NAME: JOEL A. FLORES Date : January **,****
Desired Position Senior Site Civil/Structural
Engineer
LOCATION & Email – Philippines
Mob. No.+63-928******* & +63
*******@*****.***
CITIZENSHIP FILIPINO
CONTINUOUS SERVICE 22 years.
SPOUSE'S NAME JOCELYN Y. FLORES
CHILDREN'S DETAILS JOILENNE-24,KENNETH-22
KEVIN-20,CJ-16,JOSHUA-13
PROFESSIONAL LICENSES AND SOCIETIES
PHILIPPINE REGISTERED CIVIL ENGINEER (PROFESSIONAL REGULATION COMMISSION)
Registration no. 0041849
Registration date : August 9, 1985
EDUCATION AND PERSONAL DEVELOPMENT PROGRAMS
Degree School Date
B.S CIVIL UNIVERSITY 1984
ENGINEERING OF BAGUIO
OTHER SIGNIFICANT INFORMATION
PERSONAL: Date of birth : October 26, 1961
Place of birth : San Carlos City,Pangasinan,Philippines
CAPABILITY: Experienced in site Civil /Structural management, supervision, inspection
and documents review .
Passport details: Joel A. Flores/Filipino/No.EB4583902/Date of birth: Oct.26,1961,Place of
issuance: Manila/Date of issue:Jan.31,2012/Expiration date:Jan.31,2017.
Qatari License no. 261********-valid February 07, 2016
Driver’s License
OTHER: Awards and Recognitions:
5-years in service recognition, all in OBI-NDIA project.
Silver awards, Bechtel recognition award & contribution scheme
JOEL FLORES,149889
(BRACS).
On the spot recognition, March 11, 2007 (OBI-NDIA)
Safety excellence certificate in issuing the most numbers of
positive action notices,year 2006(OBI-NDIA)
Employee of the month,June 2001 (Washington Group)
Special safety recognition, Nov. 2001(Washington Group)
Special safety recognition Feb. 2002 (Washington Group
WORK HISTORY
COMPANY, DIVISION OR POSITION HELD, SUMMARY OF
DATES DEPARTMENT, RESPONSIBILITIES ANDFROM TO
LOCATION AND SUPERIOR SIGNIFICANT ACCOMPLISHMENTS
October Present Philippines, Pangasinan Self- employed Professional Civil Engineer.
01,2011
Site Civil/Structural Engineer –Started from
June 29 September Overseas Bechtel
2006 29, 2011 Incorporated. mobilization of CP19- Emiri terminal, Public
Construction Dept. mosque and Parking A & B.
New Doha International
Emiri terminal /VVIP pavilion, Mosque and
Airport,Qatar
parking structures are due for completion on
December 18, 2011 (Qatar National Day).
Troy Easthorpe (RE)
I’m so proud being part of it. I started from bored
piling works, witnessed/validated third party
Landline no. 97479 ext. 585
civil/pile tests, to the last Civil/Structural
Mobile no. +974********
completion. These also includes- Ramp tunnel
E-mail : *******@*******.***
excavation, secant and micro piling works,
dewatering, waterproofing, concreting and Emiri
bridge construction.
Latest assignment was the asphalt/concrete
road works in site development zones 1 and
2.
Project Engineer - Structural steel works for
Public Mosque Dome and Parking A and B
lobbies. Performed factory visit and
witnessed structural steel third party testing.
Year 2009, assigned in Ramp facility, Tunnel,
VVIP checkpoint and Emiri gate.
Aside from site works, carried out the following
activities:
Helped our contractor won again
NDIA ES&H yearly Awards-
STARRT, Hazard recognition &
control, PBS and runner –up Large
Contractor of the Year 2009, in
addition to the 2007 and 2008 NDIA
ES&H awards.
Participate weekly in Safety and
JOEL FLORES,149889
Quality tours and sometimes lead
tour, if Senior site Engineer and
Resident Engineer were not
available.
Contribute ES&H materials for
Project review presentation.
Monitor weekly delays then recorded
in daily construction report.
Draft rate of progress (Rop) letter to
the contractor.
Assisted contractor to mitigate these
delays.
Updated ADPI (Designer) needed
information on all on going site
activities to prioritize needed shop
drawings.
Validate contractor monthly invoicing.
Chase OBI Engineering/Field
Engineering, HOK outstanding
drawings, CTI resolution and material
submittals.
Review contractor’s submitted-
Method Statements(MS) and
Inspection and test plan(ITP)
CP-19 ES&H champion.
Site Engineer- Engineered landfill(CP04). A
Jan.14, June 29 Overseas Bechtel
6.5 million m3 of domestic waste transferred
2005 2006 Incorporated.
to 1.0 square km. of domestic landfill situated
Construction Dept.
in Messaied, Qatar.
New Doha International
Airport,Qatar
Provide technical assistance to the contractor.
Goran Stojcovic
Landline no. 97444679 ext.519
Performed daily inspections and monitoring
Mob. no. +974********
contractor site activities.
E-mail:********@*******.***
Implement ES&H compliance on site.CP04 was
completed on time and with no Lost Work Day
Case (LWDC) from package mobilization to
demobilization.
Finally, perform daily activities report.
Sustaining technical employee (STE)/Project
Sept.17 Dec.31 B-Nar Construction and supply
Engineer.
2002 2004 Palaris st.Lingayen,
Pangasinan,Phillipines
Assisted this newly established contractor to
acquire license.
Provided technical assistance for biddings with
Proposed government projects.
The contractor was on tendering process before
JOEL FLORES,149889
I leave for Bechtel.
Formworks supervisor
Sept.05 July 31,02 Raytheon Ebasco overseas,2000 Limited and Asiakonstruk,later
Responsible in the supervision for the
acquired by the Washington
fabrication,installation and dismamtling of
Group International.
formworks utilizing RAPID METAL
DEVELOPMENT(RMD) formworks system of
Spillway Construction Dept.
Australia.
(115x3MW) Hydro-Powered
Accomplished several significant concreting in
San Roque multi-porposed
spillway, such as left gallery,left chute
dam,San Manuel
foundations and walls,cable and pipe ducts in
Pangasinan,Philippines.
piers,left partition foundations and walls,flip
bucket bay #1 and lastly the right training wall.
Pages Ward/Alex Tamowicz
Implemented OSHA standards and practices.
Awarded employee of the month of June 2001
And safety recognitions by Raytheon Ebasco
Overseas Limited.
QA Engineer/Inspector
Nov.17, Feb.17,200 Southern Energy/Sual
1997 0 Construction Corporation.
Monitoring and inspection of earthworks
(600x2MW) A Coal-Fired Sual
activities such as type of backfill materials and
Power Plant.
procedures,compaction and field density test
which also include power plant permanent
QA/QC Dept.
access road and bridges prior to concreting.
Brgy.Pangascasan,Sual
Inspection of rebar sizes,spacing splicing and
Pangasinan,Philippines
the integrity of formworks as per design,
specification and actual site condition.the project
Cris Walker
areas,undertaken are the ff. Compressor house,Auxiliary building, Fuel and Oil separator,
Transformer compound, Water treatment
compound, fly ash, bottom ash silos and power
plant internal road network.
Monitor fly ash and bottom ash silos slipform
construction.
Non-destructive testing(NDT) for pile casing
weld thickness.
Deployment of HDPE liner in ash disposal
areas.An environmental protection to prevent
leachate and rain water to contaminate the
environment.
Site Engineer
Aug.3, Jan. 1997 Abdulla B. Al-Khalifa and Sons
1992 Co.
Responsible in the supervision for the
P.O. Box- 224,Thoqbah installation and concreting of siporex(lightweight
31952,Al-Khobar, Kingdom of concrete) in Saudi catering and contracting and
JOEL FLORES,149889
Saudi Arabia. partly the Aziziyah garden village.(KSA)
Waleed Al-Khalifa/Ki Yong Kim After the completion of the above project,the
company appointed me as a Procurement
Engineer, responsible in the overall procurement
process of the company.
With the trust and confidence of the
company,the management directly assigned me
to manage our manpower supply contract with
ABV rock group KB in Abha .
Field Engineer
Nov. July C.G Severo Construction And
1988 1992 Supply. Supervised the construction of the Pangasinan
Rm.2-3 Fernandez Building State University library and recreation hall.
Perez Blvd.Dagupan City
Concrete perforated drainage.
Pangasinan,Philippines
Performed materials estimates for various
proposed Government project for tendering.
Cesar G. Severo