Post Job Free

Resume

Sign in

Engineer Civil

Location:
Marawi City, Lanao del Sur, Philippines
Salary:
100000.00pesos
Posted:
October 18, 2020

Contact this candidate

Resume:

TECH-* : CURRICULUM VITAE (CV)

Position Title and No.

Resident Engineer

Name of Firm

Filipinas Dravo Corporation

Name of Expert

Mahid B. Sabdullah

Date of Birth

September 03, 1954

Citizenship

Filipino

Education:

• Bachelor in Civil Engineering, Manuel L. Quezon University, 1979

Employment record relevant to the assignment:

Period

Employing organization and your title/position, Contact info for references

Country

Summary of activities performed relevant to the Assignment

Nov. 2014 - 2017

Hyder Consulting Middle East Limited

Resident Engineer

Qatar

• Administering the operational functions of the day-to-day activities on the project..Review and approved monthly payment certificate.

June 2005 - Oct. 2014

Arabian Engineering Bureau Consulting Engineers

Resident Engineer/Civil Engineer

KSA

• Management and supervision of the day-to-day activities on the project. Maintain logs of project progress, handing-over and final account.

July 1999 - June 2005

National Power Corporation

Engineer A, Sr. Engineer

Philippines

• Design and site survey of the proposed roads and infrastructures project

April 1998 - June 1999

Lucent Technologist International Inc.

Quality Control Inspector

KSA

• Responsible for all quality control and safety activities on the site of works;.

July 1996 - Apr 1998

National Power Corporation

Engineer A

Philippines

• Design and site survey of the proposed roads and infrastructures project

Jan 1995 - May 1996

Department of Public Works and Highways

Engineer III

Philippines

• Monitoring the contractor activities and provide activities reports to the Regional Project Management office of DPWH Region X

July 1994 - Dec 1994

Shakba Builders

Project Manager

Philippines

• Supervision of the ongoing project undertaken from DPWH and others government agency.

Nov 1991 - Jan 1994

Arabian Consulting Engineering Center

Materials Inspector

KSA

• Supervise the contractor day-to-day sampling and testing activities in the field and in the laboratory.; check mix design of asphalt and concrete for approval by the client. Prepare Monthly test report to MOC.

Aug 1982 - Mar 1991

SWECO-AB JV with Abalkhail Consulting Engineers

Materials Inspector

KSA

• Supervise the contractor day-to-day sampling and testing activities in the field and in the laboratory.; check mix design of asphalt and concrete for approval by the client. Prepare Monthly test report to MOC.

Oct 1979 - June 1982

ARIEB Enterprises

Civil Engineer

KSA

• Check and review of the project drawing for execution in the site of works in coordination with the supervising consultant engineer.

Membership in Professional Associations and Publications:

• Professional Regulation Commission, PRC No. 0026148

• Saudi Councils of Engineers / Consultant Engineer

Language Skills (indicate only languages in which you can work):

LANGUAGES

Speaking

Reading

Writing

Good

Fair

Poor

Good

Fair

Poor

Good

Fair

Poor

Filipino

O

O

O

English

O

O

O

Trainings/Seminars:

(1) Seminar on PERT/CPM, conducted by Central Colleges of the Philippines., Quezon City, May 30, 1981

(2) Course on Project Feasibility, conducted by The Economic Development Foundation, Makati City, July 11, 1979

(3) Soil Engineering and Materials Quality Control, conducted by Ministry of Public Highways, Manila, May 2 – June 21, 1979

(4) Think Safety Driving System, conducted by Lucent Technologies Int’l., Inc. – KSA for the TEP6/GSM Program, April 25. 1998

(5) Program Writing and Communication, Conducted by Meirc Training and consultant, Riyadh, KSA, September 16-17, 1998

(6) Auto Cad R14, Conducted by WEBGATE Computer Center, Iligan City, February 23 to April 6, 2002.

(7) Confined Space Awareness, Conducted by ENERTEC QATAR, Doha, Qatar, September 22, 2016

(8) Construction Occupational Safety and Health (COSH), Conducted by MSRS, Iligan City, June 22 – 25, 2018

Adequacy for the Assignment:

Detailed Tasks Assigned on Consultant’s Team of Experts:

Reference to Prior Work/Assignments that Best Illustrates Capability to Handle the Assigned Tasks

Executing (a)~(f) tasks of Site Engineer on RFP

• List of Deliverables/ tasks as in TECH-5 in which the Expert will be involved;

D-33, D-34, D-35, D-36

Name of Project (1): Roads and Infrastructure in Al Kheesa North and East

Year: November 2014 - 2017

Location: Doha, Qatar

Client: Ministry Of Public Works (ASHGHAL)

Main project features: The project provide infrastructure, road, drainage and utilities for approximately 600 residential plot with an internal and perimeter highway network of roads in varying corridor width. Storm water Drainage – 17 km. open cut VC pipe; Micro tunneling - 6km RCJP-GRP lining; Shaft – 40; Manholes – 344; Gullies – 1,244; Attenuation stank – 6; Balancing Tank – 1; Foul Sewer – 14 km. open cut VC pipe; Micro tunneling – 1 km.; Manholes – 384; TSE – 9 km. HDP line; 154 – chamber; Street lighting – 36 km. cabling; 793 – Light poles; 36 km. – Qtel cable duct; Electricity- diversion of underground LV & MV cables – 1.8 km. Roads – 327,063 Sq. m. (20.00 KM) along with associated kerbing, tiling, road marking & traffic signal. (313,000,000.00 QR)

Position held: Resident Engineer

Activities Performed: Support the Senior Resident Engineer in providing a complete construction supervision service to major Roads Drainage utilities projects to the extent subject matter expertise allow; Supporting safety and quality oversight, Technical compliance monitoring, schedule and cost management and all contract administration across the project.; Managing the planning and resource allocation for the Roads and Drainage utilities with the associated works project.

Name of Project (2) / Main project features: Dualization of Zilfi Road from Exit 18, Zilfi, Riyadh Areas, Saudi Arabia: / Construction of the Second Two (2) Lane Dual Carriageway road with a length of 49 km. (Structures and Drainage are 2 no's. Bridges (3 & 4 span @ 24.80m-75mm), 40 multiple Cell RCBC, and 7 no's. RCPC with Median drain); Pavement is 30 cm, thk. S.G.; 20 cm thk. ABC; 8 cm thk. BBC; 5 cm thk. BWC. Asphalt pavement using Super Paved Design Mix. / MOT project. (Cost 48 million sr.): Dualization of Huraymila-Ragbah-Saqra Road, Ragbah, Riyadh Areas, Saudi Arabia; / Construction of the Second Two (2) Lane Dual Carriageway road with a length of 68 km. (Structures and Drainage: 119 no's. - multiple Cell RCBC, 8 No's - Median Drain) one Round About-80m dia.; Pavement is 30 cm, thk. S.G.; 20 cm thk. ABC; 8 cm thk. BBC ; 5 cm BWC./MOT project (Cost 68.0 million sr.).; Al Hareq- Al Rayn Road, Al Rayn, Riyadh Areas, Saudi Arabia: / Construction of the First Two (2) Lane proposed Dual Carriageway road with a length of 92 km. (Structures and Drainage 68 no's. - multiple Cell RCBC); Pavement is 30 cm, thk. S.G.; 20 cm thk. ABC; 8 cm thk. BBC ; 5 cm thk.BWC..MOT project.(Cost 90.0 mill. sr.).

Completion of some road in Riyadh Areas under Group 5 MOT Project, Riyadh, Saudi Arabia: (Project Cost 136.09 million sr.)

Dualling of Nissah Roads:/ construction of 18 km main road Dual with 3 lanes with service road and loop. 1 no’s. Presstress Interchange Bridge, L=24.627 x 4 span dual- C=20mm; 44 no’s. of Multiple cell RCBC) (Asphalt pavement using super paved). Pavement 30cm SG.; 30cm ABC; 20cm BBC, 5cm BWC thk 20cm BBC . Road Linking Hareq with Nissah Al Jufayr Road: / Construction of a15.6 KM length road ; Pavement using super paved mix design. 25 No's multiple cells box culverts. BWC=5.0cm, BBC=12cm and ABC=20cm thk. Dualling of Hareq-Al Rayn Road: / Construction of Intersection of Riyadh-Bisha Road to Af’age Municipality road. Length= 3.6 km. with 1 Roundabout. Link road: (7 No’s) Al Bakhra, Al Asheq center, Al Salemiyah, Shalah main and sub links, Makhatiya, Al Rakahmiya al wasta main and 2 sub links; and Al Majed. Total Length of Link Road is 40 km. Pavement: BWC= 5cm and 30cm SG.

Year: June 2006 - October 2014

Location: Riyadh, KSA

Client: Ministry of Transportation

Position held: Resident Engineer

Activities Performed: Monitored the contractor’s performance to ensure that they carry out their responsibilities under the contract. Measurements of the completed and uncompleted activities of the contractors for evaluation’ and Checked the contractor’s submitted accomplishment quantities for billing.; Coordinated with the local citizens regarding their request for studies.; Coordinated with other utility agencies regarding the utility that obstructs the project if any; Checking and approval of as-built drawings of the project. Act as Bridge Engineer due to none approved Bridge Engineer By Ministry of Transportation, KSA

Name of Project (3) : Ranya - Wadi Dawaser Road, Wadi Dawaser, Riyadh Areas,; Main project features: Construction of the First Two (2) Lane proposed Dual Carriageway road with a length of 215 km. (Structures and Drainage; 1 no.- Bridge ; 5 no's. - multiple Cell RCBC ); Pavement is 30 cm, thk. S.G.; 15 cm thk. ABC; 8 cm thk. BBC; 5 cm thk. BWC. / MOT project. .(Cost 39.8 million sr.) Bier al Suqya Shamal Road Project, Wadi Dawaser, Riyadh Areas, Saudi Arabia: Main project features: Construction of Two (2) Lane Agricultural road with a length of 43 km. Pavement is 20 cm, thk. S.G.; 5 cm BWC. /MOT project .(Cost 20.0million sr.).Al Nafiah-Al Firaisha-Al Mudania Road at Aflaj, Laila Aflaj, Riyadh Areas, Saudi Arabia. Main project features: Construction of Two (2) Lane Agricultural road with a length of 19 km. Checked the contractor’s submitted Monthly Billing for payment and forwarded to Resident (Drainage Structures; 5 no's. – RCPC) Pavement is 20 cm, thk. S.G.; 5-cm. thk. BWC. /MOT project (Cost 12 million sr.

Year: June 2005 - June 2006

Location: Riyadh, KSA

Client: Ministry of Transportation

Position held: Civil Engineer

Activities Performed: : Checked and reviewed the project design for implementations.

Supervised and monitored the contractor’s daily request activities for Earthworks, asphalt works and concrete works and given to site Inspectors, surveyor and Materials Inspectors for inspection and approvals; Checked structural shop drawing of Bridges and culvers submitted by the contractor for executions and approval by the Resident Engineer.; Submitted Daily reports to the resident Engineer in reference to the daily activities of the contractors for information’s and documentations; Checked As-Built Drawings and forwarded to Resident Engineer for approval.

Engineer for approvals and comments

Name of Project (4): Community Project of National Power Corporation and Department of Energy to Host Communities in Mindanao, Philippines:

Year: July 26, 1999 – May 2005

Location: Iligan City

Client: National Power Corporation, Mindanao Generation

Main project features: : Construction of Water supply (Steel and Concrete Water Reservoir and piping); Street Lighting; Agricultural Roads, Auditoriums and washroom. This project is funded by the Department of Energy to the Host Communities in Mindanao as part of their shares in the Power Generating along Agus River By National Power Corporation

Position held: Engineer A / Senior Engineer

Activities Performed: Conducted site surveys and design of the proposed community project by the National Power corporations and Department of Energy, Manila to host communities such as Road, Bridges, and Water Supply, Water Treatments, Mosques washroom, auditorium and street lightings. Preparation of cost estimates and recommended for budgeting for executions.

Name of Project (5) : Expansion Project TEP 6, KSA: Expansion Project TEP 6 (Telephone Expansion Project Of Saudi Arabia Kingdom wide) Site assignment in Riyadh, Najran, Majardah, Khaybar, yambo and Jeddah).

Year: April 1998 – June 30, 1999

Location: Riyadh, KSA

Client: Saudi Telephone

Main project features: Dual Carriageway with 1 press tress Interchange bridge with clover loop, 3 wadi bridge and 8 multiple RCBC, and 12 RCPC for median drain. This road is linking Riyadh - Dammam Expressway to Hofuf, Saudi Arabia

Position held: Quality Control Inspector

Activities Performed: Supervised the Sub-contractor’s daily activities concerning quality controls in the executions of Telephone expansion project in the kingdoms; Coordinated with the consultants and Saudi Telephone company representative in the site of works for executions. Supervised Sub-contractor’s works such as Trench excavations, laying telephone cables, placement of conduits in the trench, placement of Manholes. Supervised pouring of concrete of buried conduits, replacement of asphalts pavement, and backfilling of trenches.; Supervised various quality tests in the laboratory and site conducted by the private laboratories and provide reports to the Quality control Manager. Acted as a Quality Project Manager in Western Region in the absence of the Quality control Manager.

Name of Project (6): Community Project of National Power Corporation and Department of Energy to Host Communities in Mindanao, Philippines:

Year: July 1,1996 – April 5, 1998

Location: Iligan City

Client: National Power Corporation, Mindanao Generation

Main project features: : Construction of Water supply (Steel and Concrete Water Reservoir and piping); Street Lighting; Agricultural Roads, Auditoriums and washroom. This project is funded by the Department of Energy to the Host Communities in Mindanao as part of their shares in the Power Generating along Agus River By National Power Corporation

Position held: Engineer A

Activities Performed: Conducted site surveys and design of the proposed community project by the National Power corporations and Department of Energy, Manila to host communities such as Road, Bridges, and Water Supply, Water Treatments, Mosques washroom, auditorium and street lightings. Preparation of cost estimates and recommended for budgeting for executions.

Name of Project (7) : Package 7B-1 Molave-Ozamiz Road, Missamis Occidental, Philippines: Construction of Two Lane Road connecting Molave to Ozamiz City

Main project features: Package 7B-1 Molave-Ozamiz Road, Missamis Occidental, Philippines: Construction of Two Lane Road connecting Molave to Ozamiz City Length is 44.386 KM.(Drainage Structures: 4 no's. – multiple RCBC, 4 no' Bridges) Pavement is 30 cm, thk. S.G.; 15-cm. thk. Aggregate Base; 5 cm. thk Asphalt wearing course/ This project is funded by Asian Development Bank and Kuwait Fund for Arab Economic Development. (Cost 313.4 million Pesos.)

Package 7B-2 Ozamiz Road-Oroquita Road, Missamis Occidental, Philippines: Construction of Two Lane Road connecting Ozamiz City to Oroquita City; Main Project Features: Package 7B-2 Ozamiz Road-Oroquita Road, Missamis Occidental, Philippines: Construction of Two Lane Road connecting Ozamiz City to Oroquita city; Length is 44.436 Km.(Drainage; structures: 31 no's. – multiple RCBC, 5 no' of Bridges) Pavement is 30 cm, thk. S.G.; 15 cm. thk. Aggregate Base; 5 cm. thk Asphalt wearing course/ This project is funded by Asian Development Bank and Kuwait Fund for Arab Economic Development. .(Cost 318.7 million Pesos.)

Year: January 1, 1995 – June 30, 1996

Location: Missamis Occidental

Client: DPWH, PMO, Region X

Position held: Engineer III

Activities Performed: Act as representative of the Department of Public Works and Highways, Regional Office of Project management Office on the projects; Direct monitoring of the project activities and provided reports to the regional office.; Solved problems in the site to facilitate the implementations of the project.; Maintained as liaison officer to the Resident Engineer, Project Manager by the Regional Project Management office of Department of Public Works and Highways, Region X.

Name of Project (8) : Construction of Agricultural Road and School Building

Year: July 1, 1994 – December 1, 1994

Location: Lanao del Sur, Philippines

Client: DPWH, Region XII

Main project features: Construction of National Road and School Buildings in Lanao del Sur. This project is a National Government Funded Project under the implementation of Department of Public Works and Highways, Region 12

Position held: Project Manager

Activities Performed: Prepared tender document in attending various government projects under the Department of Public works and highways, Region 12 such as Roads and school buildings; Coordinated with the clients for the project executions as per contracts; Prepared Monthly report is and submitted to the client regarding project accomplishment; Prepared monthly accomplishment report for quantity calculation of the project for payments.

Name of Project (9): Al Ahsa Links From Riyadh-Dammam Expressway Section 1, KSA: Dual Carriageway & Abquiq-Riyadh Expressway Link Road, KSA: Dual Carriageway linking Riyadh-Dammam expressways to Abquiq, Saudi Arabia

Year: November 1991 - January 1994

Location: Riyadh, KSA

Client: Ministry of Communication Kingdom of Saudi Arabia

Main project features: Dual Carriageway with 1 press tress Interchange bridge with clover loop, 3 wadi bridge and 8 multiple RCBC, and 12 RCPC for median drain. This road is linking Riyadh - Dammam Expressway to Hofuf, Saudi Arabia

Position held: Materials Inspector

Activities Performed: Prepared and checked the asphalt pavement Job Mix and concrete mix design that are needed in the project in coordination with the concern contractors in accordance with the Ministry of Communications Specifications and circulars.; Prepared aggregate Base Course Mix design (Job Mix Formula) as required in the project as per MOC specifications and requirements.; Supervised contractor’s daily site Earth works (Sand dunes embankment fill including earth plating), Aggregate Base Course works, asphalt works and concrete works including the daily laboratory works of the contractors.; Prepared Monthly tests report to be submitted to MOC, Riyadh KSA for information’s and documentations; Supervised daily pouring of concrete and asphalt pavements of Bituminous Base and wearing course; Participated in the preparations of quantity calculation of the project particularly in the revisions and final bill of quantity (BOQ) of the project.

Name of Project (10) / Main projects features: Al Baha- Bilad Zahran Dual Carriageways Road, Al Baha, Saudi Arabia: Construction of the First Three (3) Lane Dual Carriageway / Road with a length of 60.4 km & 8 km. link Road. ( Bridges- 30m to 420m span Total length= 3,400m.; Tunnels- 30 to 280m; Total length = 2,680m; Retaining walls- 3,250 m length; 220 no's. - multiple Cell RCBC, and 80 no's. - RCPC); Pavement is 30 cm, thk. S.G.; 12 cm thk. BBC; 5 cm BWC. (Cost 415.2 million sr.) Taif Bani Salem-Bilad Thimala Feeder Roads No. 20, Taif, Saudi Arabia: Construction of Two (2) Lane Feeder Road linking Village Bani Salem to VillageThimala with a length of 78 km. (Structures and Drainage: 8 no's. Bridge (1,450 m ), 280 no's - multiple Cell RCBC, and 50no's. - RCPC. Retaining Walls 2,800lm, Irish crossing – 6 no's. Pavement is 30 cm, thk. S.G.; 12 cm thk. BBC; 5 cm thk. BWC / MOC project. Road Data's – 2x3.80=7.60m CW and 2x2=4.00m Shoulder paved 5 cm. BWC.(Cost 158.5 million sr.) :Wadi Al Jinsh Feeder Road no. 21, Al Baha, Saudi Arabia: Construction of Two (2) Lane Feeder Road Linking Road 36 (Bani Saad- Al Baha Road) to Road 54 (Taif-Abha Road) with a length of 57.4 km. (Structures and Drainage: 5 no's. Bridges(1,350 Lm), 255no's - multiple Cell RCBC, and 60 no's. - RCPC. Pavement is 30 cm, thk. S.G.; 12 cm thk. BBC; 5 cm thk. BWC. 2,780 m- Retaining wall, Erosion protection-19,000 cu.m.. (Cost 149.5 million sr.) ; Bani Amer Feeder Road No. 49, Al Nimas, Abha areas, Saudi Arabia: Construction of Two (2) Lane Feeder Road Linking Bani Amer Villages to Road 54(Taif - Abha Road) with a length of 68 km. (Drainage Structures 240 no's - multiple Cell RCBC, 1 no's Bridge, Retaining walls-1,500m, Iris crossing- 6 no's. Pavement is 30 cm, thk. S.G.; 12 cm thk. BBC; 5 cm thk. BWC / MOC project.(Cost 36.00 million sr.) ; Bani Shihr Feeder Road No. 50, Al Nimas, Abha Areas, Saudi Arabia: Construction of Two (2) Lane Feeder Road Linking Bani Shihr Villages to Road 54(Taif - Abha Road) with a length of 100 km. (Drainage Structures 180 no's - multiple Cell RCBC. 3 no's Bridges, Retaining wall-1,200LM; 7 no's Irish Crossing. Pavement is 30 cm, thk. S.G.; 12 cm thk. BBC; 5 cm thk. BWC / MOC project .(Cost 35.1 million sr.) ; Wadi Al Mawain Feeder Road No. 43, Al Mawain, Abha Area, Saudi Arabia: Construction of Two (2) Lane Feeder Road Linking Villages Mawain to Road 54 (Taif - Abha Road) with a length of 48 km. (Drainage Structures 96 no's - multiple Cell RCBC.. 11No's. Iris crossing. Pavement is 30 cm, thk. S.G.; 12 cm thk. BBC; 5 cm thk. BWC / MOC project.(Cost 11.9 million SR.).

Year: August 1982 - March 1991

Location: Kingdom of Saudi Arabia

Client: Ministry of Communication now Ministry of Transportation

Position held: Materials Inspector

Activities Performed: Prepared and checked the asphalt pavement Job Mix and concrete mix design that are needed in the project in coordination with the concern contractors in accordance with the Ministry of Communications Specifications and circulars; Supervised contractors daily site Earthworks, Asphalt Works and concrete works including the daily laboratory works of the contractors; Prepared Monthly tests report to be submitted to MOC, Riyadh KSA for information’s and documentations; Participated in the checking of shops drawing for implementations in the site such as Bridges, Tunnels, Box and pipe culverts, Face wall and retaining walls; Supervised daily pouring of concrete and asphalt pavements of Bituminous Base and wearing course.

Name of Project (11): Extension of Riyadh Hijaz Dual ways road until Dirab (Part 1)

Year: October 1979 - June 1982

Location: Riyadh, KSA

Client: Ministry of Communication Now Ministry of Transportation

Main project features: Construction of Three (4) Lane Dual Carriageway road and Two Lane Service Road with a length of 22 km. (Structures and Drainage; 1 5 no’s. - multiple Cell RCBC); Pavement is 30 cm, thk. S.G.; 15 cm thk. ABC; 12 cm thk. BBC; 5 cm. thk. BWC. / MOC project cost- 109.00 million SR.

Position held: Civil Engineer

Activities Performed: Checking of road design alignment for implementations in coordination with the Consultant concern.; Prepared hydrological structures design and drawings such as Box Culverts, Pipe and concrete ditches; Prepared road cross-section including quantities Calculation.; Prepared shop drawings for submission to consultant for approval.; Prepared project monthly accomplishments quantity for billing and payments.; Acted as quantity surveyor in the said project

Expert’s contact information: E-mail: adg2ml@r.postjobfree.com Phone: 097*-***-**** or 091********

Certification:

I, the undersigned, certify that to the best of my knowledge and belief that

(i) This CV correctly describes my qualifications and experience

(ii) I am not a current employee of the Executing or the Implementing Agency

(iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs specified for me in Form TECH 6 provided team mobilization takes place within the validity of this proposal.

(iv) I was not part of the team who wrote the terms of reference for this consulting services assignment

(v) I am not currently debarred by a multilateral development bank

(vi) I certify that I have been informed by the firm that it is including my CV in the Proposal for the "Consulting Services for the Construction Supervision of the Construction of Roads and Bridges under Improving Growth Corridors in Mindanao Road Sector Project (IGCMRSP)”. I confirm that I will be available to carry out the assignment for which my CV has been submitted in accordance with the implementation arrangements and schedule set out in the Proposal.

If CV is signed by the firm’s authorized representative:

(vii) I, as the authorized representative of the firm submitting this Proposal for the "Consulting Services for the Construction Supervision of the Construction of Roads and Bridges under Improving Growth Corridors in Mindanao Road Sector Project (IGCMRSP)”, certify that I have obtained the consent of the named expert to submit his/her CV, and that s/he will be available to carry out the assignment in accordance with the implementation arrangements and schedule set out in the Proposal, and confirm his/her compliance with paras (i) to (v) above.

I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.

Date:

10/05/2018

[Signature of expert or authorized representative of the firm]

Day/Month/Year

Full name of authorized representative:

Park, Jeong Bae

Managing Director of Kunhwa Engineering & Consulting Co., Ltd.



Contact this candidate