RAVI KIRAN VADDI
INSTRUMENTATION
POST DIPLOMA & DIPLOMA IN INSTRUMENTATION
Work Experience: 16+ Years
EXPERIENCE
EDUCATION
CORE SKILLS
**** – 2005
Post Diploma in Instrument Technology
Jawaharlal Nehru Govt. Institute of Post
Diploma courses in Engineering & Technology,
Hyderabad in the year 2003-2005 with an
aggregate of 71.99%
Diploma in Electronics & Instrumentation
Sri YVS & BRM Memorial Polytechnic,
Mukteswaram in the year 1998-2001 with an
aggregate of 61.34%
Contact Details
**************@*****.***
Visakhapatnam
Objective
To attain a position of excellence in
instrumentation field where my skills shall
be well utilized and where my
performance increases the productivity to
intrurn achieve a rewarding career for
the benefit of the self and the
organization.
Career Summary
** Having more than 15+ years of
Experience in serving the prestigious
organizaiotns performing the diversify
roles in Planning & Execution of
Instrumentation activities.
** Expertise in Calibration, Exectution
and commissioning of all Field
instruments such as Guages,
Transmitters, Safety Vaves, Control
Vallves and major cable tray and cable
laying glanding, terminations works,
Junction Box, Air Manifold Installations
its tubing works, Instrument piping,
Control room Panel Installations, skid
commissioning, specialised instrument
installations, loop checking, etc., with
precision and utmost quality for gaining
customer satisfaction.
** Planning is the key for achievement
in all my projects, well planned site
exectuiton with proper documentations
such as Location layouts, cable
schedules, P&ID, Instrument index, hook
ups, 3D architecture for planning of
installations for avoiding reinstallations.
** A highly responsible, insightful,
determined and enthusiastic quick learner
who possesses a considerable amount
of knowledge and experience in
Instrumentation.
Project Execution
Project planning
Internal Auditor
Store Management
ISO Documentation
Leadership Skills
Computer Skills
Commissioning
May’2014 - Present Essar Vizag Terminals Ltd.
Deputy Manger Operations and Automation Projects
Apr’2012 - Apr’2014 Mangalore Aromatic Complex, OMPL PMC Engineer Instrumentation with M/s Toyo Engg.
May’2011 - Apr’2012 Mangalore Refinery & Petrochemicals Ltd Lead Engineer Instrumentation with M/s L&T
Apr’2010 - May’2011 Guru Gobind Singh Refinery Project. Engineer Instrumentation with M/s L&T
Mar’2010 Hindustan Zinc Ltd, Dariba, Rajasthan
Commissioning Engineer – Inst. with M/s L&T
Dec’2009 - Feb’2010 Barmer-Salaya Pipeline Project. Engineer - Instrumentation with M/s L&T
July’2006 - Nov’2009 Jamnagar Export Refinery project. Planning Engineer - Instrumentation with M/s L&T
Dec’2005 - May’2006 Flash Forge Industries, Vizag
Supervisor
May’2001 - Oct’2003 HPCL, Vizag
Supervisor
Professional Achievements
Awarded “ANNUAL QUALITY
TROPHY” as a member of JERP
Project Team for the Year 2006-
2007 from Larsen & Toubro Ltd.
Awarded “INTERNAL AUDITOR
CERTIFICATE” against ISO 9000-
2000 Series Training Course on
Internal Auditing of Quality
Management Systems in the year
2007 from Larsen & Toubro Ltd.
Awarded “BEST SAFETY
CONSCIOUS ENGINEER” for
maintaining high standards of safety
implementation for the month of
Sept’07 from Larsen & Toubro Ltd.
Awarded “APPRECIATION
CERTIFICATE” as a Best Slogan
Writer for Quality week Celebrations
conducted in the Year 2008 from
Larsen & Toubro Ltd.
Awarded 2nd Prize as a “BEST
SLOGAN WRITER” for Safety Month
Celebrations conducted in the Year
2011 from Larsen & Toubro Ltd.
Participated in T20 Cricket
Tournament conducted by PT&D IC,
Larsen & Toubro Ltd (Delhi Region)
and won the series.
Awarded “BEST SLOGAN WRITER”
for Safety Month Celebrations
conducted in the Year 2016 from
Essar Vizag Terminals Ltd.
Project Work
Company : Coromandel Fertilizers
Ltd., Visakhapatnam, AP
Title : BOILER PARAMETER
CONTROL using PID Controllers.
Duration : 6 Months
Project Description :
Boiler is a closed vessel in
which given fluid is heated and
evaporated. The main function is to
convert water into steam at required
temperature. The basic elements are
described in this project.
PID stands for Proportional Integral &
Derivative. These controllers are
designed to eliminate continuous
operator attention. PID Controllers are
designed to automatically control a
process like flow, temperature, pressure.
Controller does this by changing
process input so that process output
agrees with desired result.
Professional Exposure:
16+ years of efficient and meticulous professional experience in the Project planning, execution & commissioning (both grass root & brown field projects).
Plant Operations, Up gradation of a brown field project without hampering plant operations.
Project Planning, Execution, Reconciliation, ISO Documentation, Pre- commissioning & Commissioning.
Inspection/Witnessing calibration of all types of valves, gauges & transmitters (HART/FF)
Co-ordination with vendor representatives for special Instruments /system checking/commissioning.
Fair knowledge of instrumentation design deliverables like JB & cable schedules, specs & datasheets, P&ID, Hook up & Location drawings
Sound knowledge in calibration, erection of all instrument hardware’s, hydro/pneumatic testing, loop checking, testing and commissioning of complete Field Instrumentation and Control System.
Adhere to quality control standards resulting consistent positive feedback from customers.
Run statistical analyses to project material costs, required man-hours and environmental impact.
Complete tasks ahead of deadlines to ensure the successful and timely resolution & to create financial estimates for clients, approximating cost of labour and materials necessary to complete projects. Career Summary
Essar Vizag Terminals Ltd: (Project Up-gradation & Operations) Automation Project Planning:
Discussions with Essar Engineering over design and field compatibility.
Discussions with Vendors/ Contractors for procurement & erection jobs
Discussions with Major vendors like ABB, Honeywell, Sandvik, Elecon, L&T, Ecodea, Essar Heavy Engineering for jobs on LOT basis.
Achieving the above targets with timely response and ease of erection
& commissioning & Documentation for the entire project. Automation Project Execution:
Up-gradation of a Relay based control system which has been modernized to PLC based automation with central control and monitoring system including up gradation of all old equipment to new equipment like Reclaimers, Stackers, Ship loader & Tipplers and developing all safety & monitoring systems for cargo handling. All relay based panels are replaced with Honeywell ML 200 PLC system inter connecting RIO panels at each electrical houses through dual redundant Fiber optic communication. Cable Laying from MCC & field to RIO panels & Commissioning Project monitoring for major jobs like Erection and Commissioning of 132kV MRSS, HT Switchboards and Dust suppression system.
Plant Operations:
Operating the 9kms conveyor system which includes RIO Cabins in each Electrical house on a SCADA platform based on a Honeywel ML-200 PLC system, achieving 90,000-1,00,000 Tons of shipment per day ensuring system healthiness and operating the SCADA system without causing operational delays with all related documentation, MIS Reporting, System maintenance. Etc.
SYNOPSIS
IT & Computer Literature
Window & OS
MS Office Proficiency
Email & Internet
SAP & Primevera
Languages [Read // Write // Speak]
English
Hindi
Telugu
Passport Details
Passport No. :
Date of Expiry :
Issuing Authority:
Personal Information
Father : Kubereswar Rao Vaddi (Late)
Mother : Maheswari Vaddi (Home maker)
Sister : Indumathi Vaddi
(Dy. Mgr., Axis Bank, Vizag)
Spouse : Divya Vaddi
(Dental Surgeon - Periodontics)
Child : Shanvi Kiran Vaddi
(Kindergarten)
DOB : 30-06-1983
Address: 10-33E, SF 201, Sai Bharadwaj
Apts., Visalakshi Nagar, Visakhapatnam,
Andhra Pradesh, India.
Declaration
I hereby assure that the above
information furnished by me is true &
correct to the best of my knowledge &
belief. I hope that the above mentioned
particulars will meet your requirements
and if given a chance to prove myself,
I assure you that I will do the best to
fulfill company’s objectives.
Yours Truly,
Ravi Kiran Vaddi
Additional Responsibilities:
Coordination with Government authorities like APEPDCL, APTRANSCO, APSLDC, CEIG for obtaining statutory clearances/ NOC/ approvals for Regular Power Purchase from Indian Energy Exchange.
Availing Project up-gradation and commissioning certification from Independent Engineer - Mecon Ltd.
Toyo Engineering India Ltd (PMC) :
At Mangalore Aromatic Complex as a PMC Engineer coordinating with all major contractors like L&T, GDCL, Thermax - CPP, Vatech Wabag
- DM Plant, Doshion Veolia Water Solutions - RWTP, Gactel Trunkey Projects – Cooling Tower, Hindustan Dorr Oliver - ETP, Airoil Flare gas. Hence major roles are to coordinate with all construction & commissioning activities with respect to project planning, execution, project quality and safety, documentation, resolving issues related to design w.r.t execution, material coordination & IMIR clearance to various vendors, billing of all subcontractors & vendors. PSV and Control valve calibration task, Verifying system formats and generating punchlists for liquidation and hence ensuring system completions. Larsen & Toubro Ltd :
Execution:
As a Lead Engineer, Planning engineer and Execution engineer handling a team of engineers providing necessary support in planning, material management, site execution and all closing formalities. Monitoring progress vs. planned target and discussing necessary steps to be taken to achieve the target, client coordination and safe & quality working procedures.
Installation & commissioning of special instruments like Ultrasonic Flow meters, Skin type Thermo-couple, Guided Wave Radar type level transmitter (ROSEMOUNT 5300 SERIES), Magnetic Flow meter, Thermal mass Flow meter, Nucleonic type level transmitter and all other Pressure, Flow and temperature instruments etc.
Calibration & commissioning of control valves, on-off valves, PSV’s, solenoid valves and limit switches.
Piping, Tubing and welding including preparation of quality documents like Fit up reports, weld visual, RT reports, hydro & pneumatic test report
Involved in quality jobs like inspecting weld visual, NDT, Fit-up, hydro test, pneumatic test, leak test.
Preparation of ITP, Loop checking, Logic Checks, Pre-Commissioning
& Commissioning of Field Instruments and Package Instruments cable laying, glanding terminations b/w Field to DCS. Open & Closed Loop Checking from Field to DCS/PLC. Coordinating with consultant, client, vendors and contractors for various design & execution related issues and resolving the same for the successful execution of the project. Planning:
Planning activities for Instrumentation works such as scheduling, monitoring & controlling of project progress, estimation of material, manpower & machinery requirements, arrangement of material at peak, generating MIS Reports, budget preparation, preparation of client & subcontractor billing and material reconciliations for all the project consumables including returnable & non-returnable items. Site closing activities such as preparation of final bills, debit notes, releasing of P&M, demobilization of staff & workmen.