to before welding, during welding and after welding.
Check that a consumable handling as per method statement.
Check the raw material testing certificates &Heat No.
Check the welding machine calibration certificates.
Check the fit up and edge preparation before welding as per ISO drawing &WPS
Check the during welding activities &visual welding check.
Co-ordinate with client.
Prepare the NDT request as per the client requirements.
Check NDT result &monitoring repair status.
Employer : K.G.B Inspection Services, Thuvagudi,Trichy, India
Client : BHEL (Sub –contractors) GB Engg, Suzlon (Wind Mills), Thermax,
AnandEngg.KothariSugars, Pipelines & Processing (P) Ltd.
Position : QC Inspector
Duration : Oct. 2002 to Dec. 2006
Job Descriptions:
Inspection and Witnessing the liquid Penetrate Testing, Magnetic particle Testing and Ultrasonic Testing, Radiographic.
Witnessing of welder qualification test and prepare the welder performance certificates as per ASME Sec IX.
Visual inspection of Before welding and welding on progress &After welding.
Radiographic film Interpretation and Reporting.
Visually check the raw material identification as per the client spec.
Inspection and witnessing hydro test and leak test.
Check with welding consumables and raw material Testing certificates.
Prepare the documentation for all Inspection related results.
PERSONAL DETAILS:
Date of Birth : 16th April 1979
Nationality : Indian
Languages : Tamil & English
Passport Details : Pass Port No :U7020060 Valid From : 14/02/2020 TO 13/02/2030.
(MANAVALAGAN KALIYAMOORTHY)