Post Job Free

Resume

Sign in

Engineering Power Plant

Location:
Mecca, Makkah, Saudi Arabia
Posted:
October 18, 2020

Contact this candidate

Resume:

C U R R I C U L A M V I T A E

SHESHU KUMAR. PITANI

Experience: 27 Years

Summary of Experience

Around 27 years in multi-disciplined Mainstream industry particularly in the Oil and Gas Refining, Petrochemicals, Process, Power plants, Construction, Commissioning, Start-up Handover, Operation & Maintenance and experienced in project management of large-scale multi discipline projects, having very good background of Site Organization, Schedule Management, Resource Management skills and ability to handle critical situations. Having knowledge in Management of EPC projects, project planning and cost control, application of product targets, application of total Quality management systems, Quality Assurance & Quality Control resolving technical and commercial matters, fabrication, installation of piping and equipment erection & commissioning, construction safety including risk assessment and job safety analyses.

Responsible to manage all engineering, procurement and construction activities of an allocated project to ensure completion in accordance with design criteria, within time, within budget and within safety targets for the achievement of profit objectives in a cost effective manner.

Sheshu Kumar Pitani,

Mobile: +966-**-**-**-***

+966-**-**-**-***

Email: adg2pv@r.postjobfree.com

adg2pv@r.postjobfree.com

Experience in Detail

Petrorabigh, Rabigh, SAUDI ARABIA

June 2016 to Dec 2019 (3.5 Years)

As a Plant Coordinator for the LDPE/EVA (CP3/4) Plant, Polymer-II Department.

<Areas of responsibility>

Maintenance planning

Prepare maintenance plans for all equipment in the section, identifying specific requirements, anticipated work force, work hours and material.

Plant shut down planning

Plan the annual plant shutdown maintenance in collaboration with maintenance department, submit plan to section head for approval and communicate plan to shift supervisors.

Job Safety Analysis & Risk Assessment

Prepare, Review, and approve JSAs as per the activities and SD requirement educate concern people for the awareness of Hazards and Risks involved the job.

Coordinate with Safety, and other required Departments and Contractors. To achieve safe and timely plant operation.

Coordination

Coordinate between Operation Dept and Maintenance Dept to prioritize maintenance activities in the section and coordinates the implementation of scheduled maintenance programs.

Quality Management

Ensure that maintenance jobs meet requirements and complies with inspection and safety codes, safety regulations, and maintenance standards.

Emergency Work

Take immediate maintenance action in the event of emergencies such as fire or equipment failure.

Process Engineering

Assist in the development of improved work methods, job simplification and standardization to eliminate unnecessary work and develop an optimum interval for performing maintenance work.

Petro Rabigh,

July 2009 to 19 June 2016 Date. (7-Years)

As a Project Engineer

Project Management Department.

Key roles & responsibilities

Manage the major and minor projects under Capital Expense within the complex from the initiation until the successful completion of each project. Also managed the complex wide shut downs to plan and execute the projects for timely completion and to achieve successful shutdowns.

Responsibilities includes the overall projects planning & scheduling, hazard analysis (JSA), review of MOCs, design, procurement and construction in compliance of minimum safety requirements and balancing the budgets allocated for each project.

Coordinate with the Engineering Chiefs/General Engineering Service contractors in review of all design stages, obtain MTOs and prioritize the long lead items. Also, coordinate with long-form contractors from award of contract until commissioning.

Manage all the stages of construction until commissioning including monitoring and witnessing the hydro test of pipelines, static & stationary equipment. Interface with the proponent departments for better output of the project and coordinate with the Safety and Quality departments to maintain and meet all project requirements as per the approved scopes of projects to a safe and successful project completion and handover the same to the proponent including financial closing of each given project in a timely manner.

Main role-played in the areas of Refinery, SFU, Polymer Plants, Monomer Plant (MEG, POX, HOFCC and Ethane Cracker), Utilities (Steam Generation, Electrical Sub Stations, Sea Water Intake area, and Fire Water Network).

Coordinate within the Engineering department, and other departments of the complex (Refinery and Petro Chemical Complex)

Coordinate the Engineering Work Requests (budgeted and capital projects) in the design, estimates and IFCs as well as the as-built drawings after the construction. Confirmation of construction and its stages of the delivered projects as per the design and scope of the Engineering Dept.

Review of TSR, MOC and Technical Queries of each proposed CAPEX by the manufacturing Dept.

Coordinate with the General Engineering Services Contractors for the Engineering Work Orders in order to manage all the stages of projects up to the complete documentation and close out.

Petro Rabigh,

Feb. 2007 to July 2009 (2 Years 4 Months)

CONSTRUCTION SPECIALIST,

Tech. Advisor & Commissioning CSTF

Key roles

Worked for the SUMITOMO CORPORATION JAPAN and SAUDI ARAMCO KSA, US$ 17Bn. Joint Venture Directorate, in the Hybrid team of Technical Advisory as a front liner to monitor the complex wide Commissioning and Startup activities. As a member of the Commissioning & Start up Task Force (CSTF) team, responsible to oversee the Sub Taskforce Teams (STT), involves in construction, Pre-commissioning, Commissioning and Start up activities with all of PMT/EPC’s packages of Refinery & Process plants like HOFCC, Polymer, Monomer and Utilities including Tanckage Etc.

Also responsible as a frontline Handover Lead to involve in the Mechanical Completions, Punch Item Closeouts, participate in the PSSR (Pre-Startup Safety Review) oversee smooth handover and close out of each Plant/System with Manufacturing (Operations) Departments.

Responsibilities

To ensure the plant readiness for start-up, define the plant by system, prioritize the system commissioning within the group, define & finalize commissioning procedures and schedules, expedite all deliverables from the major EPCs (JGC, Foster Wheeler, Technimont, Hitachi, TR, Sinopec etc.) required for commissioning & start-up, Monitor and witness the commissioning activities of each plant and system piping, equipment, like steam flushing, air blowing, De Greasing / Chemical Cleaning, Lube Oil and Seal Oil flushing for Pumps, compressors, and chemical cleaning for piping.

Participate in the mechanical completion certification, coordination of interfaces and shared systems with other parties in the network, punch list items management and handover/close-out system management as per the specified system wise for complex wide plants.

The objective is to safe, smooth and timely commissioning & start up and handover/close-out of complex wide plants/systems.

Reporting to the JV Directorate Technical Manager and Program Director

M.R. AL-KHATHLAN Est.,

SAUDI ARABIA - May 2005 to Feb.2007

PROJECT MANAGER

Worked in the Saudi Aramco Rabigh Refinery for the Offsite Utilities Project. A major RTR & Utility pipeline project and Demolition of old Boiler and install, commission, start-up of Foster Wheeler Packaged Type Boiler.

Some Key Roles:

Identifying client’s contractual requirements with an understanding of client’s specifications and standards. Preparation of comprehensive construction Plan and implementation of QA/QC procedures. Further to highlight the deficiencies if any for rectifications.

Establish, schedule and conducting the internal audit program to cover all work phases in conformance to the desired requirements. Periodical review of internal audit reports to recommend the required corrective actions.

Maintaining healthy interfaces with the equipment/material suppliers and vendors in order to ensure required quality standards of clients and the manufacturer.

Coordinating with quality team to achieve and maintaining well-controlled quality documentation and data control system. Maintaining a separate quality procedure for the control of non-conforming products in order to ensure that the product and/or services that does not confirm to the identified product requirement and controlled to prevent its unintended use or delivery.

M.R. AL-KHATHLAN Est.,

SAUDI ARABIA - March 2003 – May 2005 (2 Yr. 2 Mo)

As à PROJECT ENGINEER

JOB DESCIRPTION

Worked for the Saudi Aramco Rabigh Refinery in the GRTA Shut Down activities of plant. Fabrication of Tie-Ins, replacement of spools, fabrication and installation of “Split Tee” incl. it’s testing, coordination with the inspection group for NDT hydrotest activities as well as hot and cold works, Hot Tapping of Process lines per the Saudi Aramco Engineering Standards.

Involved in the Level 2 inspection (Vendor Inspection) with the manufacturer Amiantit for RTR Pipes and fittings to satisfy the requirement of Saudi Aramco standards. Review of NMRs, design drawings, technical evaluation and obtain certification from Client and to ensure the materials to meet all design and technical aspects. Estimation of material requirement (MTO), planning of procurement and delivery schedules coordination with quality personnel in conducting inspections upon material arrival and stage vise inspection. Preparation of plan and schedule for all construction activities commences with the milestones to meet the Partial and Final MCC within the target time.

Able to independently plan and execute the pre-fabrication process pipe works of new and existing plants including hydro testing, erection of various types of equipment i.e. ASME vessels, columns, exchangers and rotating equipment. Obtaining ASME “U” and “S” stampings certification & coordination with the ASME Inspectors. Knowledge of rigging study and safety standards applicable to carry out the erection jobs. Experienced in preparation of detailed fabrication drawings, as-built drawings, MTO’s, and fabrication & erection schedule. Conversant with welding details, NDT requirements and the QC procedures. Safety training and complete awareness of safety requirement of all the fields of oil and gas is comprehensive.

Assigned as In charge for the monitoring of various HVAC projects in order to monitor the contractors and subcontractors including the vendors from the awarding the project till the testing & commissioning, and handover to the clients as follows.

Private Projects of MRK Est Head Office, Dammam,

MRK Qatif Guest House,

MRK Half Moon Project, Khobar,

SCECO Project, Mohammadia, Jeddah,

KAA Airport HAJJ Terminal Substation, Jeddah

Experience summary in India

NCS GAYATRI SUGARS AND CHEMICALS LIMITED, HYDERABAD, INDIA. - October 1997 - March 2003

SITE MANAGER (5y 5m)

Worked for the construction site of The KCP Limited supplied Self-setting mills, Centrifugal machines, and Co- generation power plant of 6MW turbine with alternator including 80 tons water tube boiler, piping & equipment erection and commissioning.

Some Key Roles:

Worked for the construction of the INR 100 Crores full plant installation. As a key role and responsible for all the engineering and engineering related disciplines i.e, detailed engineering, design drafting, procurement, technical specifications, schedule and cost control. Responsible for the appraisal of the flow of work, conformance with requirements of principle document and job specification, sampling techniques etc to maintain a continuous appraisal of contractor’s performance during execution of the project.

THE KCP LIMITED. MADRAS, INDIA July 1994 – October 1997

QUALITY CONTROL SUPERVISOR (3 Years)

Worked for various projects like power, chemical and sugar plants installation and commissioning and the responsibilities are:

Review of inspection test plan, material verification and all stages of inspections, review of radiography, final visual dimensional and welding inspections and review of final Dossiers prior to acceptance of the product

Conduct inspections for the mechanical activities for the Rotating and static equipment, fabrication & erection of piping, etc.

Coordination with NDT subcontractors for UT, PT & X-rays and the verification of isometric drawings.

Commissioning and start up of stationary equipment (ASME Vessels, API tanks etc) and rotary equipment, potable Water plants booster pumps, structural steel works mechanical and piping inspections, piping hydro test coordination. Shop inspection of pressure vessels, columns, Exchangers, tanks, pipes, valves, etc.

Various Projects Involved

Prudential Mouli Sugars and Industries, Andhra Pradesh, India,

Sivasakthi AMSSK Ltd, Khamgaon, Maharashtra, India

NCS Gayatri Sugars and Chemicals Limited, Hyderabad Andhra Pradesh

Ganpathy Sugar and Industries Limited. Andhra Pradesh, India

TASHPA CONSTRUCTIONS PVT. LIMITED, MADRAS, INDIA

May 1993 – June 1994 (1 Year) as a MECHANICAL SUPERVISOR

Worked as Mechanical Supervisor for the Machine Division. Manufacturers of Circular Saw type Granite cutting machines with the collaboration of Spiegel Co, Germany.

Responsibilities are manufacturing the all parts like vertical & horizontal columns, bearing housings installation, Assembling and test run of machines, fabrication of bridge and trailer with rails, installation of complete set in the customer’s plants and commissioning of machine unit.

QUALIFICATIONS : DIPLOMA IN MECHANICAL ENGINEERING

: DBM (Construction Management) (Pursuing)

: TRAINED PMP FROM PMI AGC, BAHREIN.

: HVAC DESIGN ENGG. : AUTO CAD

: NDT Level II (RT, PT, MPT, UT)

: MS PROJECT & PRIMA VERA – P3.

: QMS LEAD AUDITOR (ISO 9001-2008)

Additional Knowledge

HVAC Design. Involved in many major HVAC projects from design to commissioning for the Carrier Aircon Limited, Blue Star. India and Sceco Electricity, King Fahad Intl. Airports, Saudi Aramco, Saudi Arabia

ISO 9001 2008 QMS Lead Auditor

Familiarity with Engineering & Material standards and procedures of Saudi Aramco, ISO 9001, ASHRAE, SMACNA & DW-142 NFPA and general knowledge of various international standards.

Skilled in Planning and Schedule using Primavera (P3) Software

Knowledge and experience in Microsoft Project scheduling and MS office software

Personal Details

Age : 45 Years

Father’s Name : RAMA RAO PITANI

Nationality : INDIAN

Status : MARRIED

E-mail : adg2pv@r.postjobfree.com Alternate E-mail : adg2pv@r.postjobfree.com;

Permanent Address : SHESHU KUMAR. P, S/o Rama Rao,

FLAT# 305, SAIDHAMAM GARDENS.

TARANAGAR, LINGAMPALLY – 500 019

HYDERABAD, INDIA

Telephone (IND) : 0091-40-23035439

Present Mobile (KSA) : 009**-*********, 509933127

Languages Known : English, Hindi, Telugu, Tamil, Malayalam, and

Arabic

DRIVING LICENSE : Valid Saudi Arabian License

Valid Indian License

PASSPORT DETAILS

1. Passport Number: S 9855368

2. Date of Issue : 11-02-2019

3. Date of Expiry : 10-02-2029

4. Place of issue : Jeddah, Saudi Arabia

(SHESHU KUMAR. PITANI)



Contact this candidate