Post Job Free

Resume

Sign in

Chemical and Power Plant Piping, Heavy Insdustry, Cadd

Location:
Bacoor, Cavite, Philippines
Salary:
Php 60,000.00
Posted:
September 08, 2020

Contact this candidate

Resume:

RESUME

NAME : FELIX D. TOLENTINO JR.

ADDRESS (Residence) : Blk. 35 Lot 9 Molave Street Phase 4 Soldier’s

Hills Subd. IV, Molino Bacoor, Cavite 4102

(Email) : adfwys@r.postjobfree.com

PERSONAL INFORMATION:

MOBILE NO. : +63-927-***-****

DATE OF BIRTH : September 29, 1964

PLACE OF BIRTH : Mandaluyong City

SEX : Male

STATUS : Married

EDUCATIONAL ATTAINMENT:

School Year Degree

Jose Rizal College 1970-1973 Kinder to Grade 2

Aurora A. Quezon Elem. School 1973-1977 Elementary Graduate

Araullo High School 1977-1981 High School Graduate

Lyceum of the Philippines 1986-1993 College Graduate

B.S. in Civil Engineering

Technical Course:

Technological University of the Phils 1981 - Oct.’84 Drafting Technology

Vocational Course:

Araullo Evening Vocational School Oct.’80 – March ’81 Commercial Arts

Computer Training Program:

Systems Technology Institute April to Oct. ’85 Basic Computer Concepts

Technical Training Course:

GoodMark Design Systems Sept. to Dec.’91 Computer Aided Drafting

Page 2 – Resume

Seminars & Training / participated

Date Topic Place

June 2012 Smart Plant 3 Dimension Operation module MIES Conference Office

May 2009 Basic Occupational First Aid Course MMHE Training Yard

February 1993 Pre-Stress Reinforce Concrete Design FIL-Systemas Fabrication

July 1985 Defensive Driving Safety Seminar Socialite’s Driving Institute

PROFESSIONAL EXPERIENCE:

Has almost Eighteen (18) years of comprehensive experience in both engineering design and construction on Civil and Mechanical Piping works for Chemical, Petrochemical, Power and now Oil and Gas Process Refineries and Storage Plants here domestically and abroad. Eight years of Piping design Checker, Three years as Cadd Piping Designer/checker in an On-Shore chemical process plants and Two years in Off-Shore Floating Production Storage and Offloading platform, Five years worked as Auto Cad Designer/operator served in Local Consulting Offices and Industrial firms.

Duties that Includes the application of standard design principles and theories to complete every assignment, ensure the company design safety factors. Utilizes Technical memorandum manuals as compliance with company policies and applicable standards and codes such as ANSI and ASME. Application of safety Instruction sheets requirements and principles that meets SAMSS and ARAMCO Codes Standards. SCECO Code and Standards.

Understands and performs changes, additions and or revisions as required. Task include as Project Team Leader for Civil Group structure and Pavement SP3D modeling on one of the Exxon mobile Ethylene and Polypropelene projects. P&ID check to ensure accuracy/comprehensive of each Isometric deliverables for client satisfaction and later for AFC (MHI Fertilizer project).

Mitsubishi Heavy Industries Asia Pacific Pte. Ltd.

27th floor Robinsons Equitable Tower. Pasig City 1600

POSITION : Piping Designer 3 /Checker

DATE : January 01, 2017 to October 31, 2018

PROJECT INVOLVED : UZBEKISTAN NAVOIYAZOT FERTILIZER

Navoiyazot-Navoi ammonia, Urea Production Plant JSC

Uzbekistan, Russia

Duties & Responsibilities:

Prepare, verify and checked of all In-line piping components as per P&ID marked and color-off all 3d model accomplished isometric inputs as well as verifications of compliance with accordance to Job Instructions and Technical memos. Work with fellow senior designers, Mechanical and Pipeline Engineers throughout the design stages developing detail design drawings Interface between disciplines. Carefully verify and check of any additional vent and drains for all high and low point as well as process vents. Possible mappings locating added vents and drains along those within traced lines. Resting assure of IMS procedures for Isometric workflow diagrams for deliverable isometric outputs. Lately, drafting for traced P&ID for both hot water and Steam traced process and utility lines. Had also been involved in Equipment modeling under Urea and Utility group that incorporate squad checking of vendor and information data sheet.

Mitsubishi Hitachi Power System (MHPS-TS)

24th flr. Cybergate 3 Plaza Bldg. Mandaluyong City

POSITION : Piping Designer 3/Checker

DATE : September 16, 2015 to December 31, 2016

PROJECT INVOLVED : MHI YOKOHAMA AND HITACHI POWER SYSTEMS

MO6, MZEC, REO, SPS Contract Power Plant

Some for Major Expansion Others for Improvement or

New Expansion for their Twin cycle Gas plants.

Page 3– Resume

Duties & Responsibilities:

Assigned to render as support service to our sister company MHI Philippines during their merging with one of Japans Power Producing Design and Manufacturer Hitachi Power System. Work with senior designer on their various power projects functioned as Initial to Pre-Final checker on each deliverables Isometrics IFC drawings. Perform the necessary checking of specification parameters based on MHI Industrial Support standards sometimes correlates with Conventional Type of pipe Support. Coordinate with respective designers for comments lately clearing or incorporate comments from client specification and standards. Adopt measures in piping knowhow in power plant piping mostly hangers and Spring supports. Final check as per Piping Linelist parameters.

Mitsubishi Heavy Industries Asia Pacific Pte. Ltd.

5th floor Republic Glass Bldg. Legaspi Village Makati City 1229

POSITION : Piping Designer 3 /Checker

DATE : January 01, 2014 to September 15, 2015

PROJECT INVOLVED : NORTH ATLANTIC GROWTH Project

Polyethylene plant, Baytown Texas

Duties & Responsibilities:

Worked as Team Leader and Coordinator for Civil Group Pipe Support Structure, Underground Trench and Drainage System and Pavement modelling. Implement Job Instruction and Technical memo for civil scope piping related work and design. Supply necessary datas for field possible draining system, water recoveries, invert elevations for underground process piping, Trench Layout for piping, cables and underground power lines. Foundation Layout on both Equipment and pipe Supports, Pipebridge and Piperack modelling. Supports on Piping and Equipment around Polymerization Reactor. Emergency fire escapes and Fire Dome Clearances. Routing for Firewater lines. Penetration Layouts on both walls and Flooring. Foundation and Pipe support layout for pave elevations. Safety shower Layouts. Maintenance and Operation Accessways 3D modelling.

J&S Eng’g. Consultancy Services Co. Incorporated

3rd flr. Republic Glass Bldg. Makati City 1229

POSITION : Piping Designer 2 /Checker

DATE : February 06, 2012 to December 31, 2013

PROJECT INVOLVED : TARTASTAN AMMONI FERTILIZER

Ammonia and Urea Plant Tartastan, Russia

Duties & Responsibilities:

Trained for SP3d Software familiarization and skills for Piping Model applications and to do 3D Equipment Modelling, Support modelling. Tasked as to involved in modelling of Equipment and machineries, Structural Temporary model, Foundation of both Equipment and Piping Support Structures. Model Equipment by Engineering Data sheet from Pre to AFC. Squad checking for Final input then lately for interfacing with piping models for final review. Layout modelling for Ducting along Granulation Areas, Operation and Maintenance Accessways. No Go zone and Fire Domes. Piperack modelling, preparations for both Penetration and foundation Layouts. Final Squad checking of Vendor data sheets for equipment model. Coordinate with piping group for final nozzle connection.

Saham AL ShamaL Engineering Consultants

10th St. cor. Dammam road Al Khobar, Kingdom of Saudi Arabia

POSITION : Mechanical Piping Designer

DATE : November 26, 2010 to January 18, 2012 [ Emergency Exit ]

PROJECT INVOLVED : AL Quarayyah Power Plant Upgrade

Babcock Borsig Service Arabia Ltd.

Upgrading for their Twin cycle Gas plants.

Page 4 – Resume

Duties & Responsibilities:

Upgrading for the Twin Natural Gas and Diesel Cycle Power plants under Babcock Borsig pilot project. Involved in Site inspection, Study and piping Route Layout for the Fuel oil Supply. Air Heater Steam Cleaning. Sootblower by the application of Prosonix InLine direct Steam heater System. Responsible for studies, routing of additional piping of the said system on the four (4) existing units. Discuss with both clients and Sceco operations engineers. All of the said are done with the aid of Autocadd, microstation And I-rasB raster planning design.

Dispatch Onsite Service : Piping Design Engineer

Dhahran District Cooling Project (DHCP)

SINOPEC CHEMICAL, K.S.A.

Duties & Responsibilities:

Responsible for the preparation of piping layout and detailed design for the construction of the countries first chilled water cooling system of Aramco Dhahran District Head Offices. Piping routing by Invert Elevation Method applied to this kind of piping flexibility. Recommend analyze Material Specifications by Aramco piping Standards. Inspection for site construction and coordinated with main Aramco contractor SNC-Lavalin. Had undergone various Valve Box design for different Site Interface. Prepare information drawings for platforms operating stages, access ladders and Finally design for detailed informations of Low point Drains and High point Vents. Done with the aid of Autocadd Softwares.

Malaysian Marine and Heavy Engineering Sdn. Bhd.

PLO 3 Jalan Pekeliling, Pasir Gudang Johor, Malaysia

POSITION : Piping Design Engineer

DATE : October 20, 2008 to April 12, 2010

PROJECT INVOLVED : GUMUSUT KAKAP FPS Project, Sabah

(Offshore) Deepwater Semi-Submersible Project

Duties & Responsibilities:

Worked for the preparation of Approved for Construction extracted isometrics into Issued for Construction fabrication isometric drawings. Perform the necessary checking of specification parameters, pipe routing clash check, P and ID compliance for all pipe components, Line spooling and Tag, pipe-cuts verification, weld joints and weld maps (dia. inch. computations), ensure considerations for process and hydro test vent and drains. Pwht for Stress Lines, incorporate and modify pipe support as per client standards. Material Take Off check as per Mesc and Pms standard, Quantity and weight check. P & ID color mapping check, critical Linelist check, Back checking and Revision-up, iso-Tracking and monitoring of Hold items both for in-Line vendor data and equipments. Monitor Identified affected Lines by DCN’s and release as per Master Hold Register, verify changes due to vendor data incorporation or design modification on marked up red-lines. Coordinate with project management team group for constructability procedures and transportation of fabricated spools. Adopt necessary revision on fabrication procedure as per client request.

J&S Eng’g. Consultancy Services Co. Incorporated

6th floor MGF Champaca Bldg. Legaspi village Makati City 1220

POSITION : Piping CAD Designer

DATE : February 02, 2005 to October 15, 2008

PROJECT INVOLVED : SINGAPORE CHEMICAL PARALLEL TRAIN 2

SPOX/SPE-2 & 3, MITSUBISHI HEAVY INDUSTRY

EXXONMOBILE CHEMICAL ASIA PACIFIC, Singapore

Page 5 – Resume

Duties & Responsibilities:

Do the preparation of piping arrangement layout and detailed design based on P&ID along Polymerization process, Purge and Seed bin Areas. Prepare studies, Checking Equipment layout and installation levels, nozzle orientation and elevation, Pipe support and Special support type and detail. Produce Isometric drawings for stress analysis on both Reactor and Compressor. Coordinate to other partition and to other discipline for interfacing. Incorporate modifications of support and or routing as per stress calculation. Prepare information drawings for platforms operating stages, escape ladders and access on Equipment structures. Generate extracted Isometric’s. Perform self-checking and back check of Isometric drawings as per P&ID and linelist. Handles 2D drawing plan by converting PDS isometrics & models to general arrangements, Done with the aid of Microstation, Intergraph Smart pipe review and Plant Design System.

RAS LAFFAN NATURAL GAS

CHIYODA TECHNIP JOINT VENTURE

(Onshore) Expansion Project Ph.2, Qatar

Duties & Responsibilities:

Prepare and analyze P&ID for Test Block Diagram on both large and small bore piping line as referred to different fluid pressure on Line list Data. All works done using microstation version 7.1 Microsoft Office Excel 2007 for tabulated reports.

AL KHALEEJ GAS PROJECT PHASE 2

EXXON MOBILE MIDDLE EAST GAS LTD./

CHIYODA TECHNIP JOINT VENTURE

Ras Gas Onshore Expansion project phase2, Qatar

Duties & Responsibilities:

Assigned as part of a group to perform Piping Stress Analysis Calculations for area 162 & part of area 169. To do the task for preparation of Line conditions of every line of medium and large bore pipings. Calculations of nozzle movements and expansion loops, different Thermal conditions including upon installations and operations. Hydrostatic and Seismic Flexural analysis. Lately piping isometric stress modeling using Autopipe 2004, all work done with the aid of PC-cook of Chioyoda Data software. Details for special pipe supports, and finally participated in determining Piping Stress Analysis using Autopipe Version 6.30.11

OMAN SOHAR FERTILIZER Project

MITSUBISHI HEAVY INDUSTRIES

UREA AND AMMONIA PLANT, Oman

Duties & Responsibilities:

Preparation drawings of General plant Layout of piperack and sleepers on farm utility lines for Train 1 & 2, involved in task for all 2D drawing such as general piping arrangement, information drawings for embedded plates for both equipment and structure, equipment nozzle orientation for tanks and vessels, general information drawings for platforms, ladders and stairs, penetration hole. Performed piping layout for utility storage lines, utility hose stations and Tie-in’s on piperack, Do studies for final elevation of Vent lines to flare stack, Fire hose stations and hosereel locations for Ammonia storage tanks, safety showers and Fire dome in firefighting, maintenance and emergency accessways. Involved in design for special pipe supports, details of support and finally participated in preparation of extracted isometrics in determining Piping Stress Lines using Cad dxf files.

ETHYLENE PLANT 2 RECOVERY

CTCI/JAPAN GAS CORPORATION PROJECT

QAPCO PETROCHEMICALS, Qatar

Duties & Responsibilities:

Responsible in preparation of information drawings of Support Foundation for both concrete & graveled areas of Sulfur recovery, information detailed drawings for Platforms and Operating stages, Ladders and Access on piperacks, trench locations and tie-in points. Detailing for support and Special support. Done with the aid of Intergraph Smart pipe review and Plant Design System and Microstation 7.1 Java.

Page 6 – Resume

NON-RELATED TECHNICAL OR ENGINEERING JOB

POSITION : Truck, Ccommuter Van, General Administration (Expats) DRIVER

DATE : January 10, 2000 to February 01, 2005

ENVIRONMENT ASSOCIATED RESOURCES INC.

5th floor Estuar Bldg. Diliman, Qezon City

POSITION : AutoCad Designer (Mechanical, Stuctural)

DATE : January 01, 1997 to December 30, 1999

PROJECT INVOLVED : 1,300 Mtpd. SULFURIC ACID PLANT

MONSANTO ENVIRO-CHEM PROJECT

PHILIPPNE PHOSPHATE INCORPORATION Isabel, Leyte

DIVERSIFIED PLASTIC FILM SYSTEM INC.

Limay, Bataan

Duties & Responsibilities:

Do the task in preparation 2D drawing of General Plant Layout (farmland). Was involved in piping routing and layout. Took part in design drawing of piperack, supports, cable tray and trenches. Orientations for nozzles on vessels, storage tanks, manholes, melting pits, ducting connection. Performed piping layout from berth of unloading point into storage tanks with steam and condensate tracing. Presentation drawing for Isometric fabrication, steamblow drawing and details for final approval. Do preparation and tender drawings for instrumentation control and flow diagram. Do the task in keeping the data of pipe schedule using Microsoft access. Lastly involved for structural details of pipebridge, expansion loops and accessways.

RED SEA HOUSING COMPANY LIMITED

Al Rashied highway Jubail, Kingdom of Saudi Arabia

POSITION : Designer Draftsman/Cad Operator

DATE : November 10, 1994 to October 15, 1996

PROJECT INVOLVED : Various Projects in Middle East, Africa and Russia

Sitemaster FabricationYard in AL Jubail and Jeddah, K.S.A.

Duties & Responsibilities:

Serves as Engineering Technical Staff, Cost Estimator, Architectural Designer. Prepare drawing of Flooring layouts for proper adjoining points of floor frames, layouts for foundation stacking and details. Specifies material according to company standards. Took part for material take-off, electrical and plumbing layout on every Portable Cabin built. Monitoring and assisting every department head during fabrication within the factory.

.

M.E.I. CONSULTANTS Philippines Inc.

21st Floor. HSBC Bldg. Pasig City

POSITION : Mechanical/Structural Design Draftsman

DATE : May15, 1993 to October 31, 1994

PROJECT INVOLVED : 300 MTPD SULFURIC ACID PLANT

MONSANTO ENVIRO-CHEM Technology Transfer

CHEMICAL INDUSTRIES OF THE PHILIPPINES, Bo. Kalawaan Pasig

Duties & Responsibilities:

Drafting of Tender drawing of General Plant Layout for presentation and approval for documentation. Preparation of site development clearing and demolition plan, finalized equipment and Vessels location plan. Conceptual design for 2-storey Control and Office building maximizing the use of limited space. Took part for the design of (34.5 Kva.) Indoor Sub station and House for 3.5 Megawatt Steam Turbo-Generator and Condenser.

Involved in Structural Building Frame Analysis including earthquake and Super-imposed Loads with the use of Interactive Structural Analysis Software.

Page 7– Resume

ADDITIONAL INFORMATION:

(Spouse Name) : MAYOLYN UY TOLENTINO

(No. of Children) : Four (4)

(Passport No.) : P8443891A

(Valid until) : August 21, 2028

Language Spoken : English and Filipino (Tagalog)

REFERENCES : : Engr: Arnel Salcedo

Project Lead Coordinator

Mitsubishi Heavy Industries Asia Pacific Pte. Ltd.

+639********* adfwys@r.postjobfree.com

: Engr: Joime DelaCruz

Project Team Leader

Fluor Daniel Incorporation, Philippines

+639********* adfwys@r.postjobfree.com

: Engr: Deonald Perez

Team Lead Designer

Fluor Daniel Incorporation, Philippines

+639********* adfwys@r.postjobfree.com

: Engr: Luis II Claudio

Senior Piping Designer

Worley Parsons Arabia Limited

+639********* adfwys@r.postjobfree.com

: Mr. Warren G. Micu

CSI-supervisor

Meinhardt Philippines Incorporated

+639********* adfwys@r.postjobfree.com



Contact this candidate