ARUN KUMAR, PMP®
Operation & QHSE Leader
BE (Mechanical), Delhi College of Engineering
E: adg2u0@r.postjobfree.com
Kuala Lumpur, Malaysia
A highly motivated, ambitious, results driven professional with excellent plant operation skills and a strong track record of delivering in both the domestic and international arena. Having proven experience and strength in people leadership & strategic direction. Blending these strategic strengths with commercial knowledge to deliver against customer needs. Having 13+ yrs exp in plant engineering operations, quality, HSE system management and project management in manufacturing & service environment.
KEY COMPETENCIES AND SKILLS
Lean Six Sigma GB, Minitab
ISO9001,ISO45001,API Q1/2
FMEA, Bow tie RA
Continuous improvement
Project management (PMP)
Internal Audit
Capex Management
Lean Manufacturing
Plant maintenance, process safety
MTTR, MTBF
OEE, Reliability, utilities
Cost Management
TQM, Kaizan, 5S
Root Cause Analysis
Hazard Studies, HIRA
Strategy development
Engineering operations
Change Management
Organizational Skills
Energy management
Visual factory (Smartsheet, tableau)
7 QC tools
Problem solving techniques
Statistical Process Control
PROFESSIONAL EXPERIENCE
Baker Hughes Inc. (Formerly GE Oil & Gas)
Operations & QHSE Leader – South East Asia Region
Mar, 2014 - Present
Baker Hughes is an energy technology company. With operations in over 120 countries, it design, manufacture & service transformative technologies in energy sector.
Reporting to APAC Operations Leader, I am responsible for managing the SEA region manufacturing & service engineering operations along with QHSE function.
Successful recertification of Manufacturing plants for ISO9001:2015 in Malaysia
As part of Regional Crisis Management Team (CMT), prepared business continuity plan during COVID 19 outbreak
Lead the Quality & HSE of regional projects, Upgrades and Services projects portfolio
Manage operation and maintenance of plant utilities i.e DG set, Cooling tower, Air Compressor
Participate in regional strategy development and ensure KPIs are met.
Key contribution in organization Sustainability targets (CO2 reduction).
Ensuring effective use of energy and significant contribution in Carbon footprint reduction.
Manage operations of 2x Manufacturing units in Malaysia
Planning of plant engineering & maintenance budget
Drive reduction of Cost of Poor Quality
Maintaining the regional KPIs related to operations, QMS, LTI, HiPo, PHD etc
Ensured Compliance to GE Quality policy & technical standard requirements
Organized Quality & lean workshops for operations team
Played a key role in winning a Big contract for the region
Collaborate with internal teams to achieve org goals
Management of regulatory compliances as per Factory & machinery Act & pollution control bodies.
Capex planning & execution for the manufacturing units and Opex management
Preventive and breakdown maintenance of ETP, STP and plant infrastructure.
Management of plant contract manpower
Maintaining Integrated Management system (HSE & Quality)
Promoting Lean concepts, Kaizen, Poka-yoke, 5S and other quality processes to improve productivity, yields, cost, process variation and customer quality
Performing Value stream mapping to resolve business problems
Monitor the process capability of manufacturing processes
Lead the Regional safety committee
Implement and maintain the efficacy of BBS process
Drive interdependent safety culture & implement the learning from incidents
Conduct PHA, JSAs for high risk operations
Perform Risk assessment of all plant processes from process safety perspective
Life saving rules implementation and ensuring strict compliance
Investigate HiPo and serious incidents and propose effective CAPA
Interface and negotiate with regulatory bodies, clients and subcontractors
Conduct Management Review
Mentor and train the team
Projects & Achievements
Business problem of reduced cash flow resolved using Lean six sigma techniques resulted in $300K annual cash flow increase
Implemented escaping defect reduction process and achieved 16% reduction in post shipment defects
Implemented a regional digital platform gathering region QHSE data & simplified process
Achieved re-certification of the Region with API Q2 and ISO9001:2015 quality standards with Zero findings
Established in-house testing process resulted into 10% manufacturing cost reduction
Completed VSM Project – Resulted in reduction of 25% non-value added time
Implemented an efficient and lean inspection process which saved 15% cost.
Implemented MENAT inventory management process and save $500k on obs. inventory.
Qualified internal product into the customer operations resulted in $8Mn annual saving.
Installation, commissioning & start-up of approx. $10mn projects for Petronas FLNG1
Installation, commissioning & start-up of approx. $25mn INPEX (Aus) in S.Korea.
Akzonobel India Limited
Manager – Engineering & HSES
Jul, 2012 – Feb, 2014
Present in over 150 countries, AkzoNobel is a world’s leading paint & coatings manufacturing company since with renowned brands include Dulux, International, Sikkens and Interpon.
Head Engineering & HSES functions with reporting to Works Manager. Key responsibilities including plant maintenance, Utility operations & maintenance, CAPEX control, HSE&S management
Top class performance - Gallup Leadership Engagement Survey Result – 4.13/5
Valuable contribution in OPEX & CAPEX management, waste reductions, cost control, P&L oversight and business plan development
Managed on site activities inclusive of contract administration, supply chain activities, and project coordination with internal customer, consultant & contractor
Being the high hazard manufacturing site, maintain the high safety standards. And received appreciation from Corporate HSE audit staff.
Maintained the Asset Integrity Guidelines (AIG) and ensured compliance
Maintenance of plant equipment such as ETP, STP, Air compressor, Electrical equipment & other utilities
Managed and audited Quality Management standards (ISO 9001, ISO14001).
Management of the Engg standards & equipment for site operations.
Steered the factory projects worth of CAPEX INR 20 cr. in capacity enhancement, EHS, facility.
Conducted corporate HSE audits across different manufacturing sites in India
Liaised with local authorities like Pollution Control Board; Weights & Measure department; Explosive department, Electrical department and Factory inspectorate to enable all requirements for the operations comply with legal requirements
Conducted HAZOP and PHA for various critical processes
Managed a team of 4 engineers and 16 maintenance crew
Managing the Hazardous waste disposal in compliance with local regulations
Conducted plant hygiene monitoring & took corrective actions on the findings
Developed policies, programs, and implemented procedures to strengthen HSES compliance and culture at site.
Incidents and complaints are reported and investigated as per the Group requirements.
Ensuring high team morale
Team competency management
Ensured HSE&S reporting is done in line with Corporate Audit Programs
Drove the STOP & CORRECT PROCESSES to ensure employee safety
Projects
Cycle time reduction project – 50% improvement in batch cycle time
On time completion of plant capacity expansion project
Sustainability Project – Installation of above ground fire hydrant line resulted in 50% reduction in ground water usage
Automated manufacturing process project completed on time
DMAIC - Power saving project resulted in saving in 30% electricity cost
Plant roof replacement project completed & achieved 15% electricity cost reduction and safety improvement.
General Electric
Field Project Engineer
Feb, 2008 – Jun, 2012
For more than 125 years, GE has delivered technically advanced equipment across aviation, power, healthcare and renewable sectors with a presence in more than 180 countries.
Reported to Sr. Resource Manager, I was part of Global Rotating Equipment team which was responsible for projects execution and maintenance outages.
Got performance and quality award from GE.
Planning of major Shutdown, Planning of spares, manpower and critical spares
Executed various projects involving GE Gas turbines, centrifugal compressors, reciprocating compressors, pumps
Reliability study of equipment and preparation of Maintenance plan
Tracking and monitoring MTTR, MTBF
Quality control and QA activities of overhauling projects at customer sites
Failure analysis by using various RCA techniques
Maintained 95% compliance of preventive & predictive maintenance
Indraprastha Gas Limited
Operation & Maintenance Engineer
Sep, 2007 – Jan, 2008
Incorporated in 1998, IGL is the sole city gas distribution company in Delhi catering to the needs of transport sector using Compressed Natural Gas (CNG), the domestic and commercial sectors using Piped Natural Gas (PNG) and R-LNG is being supplied to industrial establishments.
Reported to GM-operations, I was responsible for cluster operations management involving equipment availability/reliability and customer issues resolution.
Maintenance of reciprocating compressors & Diesel engines.
Doing the modification in the machine to improve the performance.
Make available the spares at all times by using SAP.
Ensure the reliability of Equipment will meet annual delivery plan commitments
Work with the Maintenance Execution Team in the development of schedule and played a keyrole in management of cluster costs
Projects
Improvement of gas engine exhaust system modification. 20% increase in equipment availability.
SAP implementation project. Improved and efficient material and maintenance management process
Professional qualification: PMP certified (ID:-2645117), Certified Lean Six Sigma Green Belt, RCA leader, ISO9001:2015 lead auditor
Education: B.E Mechanical Engineering, Delhi College of Engineering, 2007 (ranked in top engg colleges in India)
Hobbies: Reading, travelling, practice yoga
Languages: English, Hindi.
Trainings
CAP leadership skills training (GE Internal)
Project management Legal aspects training
Delivering Customer Impact (GE internal)
Human performance leadership training
HPL leadership training (GE internal)
Investigating HiPo & Serious incidents training
Influencing and Facilitation skills at GE
Customer centricity
Business Communication Skill Training (GE internal)
Problem solving techniques
Project management professional