Summary
Years of experience
Industries
Refining/ Petrochemicals
Upstream/Oil and Gas
Onshore/ Offshore
Power Distribution
Types of facilities
Refineries/ Petrochemicals
Production Facilities
Power Plants
Water Treatment & Injection
Areas of expertise
Engineering
Construction
Quality Control
Commissioning
Key clients
Shell/PDO
Saudi Aramco
ADCO/GASCO
KNPC
QP
Professional summary.
Over 20 years of experience in Project Management (PMC), EPC, QA/QC Inspection, Construction Engineering and Pre-comm Dealt with coordination and project execution of Electrical System in large Process Plants Green/Brown Field Oil& Gas, Refinery, Petrochemical, Sulphur Recovery Plants, Power Plants (GT), Power Distribution (33kv O/H Line), Substation (Indoor-outdoor), Fabrication Yard, Marine Jetty, Ship Loader Equipment.
Qualifications
Education
Government Polytechnic/Engineering CollegeNager Coil, Tamil Nadu
Registrations / Certifications / Licenses
Diploma in Electrical & Electronics Engineering
BTech in Electrical Engineering
Professional Registration as Chartered Engineer is under process
Member of Institute of Engineering & Technology, UK (Membership No: 110*******)
Possess Competency Supervisory Certificate (‘C’ License) issued by Electrical Licensing Board, Tramlined, India
ISO 9001:2008 Series Quality Management System / Lead Auditor IRCA Certified Course Conducted by Moody International Certification India – 2010
Current projects
KNPC Clean Fuel Project (CFP)-Kuwai
Core skills of E&I System (Installation, Quality,Testing and Pre-commissioning).
Transformers,NER, Bus Ducts, Switch Gears, PCC and MCC,Over Head Line, EDG set, Package Substation Motors, UPS /Battery Charges MOV, Lighting &Power System, Lightning& Earthing System, HVAC System, EICS, ENMC,FAR, F&G, PEAS system, Electrical Heat Tracing,HV/LV Cables, VSD, VFD Cathodic Protection, Hazardous Equipment, Area Field Instruments, Cables, loop check etc. Engineering Drawing, Review of ITP, MS, TRA, Construction &quality documents, Review of material requisition and Data Sheet, Inspection of various material arrived laydown, stored at site. Conversant with international standards, codes, engineering practices such as IEC, NEMA, BS, IEE, Shell DEP etc.
Experiences
1-Wood plc-Kuwait
Electrical Engineer-QA/QC (MAB 2), KNPC Clean Fuel Project Kuwait (CFP) (2015 - Present
Project Cost USD 12 Billion.
Study/review the scope of work and Electrical/Instrument technical specification, approved drawings and standard drawings.
Assure the quality of job during construction, testing and commissioning
Guide the construction group to ensure all works are in compliance with KNPC Engineering standard (DEP, SHELL) and all other required standards, material specifications and project schedules.
Manages the construction and erection works carried out by employed Construction contractors, ensuring that the safety, quality, time, cost, and environmental protection requirements of the construction activities are met.
Initiating NCR’s for all non-Conformances in the project whenever required, as per the Project Standard/Specification.
Pre-Mechanical Completion walk down and Punchlist.
Involving with Process startup safety review (PSSR).
2-AmecFoster Wheeler Energy Ltd
Electrical Engineer-QA/QC -PWC, KNPC-MAA CFP Site Preparation Project, Kuwait (2013 – 2015).
Project cost USD 136.4 Million
Preparatory work Contractor (PWC): Guide the construction group to comply all the underground and above ground existing system dismantling and newly Electrical/Instrumentation (Package Substation, Brass Alloy, Gate Houses, fencing work, earth work etc) installation with KNPC Engineering standard (DEP, SHELL) and all other required standards.
Review and approval of Quality Documentation (Inspection and Test Plan (ITP), Procedures, Drawings & Vendor Data Sheets, Material Specifications and other Quality related documents submitted by Contractors) pertaining to Electrical and Instrumentation activities.
Managing a team of main/sub-contractors on different disciplines.
Locally, responsible for leadership people and recourses management work allocation and manpower planning managing.
Risk identification and management, scheduling, recourses planning, and execution monitoring, and controlling extremely tight construction site.
Coordinating with Management, Client of project execution team & Sub-Contractors with Safety and Quality standards.
Familiar with Mechanical Completion Walk down/Punch list generation and close out.
Familiar with Mechanical; Completion Dossier and Quality Documentation Review.
3-Foster Wheeler Energy Ltd (Abu Dhabi, UAE)
ElectricalEngineer-QA/QC at ADCO Bida Al Qemzan Field Development Project(BuHasa) (2011 - 2013).
Project cost USD 500 Million
For the construction, installation testing and commissioning of 33kv substation, 33kv O/H line. MPP Station and 16” main transfer line at BuHasa for Abu Dhabi Onshore Oil Company Field Development Project.
Study/review the scope of work and Electrical &Instrumentation, CP technical specification, approved drawings and standard drawings assure the quality of job during construction, testing and commissioning.
Guide the construction group to ensure that all works are in compliance with ADCO requirements
Engineering standard (DEP, SHELL) and all other required standards.
Material specification and work schedule to ensure the construction activities without any stop or delay in the scheduled completion date of the project.
Review and approval of various Field Change Notification (FCN) for changes from Approved for Construction (AFC) Drawings.
Conduct daily meeting with subcontractor, ADCO Inspection department, PMT and site crew to monitor the work in progress and the target schedule.
4-American Bureau Shipping (ABS-Consultant)
Quality Control E&I & CP Inspector at Ruwais Sulphur Expansion Project Phase III Supplied to Takreer, Abu Dhabi, UAE (2009 - 2010).
Project cost USD 750 Million.
Quality inspection of Construction, testing and pre-Comm activities onshore sulphur plant (relative jetty loading platform).E&I system based on the project specification and standards. Working with as-built drawings, schematics, data sheet, spec sheet, manuals and calibration records, method of statements, work procedures and task lists.
Review and approval of Quality Documentation (Inspection and Test Plan (ITP), Procedures, Drawings & Vendor Data Sheets, Material Specifications and other Quality related documents submitted by Contractors) pertaining to Electrical and Instrumentation activities.
Inspection of various materials and equipment which arrived lay down, stored at site.
Quality control inspection, pre-commissioning checks in plant E &I system.
Raising Non-Conformance Reports (NCR) based on Project Specification.
Review of ITP, MS, TRA, Vendor, shop drawing and required quality documentations.
Familiar with Mechanical Completion Walk down/Punch list generation and close out.
Perform Routine Surveillance, Quality Control Inspection of construction activities at various Inspection Stages such as Pre-Installation, Installation & Pre-Commissioning and Final Inspection for various electrical equipment
5-Snamprogetti S.P.A(Saipem-Saudi Arabia)
QC Electrical Inspector,Khurais Water Injection Facilities & Utilities (KUC)(2008 - 2009)
Project Cost 10 Billion USD.
Carryout quality inspection of Construction, testing and pre-Com. Activities in plant E&I system based on the Saudi Aramco project specification and standards.
6-Valosi Certification Service LLC-Abu Dhabi
Supplied to CTJV, Ad Yard, as Third Party E&I Engineer, Qatar Gas II Development Project LNG Berth-5 Loading Platform (2007 - 2008)
Inspection of Construction, testing and pre-com. Activities in plant E&I system based on the Qatar Gas project specification and standards.
Carry-out E&I System (Cables, Trays, Periodic inspection of cabinet/station/instrument/connection termination, Earthing, tubing, calibration of Instrument like pressure safety valves flow transmitters etc) installation, testing and pre-commissioning as per Qatar Gas Project Specification.
Installation for all type instrument extension, PT, FT, PDT FIT, LI, FI, PI, TT, TE Control valve tubing, skin TT&TE, installation control switches.
Calibration and loop checking crew organizing Loop check functional check and arrange material andhook-up tubing, and piping.
7-Japan Gas Corporation (JGC ME FZE-Qatar, Ras Laffan)
QC Electrical Inspector, Dolphin Onshore Upstream Compressor Facilities Project (2006 - 2007).
Quality inspection of Construction, testing and pre-com. Activities in plant Electrical system based on the project specification and standards.
Witness, testing and calibration of all kinds of instruments, cables, motors, Panels, Breaker, Transformer, Transformer, Current Transformer and Protection Relay etc.
Witness of Hi-pot testing for HV/MV cable, HV/MV Switchgear and HV/MV bus bar.
Installation, witness of earthing system installation testing and lighting illumination level test.
Installation and witnessed inspection of HVAC’s system installation and testing.
Familiar with Mechanical Completion Walk down/Punch list generation and close out.
Experience of PAGA, CCTV, wireless system installation and testing.
Installation and testing of Heat Tracing, MOV, OH Cranes.
8-Parson Arabian Industries (PAI JVC-PDO Oman)
QC Electrical Inspector,Marmul Main Pumping Station (MMPS)(2005 - 2006)
Project Value US$ 350Million.
Construction installation and quality inspection oftesting and pre-com activities in plant Electrical system based on the PDO project specification and standards.
Erection and inspection of witness of 33kv OHL installation and testing of ACSR, OPGW Stringing, sagging, Clipping, Sagging and Vibration Damper.
9-Comship AL A Ali Cegelec (Bahrain)
Lead Elect Supervisor, Alstom Power Plant Line 5 Expansion Project(2002 - 2005).
Project cost 300 million USD.
Worked on several projects and work locations in Kingdom of Bahrain. His participation on this project has provided experience through all project stages including conceptual Engineering, Supervision, and QA/QC and commissioning.
Carryout 210mw Power Plant related inspection of Construction, Testing and Pre-com. Activities in plant Electrical system based on the project specification and standards.
Familiar with installation, testing and supervision forms the core of project execution technical expertise of ALSTOM Engineer and the workmanship of its installation team aim to satisfy the client’s requirements in project execution.
Inspection and quality control of installation works for 210MW Power plant related inspection of construction, testing and pre-comm. Activities in plant Electrical system based on the project specification codes and standards.
Earlier Career Highlights
10-1999 - 2001 KOC West Supper GC-26, 27 and KNPC, AGR Project)-Electrical Supervisor.
11-1993 - 1997 General Electrical and Spinning Mill Project, Power System Construction (Coimbatore-India)-Electrical Engineer
Professional History
Wood (2015 – Present.)
Amec Foster Wheeler Energy Ltd (2013 – 2015).
Foster Wheeler Energy Ltd (2011-2013).
American Bureau Shipping (2009 – 2010).
Snamprogetti S.P.A (2008 – 2009).
Valosi Certification Service LLC (2007 – 2008).
Japan Gas Corporation (2006 – 2007).
Parson Arabian Industries (2005 – 2006).
Comship AL A Ali Cegelec (2002 – 2005).
Almeer Technical Service Company WLL (Atsco-Kuwait) (1999 – 2001).
Power System Construction (Coimbatore-India) (1993 – 1997).
CV Approved Status With.
KNPC Approved Electrical Engineer (Construction) and KNPC Approved Electrical Engineer (QAQC).
ADCO Approved Electrical Engineer (adg9112380).
TAKREER/Gasco Approved Electrical QC Inspector.
ARAMCO Approved QC Inspector with sap number.
Responsibilities Of HSE:
Attendance of HSE and TRA Meeting and reviewed.
Daily and Weekly PTW Auditing check list verified at site.
Attendance of Tool Box Meeting (TBM) &Pre- Talk Task (PTT) at site.
Preparation of Hazard/Near Miss Report.
Electronic &Green area PTW Issued and Coordination with HSE Manager.
Knowledge of site safety Inspection.
Kumara Dhas
*********@*****.**.**.+919********* and +965********.