TECHNICAL SKILLS&EXPERTISE
I am having more than 27 years of experience in Erection & Maintenance in Modern Cement plant equipments.
I can ensure preventive, pro-active condition monitoring quality management plan to avoid repetitive failures, incidents, unscheduled down time to maximize plant availability.
I am having knowledge in the planning of preventive maintenance of all Equipments in Modern cement plants like Crusher, Stacker, Reclamer, VRM, kiln, SF Cross bar cooler, Grate cooler, Ball mills, Roller press, Bucket Elevators and packing plant, wagon loading machines.
Monthly budget planning for mechanical maintenance cost of the department.
Planning of insured spare parts inventory to avoid unscheduled long down time.
I can execute erection &maintenance activities of all equipments in modern cement plant.
Documentation of statutory requirements like safety and ISO records.
Knowledge in SAP
KEY SKILL SET
Project Execution, Team leadership, People development, Relationship management, Green field cement plants and plant maintenance services, Manpower planning, site team management and coordination between various suppliers, consultants and contractors, Motivating and Monitoring and training team members for accomplishing the desired objectives, new key contacts developments.
PRESENT ROLE
Present I am working in project as a HOD (MECH) in DGM position in SATGURU CEMENT (SAGAR CEMENT GROUP) since October 2019 which is 1 MTPA Green field project.
MAGER WORKS CARRIED OUT IN BHAVYA CEMENT) which is a 4000 TPD capacity modern dry process cement plant.
Worked in Bhavya cement Since February 2017 to September 2019 as HOD (Mech) in DGM position. Which is a 4000 TPD capacity modern dry process cement plant.
KILN Out let shell Replaced
Cooler ESP 1st & 2nd fields retrofit has done
Cooler seals total Replaced
Cement mill -2 1st chamber shell liners, head liners, diaphragm replaced by AIA
Cement mill-1, 2nd chamber shell liners replaced
Coal mill rollers &Table in situ hard facing has done
Kiln out let tip casting plates replaced with modification
Cement mill-2 pinion shaft Replaced
Reclaimer chain replaced
Raw mill vrm table hard facing has done
Cement mill-1 main drive gear box inter mediate shaft with gear replaced
Pre heater 6th cyclone roof, cyclone cylindrical portion, raiser duct replaced
Cooler hydraulic station modification has done
Modification works planning & execution
7.2 MW WHR (LNVT SINOMA) project erection planning, execution.
MAGER WORKS CARRIED OUT IN DALMIA CEMENT
Worked in Dalmia cement Ltd since 2015 to 2017 as a Sr manager (Mech) which is 3800 TPD plant.
Cement mill- 1 slide shoe bearings both inlet & out let replaced
Cement mil-2 inlet slide shoe bearings replaced
Cement mill- 1&2 in let slide ring (TYRE) Grinding has done
Cement mill in let slide shoe & slide ring guard seal (FLS y seal) erection done.
Cement mill Head liners, shell liners first chamber, diaphragm plates replaced to both mills.
Separator recirculation ducts erection done for both mills
Raw mill VRM gear box sun pinion replaced
Raw mill VRM roller liners (sinter cast) replaced
Raw mill VRM roller bearings replaced to two rollers
Kiln out let shell replaced
Raw mill CA Fan retrofit
CLINKER GRINDING ROLLER PRESS
a)Rollers hard facing work has done
b)Roller press gear box total bearings replaced
c)Roller press hydraulic system replaced with span craft system
d)Complete in let chute modification has done
OBJECTIVES OF PRESENT ROLE
Responsible for good Mechanical maintenance practices.
Responsible for day to day maintenance of all the Mechanical Equipments.
Execution of Preventive maintenance schedules.
Planning of spare requirement
Planning of requirement of Insured items for Smooth operation of the plant.
Modification works planning & execution.
Monthly spares consumption report & cost auditing.
Monthly man power consumption report & cost auditing.
Daily manpower allocation for maintenance works.
Head office correspondence regarding spares Requirement and approvals for developments.
Execution of maintenance of ISO Records and Safety records.
Monthly Stoppage analysis of all the equipment.
Brake down Analysis & Root cause analysis and preventive measures.
Work Experience in Penna cement Talaricheruvu unit
Joined as trainee engineer in 1993 and executed in various levels from
1993 to 2006 in 1800x2 =3600 TPD Walchand nagar Plant.
100 TPH RAW MILL ERECTION AND COMMISIONING. Make M/S
Walchand nagar ltd pune.
100 TPH and 130 TPH RAW MILLS AND CRUSHER Maintenance Make
M/S Walchand nagar ltd pune.
150TPH of 3 BALL MILLS and 90 TPH SLAG VRM Maintenance Make M/S UBE
Work Experience in Penna cement Boya reddy palli unit
Tansferd to boyareddy palli unit in 2007 for Erection, commissioning and executed various levels in pyro section, Post clinkerisation and raw mill section up to 2015 in 4500 TPD FLS Plant.
90 TPH Slag VRM ERECTION& COMMISIONING. Make M/S UBE Engineering, Japan.
200 TPH Ball Mill Erection and Commissioning and Maintenance. Make M/S. FLS.
380TPH RAW MILL VRM Erection and Commissioning .Make M/s UBE
STACKER RECLAIMER Erection. Make: ELECON
Chain, Belt elevators & DDPC. Make; M/s. AUMUND.
RABH, make; M/s. Thermax.
. FLS KILN AND SF cross bar cooler maintenance
Packing plant maintenance, wagon loading machines,wagon tippler
MAGER WORKS CARRIED OUT IN PENNA CEMENT BOYAREDDY PALLI UNIT
VRM Table liners replaced
VRM roller tyre replaced
VRM roller bearings replaced
VRM roller hydraulic cylinders replaced
VRM Gear box thrust pads replaced
VRM swing lever bearings replaced
VRM gear box complete over hauling has done
FLS cross bar cooler cross bars replaced
Kiln out let tip casting plates replaced
Kiln in let sectors replaced
Kiln inlet slope modification has done to avoid jamming
Pre heater 5th & 4th cyclone dip tube segmented type replaced
Pre heater 3rd cyclone dip tube replaced
Cement mill weigh feeder discharge chute modification has done to control dust
Mill discharge B/E Chain replaced
ACHIEVEMENTS
Cement mill slide shoe bearings frequent damage avoided by install slide ring seal.
Frequent slide shoe bearing oil replacement avoided by replacing slide ring seal.
Cement mill vent fan power reduced by increasing fan inlet duct from 550 mm to 1100 mm.
Cement mill separator efficiency increased by providing Re circulation ducts.
Roller press chute vast wear avoided by providing surge box.
Roller press efficiency increases by adjusting roller gap and chick plate angle.
VRM power decreased by table hard facing.
In situ roller (coal mill) hard facing started to avoid rollers removing from mill & Re fixing and to avoid time waste & manpower.
Kiln out let before tip casting additional retainer installed to avoid expansion on tip casting bolts.
Personal Details:
Name : K.VENUGOPAL
Date of Birth : 14-05-1969
Marital status : Married
Permanent Address : K.VENUGOPAL
S/O K.BALAIAH
DNO 3/549 2ND ROAD
KRISHNAPURAM (STREET)
TADPATRI PIN 515411
ANATAPUR DIST
ANDHRAPRADESH
Languages Known : Telugu, English, Hindi and Kannada.
Passport No. : F 4630316
Notice Period : 3 months
Total experience : 28 years
Experience in cement plant: 27 years
Cement organization : Satguru Cement Pvt ltd {Sagar cement group)
Madhya Pradesh
Current Designation : DGM (Mech.)
Education : B-Tech Mechanical engineering
CTC per year : 2100000 /- Lakhs