Post Job Free
Sign in

Engineer Mechanical

Location:
Dammam, Eastern, Saudi Arabia
Salary:
Negotiable
Posted:
September 10, 2020

Contact this candidate

Resume:

M. DAVID RAJKUMAR

Personal Information

Nationality:

Indian

Date of Birth:

Oct 22, 1969

Address:

*,*.*.*** *****,

Vellore – 6

Tamil Nadu, India.

Ph # +91-915*******

Mob # +966-053-147-5493

Education

B. E. Mechanical Engineering

1993

University of Madras

Chennai (INDIA)

E-mail ID

Per: **************@*****.***;

Languages

English & Tamil

Extracurricular Activities

Knowledge of Computer:

MS-Dos

MS-Office

Experience in software like:

Auto-Cad Release 10

Micro Station SE

CAESER II – Pipe stress analysis

ELITE – Fire Sprinkler

Primavera

ProjectWise

SAP – R/3 – (Trained by Saudi Aramco)

MaCS - Material Cataloging System - (Trained by Saudi Aramco).

Professional Memberships

Member of Project Management Institute – Arabian Gulf Chapter

Member ID # 1228141.

Summary of Work Experience

More than twenty FIVE (25) years qualified experience in the design, as-built, QA/QC, cad and management of Oil/Gas, Petrochemical and Chemical plants.

Responsible for the preparation and checking of all Piping deliverables which includes mechanical specifications/data sheets, equipment/piping layouts, isometrics, material take-off, P & I Diagram, piping stress analysis reports, equipment/piping databases(from MS Access) with in built calculation programs.

Working experience and knowledge of SABIC and SAUDI ARAMCO Standards, Procedures and Material Systems (SAMSS), ASME B31.3, B31.4,B31.8 ANSI, API, AWWA all applicable and International Standards.

Work Experience

Jan. 2020- Present

ARABIAN CONSULTING ENGINEERING CENTRE (ACEC)

Al-Khobar, KSA

Senior Project Engineer

Project Involvement:-

KJO-GES: KUWAIT GULF OIL COMPANY / ARAMCO GULF OPERATIONS.

SABIC/SABTANK PROJECTS.

SABIC/YANSAB PROJECTS.

Nature of work: -

Liaison and coordination with Clients, vendors, manufacturers and construction contractors to gather or give project information

Preparation of Project Quality Plan

Project overall coordination and inter discipline coordination

Project Design Request Scoping. Estimate Man - Hours and Evaluating Technical Bid.

Project Technical Support for EWO’s.

QA /QC Checking for various plant piping design projects with interdisciplinary checking for piping interface with instrumentation, electrical and civil disciplines.

Checking of piping layouts and isometrics.

Promotes, supervise and monitor compliance with Company QA procedures for Piping Department work.

Handle Bidders queries & responses for the projects.

As-Built

Mar 2014- Dec 2019

SAUDI CONSULTING SERVICES (SAUDCONSULT)

Al-Khobar, KSA

Senior Project Engineer

Project Involvement:-

KJO-GES: KUWAIT GULF OIL COMPANY / ARAMCO GULF OPERATIONS..

BI-10-07575 – KING ABDULAZIZ CENTER FOR WORLD CULTURE (ITHRA), AT DHAHRAN, SAUDI ARAMCO.

BI-10-00017 – UPGRADE INDUSTRIAL DRAINAGE SYSTEM. AT SAFANIYAH, SAUDI ARAMCO.

BI-10-00207–UPGRADE INDUSTRIAL WASTE WATER SYSTEM AT SAFANIYAH, SAUDI ARAMCO.

BI-25-00012 – THUWAL TOWN DEVELOPMENT SEWAGE TREATMENT PLANT, DISTRIBUTION SYSTEM.

Nature of work: -

Liaison and coordination with Clients, vendors, manufacturers and construction contractors to gather or give project information

Preparation of Project Quality Plan

Project overall coordination and inter discipline coordination

Project Design Request Scoping. Estimate Man - Hours and Evaluating Technical Bid.

Project Technical Support for EWO’s.

QA /QC Checking for various plant piping design projects with interdisciplinary checking for piping interface with instrumentation, electrical and civil disciplines.

Checking of piping layouts and isometrics.

Promotes, supervise and monitor compliance with Company QA procedures for Piping Department work.

Handle Bidders queries & responses for the projects

As-built

Jul 2012- Feb. 2014

SAUDI CONSULTING SERVICES (SAUDCONSULT)

Al-Khobar, KSA

Senior Project Engineer

Project Involvement:-

Project: TRANSMITTING TREATED WATER

Client: AL-HASA’A IRRIGATION & DRAINAGE AUTHORITY

MINISTRY OF AGRICULTURE

Contractor: SINOPEC

Project Description:

The project, includes the construction, supervision services for Transmitting Treater Water from Al-Khobar STP upto Al-Hasa Irrigation Channels.

Responsibilities:

Study, Review and approval of the shop drawing with reference to the contract drawing of the mechanical works.

Approval of the Mechanical Materials and Equipments.

Supervision of all Mechanical works.

Attend all the contractor’s testing and pre-commissioning activities as per project specification.

Check monthly evaluation report.

Coordination with all discipline as per project design.

Review and approval of the as built drawing for handing over the project as well as exception items list.

Dec 2010- Jun. 2012

SAUDI CONSULTING SERVICES (SAUDCONSULT)

Al-Khobar, KSA

Senior Project Engineer

Project Involvement:-

Project: AL-KHOBAR LAKES DEVELOPMENT

Client: EMAAR MIDDLE EAST LLC

Contractor: BUILDING CONSTRUCTION CO

Project Description:

The project, includes the construction, supervision services for 250 villas and design liability also includes raft struture works, finishes, electro-mechanecal works,in addition to infrastructure works which includes grading works for all villages,deep and shallow services, sewer treatment plant "stp",maim discharge lines,water wells for all villages

Responsibilities:

Study, Review and approval of the shop drawing with reference to the contract drawing of the mechanical works.

Approval of the Mechanical Materials and Equipments.

Supervision of all Mechanical works inside building such as installation and testing of portable water lines and accessories, drainage lines and accessories, storm water lines, irrigation lines and fire fighting pipes with sprinklers system.

Attend all the contractor’s testing and pre-commissioning activities as per project specification.

Check monthly evaluation report.

Coordination with all discipline as per project design.

Review and approval of the as built drawing for handing over the project as well as exception items list.

Aug 2009 - Nov 2010

AMCDE

Al-Khobar/

Jeddah, KSA

Senior Project Engineer

Project Involvement:-

BI-10-00905 – DEBOTTLENECK SHAYBAH FACILITIES- GOSPS PLANT PIPING AND INETRCONNECTING PIPELINES.

EWO 09W141 – PROCURE AND INSTALL TWO ARAB HEAVY CRUDE OIL PUMPS AT JEDDAH REFINERY.

EWO 09W018 – UPGRADE LPG MAKE-UP SYSTEM TO FUEL GAS SYSTEM AT JEDDAH REFINERY

EWO 09W021 – UPGRADE FIRE AND SAFETY AT NAJRAN BULK PLANT.

EWO 09W081 – MODIFY CRUDE OIL TERMINAL DEPARTMENT FABRICATION SHOP AT YANBU.

Nature of work: -

Preparation of Tie-in Packages includes Scope of work, P&ID, Piping Plan, isometric, SIS & Valve Data sheet.

Liaison and coordination with Clients, vendors, manufacturers and construction contractors to gather or give project information

Preparation of Project Quality Plan

Conducing Kick of Meeting & Minutes of Meeting

Project overall coordination and inter discipline coordination

Project Design Request Scoping. Estimate Man - Hours and Evaluating Technical Bid.

Project Technical Support for EWO’s.

QA /QC Checking for various plant piping design projects with interdisciplinary checking for piping interface with instrumentation, electrical and civil disciplines.

Checking of piping layouts and isometrics.

Promotes, supervise and monitor compliance with Company QA procedures for Piping Department work.

Material take off using Saudi Aramco Material Specification (SAMSS)

Handle Bidders queries & responses for the projects

Drawings Retrieval for the projects

Conducted Site Visits @ Aramco Plants @ Jeddah, Yanbu, Najran and Abba.

Oct 2007 - July 2009

SOFCON / FOSTER WHEELER

Al Khobar, KSA

Senior Piping Engineer

Project Involvement:-

KARAN Gas Facilities - PMC

Nature of work: -

Project overall coordination – Foster Wheeler UK and Saudi Aramco – PMC.

Preparation of Tie-in Package for Karan Gas in Khursaniyah Gas Plant.

Preparation of Site Development Package for Khursaniyah Site.

Modification and routing of pipelines in existing plants as per Project requirements.

Checking of piping layouts and isometrics.

Preparations of tie in schedule with the existing plant.

Material take off using Saudi Aramco Material Specification (SAMSS)

Drawings Retrieval

Site Visits – Khursaniyah Gas Plant.

Mar 2007 - Sep 2007

SOFCON / FOSTER WHEELER / ARAMCO OVERSEAS COMPANY

Rastanura Refinery, KSA

Senior Piping Engineer

Project Involvement:-

Rastanura Diesel Hydrotreater Project – PMC

Nature of work: -

Project overall coordination – Foster Wheeler UK and AOC (Aramco Overseas Company) – PMC.

Preparation of Tie-in Package for Rastanura DHT Project.

Modification and routing of pipelines in existing plants as per Project requirements.

Checking of piping layouts and isometrics.

Preparations of tie in schedule with the existing plant.

Material take off using Saudi Aramco Material Specification (SAMSS)

Drawings Retrieval

Site Visits – Rastanura Refinery.

Mar 2004 - July 2006

SOFCON

Al Khobar, KSA

Piping Engineer

Project Involvement:-

Rabigh Development Project.

Khurais Development Project.

BI-10-03563 Upgrade Waste Water Treatment Facilities at Jeddah Refinery.

BI-10-00084 Upgrade Western Region Waste Water Systems.

BI-0232 Maintaining & Optimizing Production in Mubaraz Area.

BI-3093 Replace Abqaiq Pump Station.

Mechanical Seal Upgrade LPG Pumps @ Ras Tanura Terminal.

Nature of work: -

Project overall coordination.

Project Design Request Scoping. Estimate Man - Hours and Evaluating Technical Bid.

Experience and knowledge of Saudi Aramco Standards and Procedures.

Modification and routing of pipelines in existing plants as per Project requirements.

Checking of piping layouts and isometrics.

Preparations of tie in schedule with the existing plant.

Material take off using Saudi Aramco Material Specification (SAMSS)

Piping Stress Analysis

Drawings Retrieval

Site Visits (Duba, Tabuk, Turaif, Al-Jouf, Jiddah, Rabigh, Yanbu & Najran - Bulk Plants)

Aug 2006 - Feb 2007

Saudi Aramco (SOFCON)

Al Khobar, KSA

Project Engineer - Mechanical Standardization

Project Involvement:-

Materials cataloging for various Saudi Aramco Projects (BI-10-3093, BI-10-1107, BI-10-0069 and BI-10-8287).

Using SAP-R/3 and MaCS Software’s.

Mar 2004 - July 2006

SOFCON

Al Khobar, KSA

Piping Engineer

Project Involvement:-

Rabigh Development Project.

Khurais Development Project.

BI-10-03563 Upgrade Waste Water Treatment Facilities at Jeddah Refinery.

BI-10-00084 Upgrade Western Region Waste Water Systems.

BI-0232 Maintaining & Optimizing Production in Mubaraz Area.

BI-3093 Replace Abqaiq Pump Station.

Mechanical Seal Upgrade LPG Pumps @ Ras Tanura Terminal.

Nature of work: -

Project overall coordination.

Project Design Request Scoping. Estimate Man - Hours and Evaluating Technical Bid.

Experience and knowledge of Saudi Aramco Standards and Procedures.

Modification and routing of pipelines in existing plants as per Project requirements.

Checking of piping layouts and isometrics.

Preparations of tie in schedule with the existing plant.

Material take off using Saudi Aramco Material Specification (SAMSS)

Drawings Retrieval

Site Visits (Duba, Tabuk, Turaif, Al-Jouf, Jiddah, Rabigh, Yanbu & Najran - Bulk Plants)

Nov 2001-Feb 2004

SOFCON

Riyadh Refinery, KSA

Design Specialist

Project Involvement: -

BI-3512 Process Pressure Sewer @ Riyadh Refinery

BI-3781 Reinstate LPG Spheres @ RR

Coordination and As-Built of Process area @ Riyadh Refinery

Coordination and As-Built of Tank Farm Area @ Riyadh Refinery

Project Technical Support for EWO’s.

Jan 2001- Oct 2001

SOFCON

Al-Khobar, KSA

Piping Designer

Project Involvement: -

BI-8285 JO-51294 SO #028/743-300/018 Tie-in UTMN-1498 & 1499 to UTMN GOSP-12, Crude Oil Flow Line Detailed Design Engineering Project – Uthmaniyah.

EWO #01W302 SO #021/750-130/114 As-builting Jizan Bulk Plant Isometric Drawing Project.

EWO #01C197A SO #007/750-110/587 Asbuilting Power Distribution Department (PDD) Drawing Project.

EWO-01N907 SO #021/750-130/157 Asbuilting Saudi Aramco Training Center Diner Project – Ras Tanura.

Prepared the Plan and Profile, Hydrostatic Test Diagram, Piping Plan, Isometric, Tie-in Isometric, Individual and Reconciliation MTO’s, Safety Instruction Sheet, Hazards Identification Check List and Construction Scope of Work to BI-8285 JO-51294 SO #028/743-300/018 Tie-in UTMN-1498 & 1499 to UTMN GOSP-12 Crude Oil Flow Line Detailed Design Engineering Project Uthmaniyah.

Oct. 1997 – Dec 2000

International Design Engineering & Computer Systems (IDEC)

Al-Khobar, KSA

Mechanical Engineer

QA/QC of Instrument Line Diagram, Electrical Single Line Diagram, Piping and instrument Diagram, Isometric drawings, Civil and structural drawings to Saudi Aramco projects:

Projects Involved:

B1-10-3126 Shedgum Gas Plant, SGP Gas Detector Replacement Project.

BI-3126, Shedgum Gas Plant, DCS Upgrade Project.

BI-3127 Uthmaniyah Gas Plant, DCS Replacement Project.

BI-8259 Uthmaniyah Gas Plant, UGP CCR UPS Equipment Replacement.

BI-8268, Uthmaniyah Gas Plant, UGP Substation Rebuild

Petrokemya CADD System.

Dec 1993- Sep 1997

Design Desk India Pvt. Ltd. Chennai, India

Mechanical Engineer

Creation, Editing/Modifying, Internal Checking, QA/QC for the following drawings:

Piping and instrumentation.

Construction isometric

Piping plans, elevation and sections

Civil and structural

Electrical single line diagrams and instrument loop.

Prepare and maintaining drawing control.

Major projects involved:

1.Prepared As-Built isometrics for Manali Refineries Limited (MRL), Madras, India.

2.Prepared piping plan for FACT Engineering Design & Organization (FEDO), Cochin, India.

3.Prepared instrument loop diagram for Madras

Fertilizer Limited (MFL) Madras, India.

Major Clients:

Bharat Heavy Electrical Ltd. (BHEL)

Engineers India Limited (EIL)

International Design Engineering Association India Limited (IDEA)

Tamil Nadu Petro Products Limited (TPL)

Manali Refineries Limited (MRL)

Manali Fertilizers Limited (MFL)

Indian Oil Corporation (IOC)

Hindustan Petroleum Corporation LTD

Indira Gandhi center for Atomic Research and Titanium Equipment and Anode Manufacturing Company LTD. (TEAM).

RESUME



Contact this candidate