MUDASAR AHMAD CHIEF SURVEYOR /Survey Coordinator
Cell #; 00974- 50592788, 70098164 Qatar, 0092-344-***-**** (Pk)
ID: *****************@*****.*** / ****************@*****.***
(Current Location Qatar)
Country Experience (Qatar, U.A.E, Oman and Pakistan)
Objective:
Join a career-promising organization that offers a responsible and challenging job and a congenial working environment along with many opportunities to work with highly educated professionals to ensure rapid professional growth. I want to do some exceptional work in my professional career.
Education Background:
Bachelor degree in Civil Engineering Technology
3 years Diploma of Associate Engineer (Civil) 1998-2001
Good knowledge in AutoCAD & AutoCAD civil 3d
Key Profile:
I have more than 18Years of Experience in surveying field. My journey in surveying starts from surveyor to position of senior surveyor & Survey Coordinator. Presently I am working with AL JABER MAKHLOUF Construction. I have Exp. Buildings & High rise building, roads, pipe lines; bridges, infrastructure, oil & gas, & land scape .I can handle all the steps of the survey.
Computer Skills:
AutoCAD, Civil 3D, Excel, Word.
Software Lis CAD, Leica Geo Office, Pro Link.
Data downloading & processing data of Total Station & G.P.S
Professional Skills:
a.Ability to communicate effectively with consultant/Contractor and authority representative and other project team members.
b.Familiar with Topographic Survey work
c.Well knowledge all survey work and survey Instruments.
d.Knowledge of downloading data from instrument & Processing Importing & Exporting.
e.Strong verbal and written communication skills.
f.Build successful working relationships with internal departments.
Working History in Qatar, U.A.E, Oman and Pakistan
1) Organization AL JABER MAKHLOUF Qatar
Designation Chief Surveyor / Survey Coordinator
Period Feb. 2017 to until
Project: - New Orbital Highway Doha
(NOH Contract 3) salwa road to mesaieed
B-RING ROAD (CURRENT PROJECT)
2) Organization KCT & UCC Contracting and Trading Qatar
Designation Sr. Surveyor/ Survey Coordinator
Period July 2012 - Feb. 2017
Project Lakhwiya Football Stadium (infrastructure work)
Mall of Qatar
High rise tower in lusail
Aspire Park Edutainment Complex (road & infra. work)
3) Organization SPK Construction Abu Dhabi
Designation Senior Land Surveyor
Period May 10 – July12
Project: - AL Falah community development
730 villas
4) Organization City Surveys U.A.E
Designation Land Surveyor
Period Sep. 05 – Dec.09
Project Jebal Ali Airport
Largest Dubai Mall
Tunnel, Road, Bridge & infrastructure works
4a) Organization Al Manarah Oman
Designation Land Surveyor
Period July. 09 – Dec.09
Project Topographic Survey
5) Organization Engineering Survey Consultant Pakistan
Designation Land Surveyor
Period Oct. 02 - Apr.05
Project Tunnel, Road & Bridge Works
Topographic Survey
6) Organization Chaudhary Brothers Lahore Pakistan
Designation Land Surveyor
Period Feb.01 - Sep. 02
Project Oil Refinery (Rawalpindi)
Topographic Survey
Professional Experience in Qatar, U.A.E, Oman and Pakistan
1AL JABER MAKHLOUF CONSTRUCTION Qatar
Project New Orbital Highway (NOH contract 3)
Project B-RING ROAD
Position chief Surveyor/ Survey Coordinator
Period (Feb. 2017 to till now)
Responsibilities:-
A 10 lane of total length 42 kilometer, Highway project, including Truck Route with 5 junctions, under ASHQAL (Municipality of Qatar). As a senior surveyor my responsibilities.
Prepare the data for site work and data download from total station and G.P.S
Responsible for all control points with static method.
Provided technical support to any other surveyors involved with each project.
Ensured that all data from surveying expeditions was safely stored.
Maintained an updated database of project.
Dealing with consultant.
Dealing with Design Department.
Providing training for new Equipment to the surveyor.
Quality control for survey work as well as accuracy.
Closely following surveyor’ daily progress report.
2KCT & UCC Contracting and Trading Qatar
Project Mall of Qatar & high rise tower
Position Sr. Surveyor/ Survey Coordinator
Period (Sep. 2013 to Feb. 2017)
Responsibilities:-
Project: Mall of Qatar, Qatar.
Working as Survey Coordinator at Mall of Qatar.It’s Qatar's largest Shopping Mall along with
Services including infrastructure.
Prepare the data for site work and data download from total station and G.P.S. Lay-out and setting out of vertical and horizontal alignment of concrete column,
footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical
layout and electrical layout. To establish and maintain the control points. Lay out (setting out) of project. And Writing technical reports. Planning and overseeing building work. Control top level of slab and marking of block works. Take the as built of slab and submit to consultants.
2A. KCT & UCC Contracting and Trading Qatar
Project Lakhwiya Football Stadium (infrastructure work)
Position As senior land Surveyor
Period June 2012 – Sep. 2013
Responsibilities
I’ve worked in this project As Sr.Surveyor from june-2012 up to Sep. 2013. In this project I’ve worked on Infrastructure (Roads, 4500 Parking’s, Utility Services, 1 Service Building, 6 Substations, Land Scaping, Service Tunneling and Satellite Irrigation System), 1 Football Stadium, Multipurpose facility, Hotel, 4 Foot Ball Training Fields, 2 Changing Rooms n 1 Fitness Center Building. ...more
3. SPK Construction Company (Abu Dhabi)
Project: AL Falah Abu Dhabi 730 villas)
Position As Senior land Surveyor
Period (may2010 to June 2012)
Responsibilities
Prepare the data for site work and data download from total station and G.P.S
Excavation of Earthwork. Check and finalize construction drawing. Check the vertically of walls. Inspection with consultants. Advising clients about building. To establish and maintain the control points. Lay out (setting out) of project. And Writing technical reports. Planning and overseeing building work. Control top level of slab and marking of block works. Take the as built of slab and submit to consultants.
4. Name of employer City Surveys (Abu Dhabi) Period (Sep. 2005 to dec.2009)
Different projects in U.A.E
1. Name of employer Zone Corporation I-cad Abu Dhabi
Project Cadastral Survey
Position as senior land Surveyor
Responsibilities
A cadastral surveyor is responsible for accurately defining property boundaries and understanding the laws of land ownership. This may include the identification of residential or rural boundaries, re-establishing boundaries that have been previously surveyed or creating new boundaries as part of the land subdivision process. A cadastral surveyor has the skill and knowledge to interpret and advice on the location of boundaries and if there are any rights or restrictions relating to the property. The information and measurements taken by the cadastral surveyor are recorded on a survey plan which the surveyor is required to lodge with the relevant government agency.
2. Name of employer CCC & Dutco
Project Largest Dubai Mall- (Dubai)
Position as land Surveyor
Responsibilities
Control top level of concrete. Establishment of Horizontal and Vertical control points for fixedreference using Total Station and level. Inspection of Control points and Joint surveys with sub-contractors. Piles Cut Level, Load Test of Slab with (DNA03 LIECA).Precise . levelling & as Built of slab. Setting out of Leis line marking. Supervising of Excavation and Concrete Piling Work. Lay-out of Grid lines and Axis for columns and footings. Lay-out and setting out of vertical andhorizontal alignment of columns and footings, slabs, doors. Stairs
3. Name of employer Al Naboodha
Project Tunnel, Road & Bridge Works -REEM ISLAND (ABU DHABI)
Position as land Surveyor
Responsibilities
Excavation of Earthwork.
Layout (setting out) and Level mark of Embankment, and ABC.
Setting out for bridge pillar retaining wall and abutment
Setting out for asphalt and control level on main carriage way.
Setting out Retaining Wall, and Control Levelling.
Setting out of all approach Road and Accesses Road and Control Level.
Setting out Drain and Riprap and Control Level.
Layout of Curves (Simple, Reverse, Compound & Transition)
4. Name of employer AL Naboodha
Project Jebal Ali airport, Dubai
Position land Surveyor
Responsibilities
Excavation of Earthwork.
Layout (setting out) of Runway Level mark of Embankment, Capping and ABC.
Setting out for asphalt and control level on runway, Taxi area.
Setting out Apron, Taxi way, Turn Pad area and Control Levelling.
Setting out of all approach Road and Accesses Road and Control Level.
Setting out Drain and Low flow swale Area and Control Level.
Setting out for secondary Duct Bank in Runway, Taxi, Apron, and Turn Pad Area.
Setting out For AGL On Runway,Taxi A,B,C, And Both Turn Pad
Establishment of Horizontal and Vertical control points for fixed reference using Total
Station and level.
5. Name of employer Al Manarah Consultant & Engineering Co. Musqut (Oman)
Project Topographic Survey
Position as land Surveyor
Responsibilities
I’d worked with Al Manarah from June 2009 up to September 2009 on behalf of City Survey on design Surveying related with Sewerage Planning of diff. Cities as a Project Coordinator with client Haya. I have worked on topographic of these cities i.e. Madinath Al Sultan Qaboos, Madinath Al,Aallam, and Madinath Al Qurum (Musqut).
Experience in Pakistan:
4. Name of employer Engineering Survey Consultants
Project different road projects in Punjab
Position Land Surveyor
Period October 2002 to April 2005
Responsibilities
●Excavation of Earthwork.
●Layout (setting out) and Level mark of Embankment, and ABC.
●Setting out for bridge pillar retaining wall and abutment
●Setting out for asphalt and control level on main carriage way.
●Setting out Retaining Wall, and Control Leveling.
●Setting out of all approach Road and Accesses Road and Control Level.
●Setting out Drain and Riprap and Control Level.
Topographic Survey.
5. Name of employer Chaudhary Brother
Project Attack oil Refinery (Rawal Pindi)
Position Land Surveyor
Period February 2001 to September 2002
Responsibilities
Data Collection & Processing. Cross Sectional & Longitudinal Survey Preparation Detail Drawings in Auto cad topographic Surveys. Survey of Pipe Line Oil Tank, Embankment & Other activities. Contouring, X-Section & Building Survey Contouring Survey (D.G.Khan) Contouring Survey 40,000 Acre.
Personal Profile:
Name Mudasar Ahmed
Father name Muhammad Ishaq
Date of birth 01/11/1981
Marital status Married
Nationality Pakistani
Religion Islam
Visa Status Employment Visa
Passport No VC1158252
Cell # 009**-********, 70098164 (QATAR)
Cell # 0092-344-***-**** (PAK)
E-Mail ID ****************@*****.***, *****************@*****.***
Personal Profile:
I do hereby declare the above mentioned information is true and correct to the best of my knowledge and believe.
DATE: - ………
CURRICULUM VITAE