Post Job Free
Sign in

Engineer Process

Location:
Khobar, Eastern, Saudi Arabia
Posted:
September 07, 2020

Contact this candidate

Resume:

RESUME OF SENIOR PROCESS ENGINEER - TRANSFERABLE IQAMA

Career

Objective:

Seeking a dynamic career in an esteemed organization that provides many opportunities for professional development and exposure to new technologies.

Professional

Experience:

Having 18 years working knowledge in “Senior Process Engineering & Advance Process Control Systems” in the leading engineering and construction organizations with depth knowledge of unit operations and production management of chemical, petrochemical, oil and industrial gases plant.

Technical Accomplishment:

Handled Project concerned with Product Distribution & Associated Utilities i.e Drainage System, Storage, Loading and Unloading Facilities at Port

Handled Project Fire Fighting System of Industrial Multi-Complex.

Handled project for modification, additions, expansion and increase in the capacity of existed Industrial Gas Plant.

Handled Shutdown Unit of chemical, Petrochemical oil and industrial gas Plant.

Updated Project Proposals by Comparing & Scrutiny of Feed Package with Process Proposal Checklist, detected errors, mistakes marked and recommended for rectifications or revisions Process of Proposals Documents.

Process Operation involved handling equipments of Chemical, Petrochemical and Industrial Gas Plant.

KBR (EPC), SAUDI ARABIA.

Working: from 06-Feb 2019 – Till Present

Job Responsibilities : “Senior Process Engineer”

Job Responsibilities:

Prepared PFD, P&ID, Line List, Equipment List, Design Basis, Cause and effect, Control Philosophy.

Performed Hydraulic Calculation.

Sizing of Pipeline for Fire water.

Sizing of Storage Tank, Vessel.

Sizing of Pump (Fire Water, Submersible, Positive Displacement).

Sizing of Sanitary Lift Station.

Calculated Man-hour and updated Deliverables.

Projects: Detailed Design

i)Rastanura Project : Lead Process Engineer

Objective: Replace Control System.

ii)SATORP Project : Senior Process Engineer

Objective: Refinery Debottlenecking.

iii)Rastanura Project : Lead Process Engineer

Objective: Increase East-West pipeline.

iv)Abqaiq Project : Lead Process Engineer

Objective: Upgrade of Existing Firewater System.

v)Qatif Project : Lead Process Engineer

Objective: Install Additional Fire Water tank.

vi)Rastanura Project : Lead Process Engineer

Objective: Upgrade of Seven (7) Sanitary Lift Station.

vii)Haradh Tinat GGM Project : Lead Process Engineer

Objective: Installation of Purge gas Liquid Recovery system.

viii)Marjan Project : Lead Process Engineer

Objective: Upgrade of Slop pump system.

ix)Safaniya Project : Lead Process Engineer

Objective: Upgrade of Deluge piping system.

x)Dammam Project : Senior Process Engineer

Objective: Dammam Crude and Gas Development

SNC LAVALIN (EPC), SAUDI ARABIA.

Working: from 12-May 2013 – 05-Feb-2019

Job Responsibilities : “Senior Process Engineer”

Job Responsibilities:

Prepared PFD, P&ID, Line List & Equipment List.

Prepared Design Basis & Process Philosophies (Operation, Vent & Depressurizing, Isolation, Shutdown, Drainage, Fire Water etc).

Performed Mass & Heat Balance Calculation and Hydraulic Calculation.

Performed Process Design, Sizing Circulating Pumps.

Sizing of Pipeline for Fire water, Nitrogen and Portable Water.

Sizing of Water Treatment Package.

Sizing of Odor Control System.

Sizing of Storage Tank.

Sizing of Pump (Fire Water, Irrigation Water and Potable Water).

Sizing of Submersible Pump (Sanitary & Borewell).

Prepare Utility summary.

Prepare Process Datasheet for Cartridge Filter.

Prepare Process Datasheet for Diaphragm Pump.

Performed Design of Vapour Recovery System.

Participating in Waste Water Treatment – HAZOP

Calculated Man-hour and updated Deliverables.

Performed with Process Simulation Software HYSYS

Performed other Calculation by using AFT FATHOM and AFT ARROW Software.

Projects: Detailed Design

i)SYSTEM – B, ARAMCO Project : Senior Process Engineer

Objective: Design of Potable Water Distribution System, Irrigation Water Distribution System, Fire Water System, Oily Water System, Sanitary System, Borewell System, Water Treatment Package and Odor Control System.

ii)SHARQ Project : Lead Process Engineer

Objective: Basic Engineering Service for installation of Guard Filter & Moisture Analyzer at Vent Gas Recovery Unit in PE-1 and PE-2.

iii)S-Chem Project : Lead Process Engineer

Objective: Engineering Service for installing additional Blower to Port Flare.

iv)Al-Khafji Project : Lead Process Engineer

Objective: Design of Fire Water Storage and Distribution.

v)Al-Khafji Project : Lead Process Engineer

Objective: Design of Nitrogen Package and Distribution.

vi)Al-Khafji Project : Lead Process Engineer

Objective: Waste Water Treatment – HAZOP

vii)Al-Khafji Project : Lead Process Engineer

Objective: Installation of New Diaphragm Pumps to transfer Corrosion Inhibitor to Storage Tank.

viii)Al-Khafji Project : Lead Process Engineer

Objective: Installation of Fresh Water Pump for Ratawi Facilities.

ix)BAM International, Jordan Project : Process Engineer

Objective: Aqaba New Liquefied Natural Gas (LNG) Terminal – HAZOP

x)Qatar Petroleum – Vapour Recovery System : Process Engineer

Objective: Design of Dock Safety Unit and VRS for Naphtha, Condensate and Crude Oil, Fire Water System.

xi)Air Liquid Arabia LLC (ALAR): Process Engineer

Objective: Detail Engineering Package (DEP) for Jubail Hydrogen line.

Projects: Feed Design

i)SHARQ Project : Lead Process Engineer

Objective: Basic Engineering Services / Feed for Vent Gas Recovery (VGR)Unit for Ployethylene.

ii)SASREF – Vapour Recovery System : Process Engineer

Objective: Design of Fire Water System.

iii)PETROKEMYA Project : Process Engineer

Objective: Engineering Study for Instrument Air System

Proposal:

i)TASNEE : Process Engineer

Objective:

a)Design of Vent Line from all cooling water and seawater pump to be extended to ground level.

b)Design of Nitrogen Line to the hot oil tank

c)Design of Catalyst Nozzle and RAM Type Valve in all Reactor

d)Design of Vent Line from all cooling water and seawater pump to be extended to ground level.

e)Design of High Point Vents in CW Supply/Return near UTOS Air Compressor and extended to floor level.

f)Design of 2" Pipe Spool from the bottom of heavy Oil Drum with Heat Tracing and Steam Flushing provision.

g)Design of Drain Line, Sizes from 1.5” to 4” for Reactor 2 & 3.

h)Replacement of Piping Specification for DM Water Unit.

i)Providing an Electrical Tracing on FA-7001 bottom portion (50%) on each Chamber.

j)Provision of Gas Detector and Flame Detector in C2 & C3 Compressor Shelter.

k)Provision of Gas Detector and Flame Detector in CGC Compressor Shelter.

l)Provide Corrosion Coupon at Quench Lower Loop and Process Steam.

m)Automation of Amine Dosing to Quench Wash Water Loop for pH Control.

n)To Install Additional 6 Moisture Water Trap in Blending and Transfer System.

ii) Air Liquid Arabia LLC (ALAR): Process Engineer

Objective:

a)DEP for Jubail Hydrogen Line - 3 Inch tie in on existing Hydrogen Pipeline inside FARABI.

b)DEP for Jubail Hydrogen Line – PTC, SADARA and PLASCHEM .

c)DEP for Jubail Hydrogen Line – APC.

iii)Al-Khafji (KJO) : Process Engineer

Objective: Modification to avoid Slug Flow of Condensate Liquid and Accumulation into the Gas Scrubber.

iv)Petrokemya (SABIC) : Process Engineer

Objective: Engineering study for Instrument Air System.

v)Maaden Phosphate Company : Process Engineer

Objective: Expansion of FireWater Line from PC Al Jalamid Plant area to the MPC and Contractor Camps.

FLUOR ARABIA LIMITED (EPC), SAUDI ARABIA.

Working: from October 2011 – April 2013

Job Responsibilities: Process Engineer

Job Responsibilities:

Prepared PFD, P&ID, Line List & Equipment List.

Prepared Design Basis & Process Philosophies (Operation, Shutdown, Drainage etc).

Performed Mass & Heat Balance Calculation and Hydraulic Calculation.

Performed Process Design, Sizing and Selection of equipments i.e. Storage Tank, Loading & Circulating

Pumps, Filters, Sump, Scraper Launcher & Receiver.

Sizing of Pipeline for Fire water, Nitrogen and Portable Water.

Sizing & Selection of Control Valves, Pressure Safety Valves, Flow Element and Restriction Orifice.

Performed Design of Vapour Recovery System and Flare System.

Prepared Technical Datasheet for equipments and instruments using and applying international standards and codes (API, NFPA, ASME, ANSI, ASTM).

Performed with Process Simulation Software HYSYS

Performed other Calculation by using AFT FATHOM and INSTRUCAL Software.

Preparing reports and studies for client.

Partiticipated in P&ID Review.

Projects: Detailed Design

i)MA’ADEN Project (Ma’aden Aluminum Project Mine and Refinery) : Process Engineer

Objective: Design of Process water System, Potable Water System and Chiller System (Area 6500), Cooling Water (Area 6600), Sanitary Waste Lift Station (Area 1124) & Natural Gas (Area 6900).

ii)SADARA – Port Facilities & Hybrid Loading & Unloading System : Process Engineer

Objective: Design of Port Storage & Product Distribution for POLYOL, Nitrogen Distribution System, Potable Water Distribution & Safety Shower System.

SAMSUNG ENGINEERING SAUDI ARABIAN (EPC), SAUDI ARABIA.

Working: from December 2008 – September 2011

Job Responsibilities: Process Engineer

Additional Job Responsibilities : Designated As: “Lead Process Engineer”

Handled Projects & Updated Project Proposals:

Job Responsibilities:

Prepared PFD, P&ID, Line List & Equipment List.

Performed Mass & Heat Balance Calculation and Hydraulic Calculation.

Performed Process Design, Sizing and Selection of equipments i.e. Storage Tank, Pumps, Filters, Vertical & Horizontal Vessel.,

Performed with Process Simulation Software HYSYS.

Sizing & Selection of Control Valves, Pressure Safety Valves, Flow Element and Restriction Orifice.

Compared & Scrutinized Process Feed Package with Process Proposal Checklist and detected errors / mistakes marked and recommended for rectification or revisions of PFD & P&ID, Equipments and Instruments Datasheets, Line & Equipments Lists, Prepared Additional Requirement List by referring Process Proposal Checklist & Design Notes.

Prepared technical clarification list and Sizing Technical Data sheets for Equipments and Instruments and applied

International Standards & Codes viz API, NFPA, ASME, ANSI and ASTM respectively

Preparation of Temperature Gauge & Level Gauge Datasheets.

Performed Sizing of Heat Exchanger Datasheet by using Software HTFS.

Performed Sizing of Flare Header by using Flarenet Software

Scrutinized Piping Specialty (PSV, Strainer, Hose) Data sheet

Scrutinized Storage Sphere Tank, Refrigeration Unit Package Data sheets and Loading Arm Data sheets.

Scrutinized Metering Skid Datasheet for MBTE & Methanol and Prepared Process description documents.

Calculated Man-hour and updated the Deliverables.

Presentation made in all disciplines

Projects: Detailed Design

i)CO2 Compression & Injection Facilities (Saudi Aramco): Process Engineer

Objective: This Project will compress and dry Carbon Dioxide (CO2) from Hawiyah NGL Recovery Plant, Then transport the gas to the Uthamiyah area of the Ghawar Field for injection processing of the resultant enhanced oil Recovery fluid will be in Uthmaniyah GOSP 7.

ii)Wasit Co-Generation: Process Engineer

Objective: Cogeneration Plant include Boiler Feed Water, Steam & Condensate.

Proposals:

i)Karan Gas Facilities (Saudi Aramco): Process Engineer

Objective: Design of Acid Gas Removal & Acid Gas Enrichment Unit: (Applied Aramco Standards to Project Proposal)

ii)LTRS-1 Off Gas Recovery Unit (Ibn Zshr-SABIC): Lead Process Engineer

Objective: Design Low Temperature & Recovery System (LTRS-1) Off Gas: Applied SABIC Standard to Project Proposal

iii)Yanbu Export Refinery Project (YERP): Process Engineer

Objective: Design of Sulfur Recovery Unit (141) – (Applied Aramco standards to Project Proposal)

iv)Kemya U&O Revamp for Kemya Rubber Plant (Kemya – SABIC): Lead Process Engineer

Objective: Design of Kenya U&O Revamp for Kemya Rubber Plant: (Applied SABIC Standards)

v)WASIT– Natural Gas Liquid (NGL) Feed & Product (WASIT NGL – ARAMCO): Process Engineer

Objective: Set-up Natural Gas Liquid (NGL) Feed & Product – (Applied Aramco standards)

vi)SHAYBAH NGL Power Generation Plant (SHAYBAH Poser Generation Plant–ARAMCO): Lead Process Engineer

Objective: Design of Power Generation Plant for NGL & GOSP 4 By Using Combustion Gas Turbine.

SAUDI ARABIAN KENTZ COMPANY LTD, SAUDI ARABIA. (Period: From Nov 2005-Nov-2008)

Job Responsibilities : “Process Engineer”

Additional Job Responsibilities : Designated As: “Lead Process Engineer”

Job Responsibilities:

Prepared PFD, P&ID, Line List & Equipment List.

Prepared Design Basis & Process Philosophies (Operation, Shutdown, Drainage etc).

Performed Mass & Heat Balance Calculation and Hydraulic Calculation.

Performed Process Design, Sizing and Selection of equipments i.e. Storage Tank, Loading & Circulating

Pumps, Filters, Cooler, Scrubber Circulation Drum, Reinjection Pump, Slop Drum, Dike Area Sump, Condensers, Scraper Launcher & Receiver, Flare KO, Drum Flare Unit, Dock Safety Unit, Detonation Arrestor.

Sizing of Pipeline for Fire water, Foam, Storm Water, Nitrogen and Portable Water.

Sizing & Selection of Control Valves, Pressure Safety Valves, Flow Element and Restriction Orifice.

Performed Design of Vapour Recovery System and Flare System.

Prepared Technical Datasheet for equipments and instruments using and applying international standards and codes (API, NFPA, ASME, ANSI, ASTM).

Performed with Process Simulation Software HYSYS

Performed other Calculation by using AFT FATHOM,, HTFS and INSTRUCAL Software.

Performed Sizing of Heat Exchanger Datasheet by using Software HTFS.

Taking reference of process licensors, such as UOP, Stone & Webster, axens etc.

Preparing reports and studies for client.

Preparing associated deliverables in line with scope requirements and realistic project schedule.

Partiticipated HAZOP studies.

Projects : Feed Package and Detailed Design

i)Saudi International Petrochemical Company, AL-Khobar, KSA: Period: Process Engineer

Objective: To Set-Up the Port Storage & Product Distribution for Propylene, Styrene & Benzene and Associated Utilities.

ii)Jubail Chevron Philips (JPC) –J080: Process Engineer

Objective: To Set-Up Fire Fighting System / Drainage System.

iii)Gulf Farabi Petrochemical Company (GFPC) – J103: Lead Process Engineer

Objective: Design of Light Kerosene, Heavy Kerosene & Molex Raffiate Storage and Loading Facilities - Feed; Package & Detailed Engineering.

iv)KEMYA - Al Jubail Petrochemical Company: Lead Process Engineer

Objective: Design of LLDPE Sea Water Cooling Header Replacement - Feed Package.

v)Saudi International Petrochemical Company (SIPCHEM) - ESWA, AL-Khobar, KSA: Lead Process Engineer

Objective: Set-up Sea Water Supply & Return Lines. / Set-up Fire Water System / Set-up High Pressure Steam Instrument Air & Dematerialize Water Pipelines / Set-up Methanol Interconnecting feed System / Set-up Off-Plot Interconnecting Portable & Utility Water and Hydrogen Pipelines Connecting to BDO Plant / Feed & Detailed Engineering.

Process Designing, Operation / Modification, Addition Expansion & Shutdown Plant:

i)Six Sigma Gases India Pvt Ltd. New Mumbai. (Period: July 2004 - November 2005)

(Industrial Gases & Gas Mixtures Plant)

Clients: All over Maharashtra & Gujarat Industries

Objective: Operation & Modification. Addition, Expansion & Increase in Capacity of Existed Plant.

Job Responsibilities: “Senior Engineer” (Operations / Designing & Commissioning)

Prepared Conceptual, Basic & Detailed Process Engineering Design.

Installed process equipments viz CO2, Storage tank, pipes and pipefitting elements, pumps, compressors, etc.

Prepared gas mixture, loaded and unloaded industrial gases from Tankers to the CO2 Storage Tank and filled cylinders from the manifold.

ii)Anchor Allied Factory Ltd. Sharjha. (Period: May-2003-April 2004)

(Manufacturer of Industrial Chemicals i.e. Silicone, Acrylic and Gasket)

Objective: Operation, Maintenance & troubleshooting of process and operation problems:

Job Responsibilities: As a “Production Supervisor cum Lab Technician.

Mixing, heating, filling gel with nitrogen in the vacuum and purging /Used Parameters for regulating temperature, pressure and automatic filling of cartridges of industrial chemicals. Physical and chemical testing of raw materials and products for quality control. and troubleshooting problems of the process and operation.

iii) Carton Industrial Engineers, Tarapur.(Engineers Consultant & Contractor) Period: April 2002-March 2003.

Objective: Design of Oil and gas equipment, fabrication and inspection for quality control.

Job Responsibilities: “As a Engineer” (Equipment Design & Fabrication)

Designed & fabricated oil and gas equipments like ‘Burner Boom Assembly, boom section, piping, burner nozzle, ‘ pilot ignition system and swivel, in addition Casting of steel plats, guide plates, steel beams and lifting hooksbars, etc.

Prepared Process Datasheet for equipments such as pressure vessel, storage tank, heat exchanger, and separator as per Standards & codes viz API, NFPA, ASME, ANSI, ASTM respectively.

iv)Eastern Petroleum Pvt. Ltd. Kalamboli, Panvel: Period: July-1998-May-99 & August 2001-April-2002

Manufacturer of Industrial Lubricants (Petrochemical Plant)

Job Responsibilities: As a “Production Supervisor & Process Design Engineer.

Prepared basic & detailed process design for the shutdown industrial lubricant plant.

Prepared PFD, P&ID and Utility Diagram and Process Datasheet for equipments i.e heat exchanger, distillation

columns, cooling tower, condenser, pipefitting elements, pumps etc

Handled equipments for operation i.e distillation column, heat exchangers, reactor, evaporator, condenser, cooling

tower, drum dryer. In addition maintenance of the plant and process / operation trouble-shooting problems.

Qualifications:

B.E Chemical Engineering, University of Mumbai. 54.36%

Bharti Vidhyapeeth College of Engineering, Mumbai.

Diploma in Chemical Engineering, 60% (First Class)

Board of Technical Examinations, Maharashtra State, Mumbai.

Additional

Qualifications:

HYSYS Software (MAE 9001-2000) MIT, Pune: It is powerful software for simulation of chemical plant and oil refineries. It includes tools for simulation of chemical plant and oil refineries, estimation of physical properties and liquid-vapor phase equlibria, heat and material balances and simulation of many types of equipment.

HTFS+2006 Software: (Heat Exchanger Calculation software), HTFS+2006 software include a number of programs for thermal / mechanical design and drawing of heat exchangers and pressure vessels.

AFT Fathom Software: (Pressure Drop Software for Incompressible Flow), This software increases

the productivity to pipe flow combination of traditional Hydraulic & Pressure Drop Engineering Analysis with

Window Graphical User Interface (GUI)

AFT Arrow Software: (Pressure Drop Software for compressible Flow),

PIPENET: Hydraulic Calculation & Pressure Drop Calculation

INSTRUCALC Software: For Sizing, Calculations, Datasheet and also for AGA Orifice Plates,

ISO-Flow Elements, Relief Devices, Control Valve and Relief Valve.

Aspen Zyqad: PFD and Datasheet Preparation by using Simulation Software.

Aspen Flarenet : Flare Header Sizing Software

Piping Engineering, (Computer –Aided-Design Center), Mumbai.

Gained knowledge of computer aided design of piping, piping layout, isometric and stress analysis, etc.

Industrial Automation, Prolific Institute of Technologies, Mumbai.

Gained knowledge of DCS, PLC and SCADA for process and quality control of the product.

AUTO CAD: Apes Software Institute, Mumbai.

Gained knowledge of equipments design, piping isometric drawing, etc, dimension accuracy,

standard formats for labels, writing name, sheet numbers colouring pipes and equipments.

Softtech Computer Center: Mumbai.

Gained knowledge of computer operating systems, window-98, XP Professional, MS-Office, Excel, Power

Point, spreadsheet, Formatting and Management of official documents etc.

Rubber Technology: IRMA, Certified Organization-ISO 9001-2000, Mumbai.

Gained Knowledge about process / operation of the rubber products, and process equipment such as Extruder, Injection Molding Machine, Steam Boiler, etc. In addition chemical and physical testing of raw materials and rubber products for quality control.

Projects

Reports:

Manufacturing Calcium Petroleum Sulphonate.

Manufacturing Sodium Petroleum Sulphonate.

Personal

Data:

Full Name:

Age / Date of Birth

Status

Passport Details:

Correspondence address.

Phone:

Email:

HUSAIN SHAHID PARVEEZ

41 Years / 20-10-1978

Married

Passport No: Z4974134 & Date of Expire: 24/06/2028

Karishma Villa, Flat No 204,1st Rabodi Road, K’Villa, Thane (W)-400601

009**-********* / 009**-*********

*************@*******.***



Contact this candidate