SATISH MUTHYALA
An enthusiastic and high-energy driven professional; targeting assignments as Site Manager / Project Engineer in Electrical Department with an organization of repute
adg2uf@r.postjobfree.com
PROFILE SUMMARY
Result-oriented professional with 13 years of rich and extensive experience in Construction of EHV Sub Stations / Transmission Lines, Designing, Installation, Testing & Commissioning and HSE
Familiar with Engg. drawings, standards, codes and statutory regulations/plant performance improvement tools
Hands-on experience in administering project activities from conceptualization to execution including technical specifications, procurement/supply of raw materials, stage inspections, scheduling, progress monitoring, site management and manpower planning
Excels in heading Erection, Testing & Commissioning activities delivering consistent high degree of performance
Expertise in resolving technical issues through root cause analysis of problems and initiating corrective actions
Skills in coordinating with Safety Engineers regarding HSE procedures and LPP Practices
Implemented various quality standards and techniques for improvement in project operations along with cost savings
Honored member of Saudi Council of Engineers ID: 300452
Strong analytical, troubleshooting and interpersonal skills with proven skills in driving cost saving initiatives during the career span
EDUCATION
2015
PG Diploma in Fire & Safety
Simhapuri University
2007
B.Tech. (Electrical & Electronics Engineering)
JNTU, Hyderabad
CORE COMPETENCIES
Electrical Construction
Project Planning & Management
Quality Assurance & Control
Materials/ Equipment Management
Procurement & Vendor Management
Client/ Stakeholder Management
Workplace Safety & Training
Troubleshooting/Root Cause Analysis
Erection & Installation
GIS and AIS Substations
IT SKILLS
Language : C, MATLAB (Simulink)
Applications : M.S Office
Design : MicroStation
WORK EXPERIENCE
Site Manager (Electrical)
Mar’16 – Jul’20; Tareg Al-Jaafari Cont. EST, KSA
Key Result Areas:
Monitored GIS Substation (115KV/13.8KV) activities and collaborated with the site team and management for discussing ongoing and ahead activities
Administered activities right from the conceptualization stage to the execution, involving budgeting, finalization of technical specifications, procurement, scheduling, progress monitoring and manpower planning
Coordinated with the Engineering discipline to review & monitor, Method of Statement & Installation procedure and sequence, Vendor drawings and Procedures & so on
Liaised with the Engineering, Quality Control, maintaining Quality Records, Subcontracts, Document Control, Commissioning, Planning Departments for completion of construction activities
Attended daily review meetings with the subcontractor to discuss progress achieved as well as a forecast for the following week in addition to any other issues which need to be resolved
Provided Technical Engineering guidance
Performed Work Inspections and Material Inspections as and when needed
Conducted audits & various risk inspections including Safety Audit
Established SOPs and policies for the engineering & technical work and adhered to all organizational rules & regulations to achieve organizational goals; provided necessary support for Job Safety Analysis (JSA) /Task risk assessment (TRA)
Coordinated with procurement department in Major equipment’s delivery schedule so as to be ready for installation (fabrication, foundations)
Troubleshoot problems right from fabrication, inspection, testing, rectification, erection and commissioning
Prepared daily progress reports, 3-weeks schedules and Bi-weekly reports
Reviewed IFC drawings and prepared BOQ’s, BOM’s and Cable schedule as per the approved drawings also Reviewed & Prepared As-built drawings for Client approval
Collaborated with the testing team for pre-check, commissioning, open-loop & closed loop Activities also taken steps clear the punch list (walk Through & CSD) of all types (A&B)
Projects Executed:
Construction of 115/13.8KV Meena-2 GIS Substation
Period: Nov’18 – Jul’20
Location: Dammam, KSA
Client: Saudi Electricity Company/NG
Construction of 115/13.8KV Aziziyah-3 GIS Substation
Period: Mar’16 – Oct’18
Location: Al-Khobar, KSA
Client: Saudi Electricity Company/NG
Site Manager
May’10 – Feb’16: PCR Transmission Pvt. Ltd. (Formerly P. Chandra Reddy & Co.)
Projects Executed:
220/132KV Substation (New) and 29km of 220KV connected Over Head Transmission Line
Period: Oct’14-Feb’16
Location: Bobbili, Andhra Pradesh (India)
Client: AP Transco Ltd.
Designation: Site Manager
220KV 2 no’s Bay Extension in 400/220kv Substation
Period: Feb’14-Sep’14
Location: Nellore, Andhra Pradesh (India)
Client: AP Transco Ltd.
Designation: Site Manager
400KV 2 no’s Bay Extension in 400/220KV Substation
Period: Feb’13-Jan’14
Location: Chittoor, Andhra Pradesh
Client: AP Transco Ltd.
Designation: Site Manager
132kv/33kv Substation (New) and 30km of 132kv Over Head Transmission Line Erection
Period: May’10-Jan’13
Location: Guntur, Andhra Pradesh (India)
Client: AP Transco Ltd.
Designation: Site Engineer
Highlights:
Monitored Electrical Substation, Transmission Lines and Distribution projects; while also prepared project work & time schedule, field quality plan, check lists as per target schedule to ensure client satisfaction
Executed duties related to Survey, Foundation, Erection and Stringing
Performed inspection of material availability at site for smooth running of Project
Conducted the detailed checks of the drawings, recording the changes as per site condition for the preparation of built drawings
Implemented EHS guideline to ensure zero accidents at site for self and subordinates
Managed to perform the activities related to measurement and bill certification (Client billing and subcontractor billing)
Supervised transmission towers (up to 220KV) foundations, erection and stringing
Resolved ROW issues along with the client during the construction of Over Head Transmission lines
PREVIOUS EXPERIENCE
Shift Engineer
Aug’07- Apr’10: SLS Power Pvt. Ltd.
Project Executed:
6 MW Bio-mass Power Plant
Location: Nellore, Andhra Pradesh (India)
Scope:
Performed the operations and maintenance of 30T FBC steam boiler, connected auxiliaries and also of 6MW steam turbine control valves
Executed the maintenance of 1.6MVA, 7.5MVA transformers, 33/11kv switchyard and 7.5MVA Turbo Generator
Boiler Light-up and shut down activities and also responsible for power generation during shifts
PERSONAL DETAILS
Address
Nellore (AP), India
Date of Birth
23rd May 1986
Languages Known
English, Telugu and Hindi
Passport No.
L4115462 (Valid up to 2023)
Driving License
Saudi; Valid up to 2021
Nationality
Indian
Marital status
Married