Post Job Free
Sign in

Autocad Drfatsman

Location:
Abu Dhabi, United Arab Emirates
Salary:
5500
Posted:
September 06, 2020

Contact this candidate

Resume:

JAN MICHAEL M. PAPA

Flat *** Kitchen Haus Showroom Building,

Najda Street, Abu Dhabi, UAE

Mobile : 050-***-**** / 052-***-****

E-mail: *******@*****.***

CAREER OBJECTIVE

To be able to continue enhancing my knowledge and skills in the fields of engineering and architecture. And to be associated with an organization that will provide an assured career growth and maximum professional development for both. WORK EXPERIENCE

POSITION: Architectural Draftsman

PERIOD: June 10, 2020 to August 08, 2020

COMPANY: Duncan & Ross Management Consultancies

ADDRESS: Dubai - UAE

JOB DESCRIPTION:

Preparation and provision of Architectural Shop Drawings including revisions and As-Builts.

Provide detailed drawings i.e. joinery as needed by Client/Consultant. PROJECTS INVOLVED:

Tamm Factory: Construction, completion & Remedy of defects of fit-out – Abu Dhabi UAE

POSITION: Autocad Draftsman for Interior Fit-out

PERIOD: July 17, 2019 to Sep 22, 2019

COMPANY: Al Nasr International Co. L.L.C.

ADDRESS: Al Ain, U.A.E. P.O. Box 80977

JOB DESCRIPTION:

Providing assistance for Interior Designer and Engineers when it comes to design, materials and installations.

Preparation of detailed interior fit out shop drawings which includes elevations, sections and joineries.

Prepare As-Built drawing as per site conditions.

Prepare transmittals and drawing submissions.

Material research for interior materials and joineries.

Coordination of shop drawing issues with the client and main contractor and other trades for any discrepancies, revisions and additional or necessary information/s.

POSITION: Design Draftsman / Project Coordinator / Quantity Surveyor PERIOD: April 07, 2012 up to July 15, 2019

COMPANY: HAZ MARBLE Design Installation Consultants ADDRESS: Flat 202, 2nd

Floor, First Gulf Bank Building, Old Corniche Road, Abu Dhabi, U.A.E. P.O. Box 5721

JOB DESCRIPTION:

Prepare quantity take-off and survey for tender drawing projects.

Preparation of detailed Stone and Fixing shop drawings.

Coordination of shop drawing issues with the main contractor and other trades for any discrepancies, revisions and or additional information/s. e.g., RFI’s.

Preparing Stone Cutting list/cut-sheets for order and fabrication in excel and PDF file.

Site monitoring of stone installation on daily basis.

Preparing and submitting daily report, weekly report and program update in excel sheet from planning department.

Basic QA/QC inspection works.

PROJECTS INVOLVED:

Dubai South Mall – Dubai – UAE

THE CONSTELLATION – Abu Dhabi – Corniche – UAE

Abu Dhabi Islamic Bank Headquarters – Abu Dhabi – UAE

Villa E-161 – Emirates Hills, Dubai - 1B+GF+1F+1Roof

ADNOC CORPORATE HEADQUARTERS (3B + 75F) – Abu Dhabi, Corniche – UAE

YAS MALL (Shopping Mall) – Yas Island, Abu Dhabi - UAE

Dubai International Finance Center – Dubai - UAE

King Fahad Financial District – Saudi Arabia

POSITION: Civil & Architectural Inspector

PERIOD: October 2010 – March 13, 2012

COMPANY: A Plus Dyer International Engineering Consultancy ADDRESS: Flat 303, Al Hosn Tower, Al Nasr Street, Abu Dhabi U.A.E. P.O. Box 112969 JOB DESCRIPTION:

Ensuring every inspections has an approved shop drawing, method statement, quality control procedure and inspection.

Carrying out planned site inspections as marked in the relevant Request for Inspection (RFI) by the Contractor/Sub-Contractor.

Closely monitoring site activities to ensure quality of work is in compliance with contract requirements, good construction practice, only approved materials are used, compliance with shop drawings, and reports to Senior Structural Engineer/Project Architect.

Ensuring that all materials used complies with the approved Material Approval Request.

Closely monitoring concrete pours and check continuously concrete materials delivered to site, ensure compliance with QA/QC procedures, and ensure all concrete tests are carried out as per contract requirements.

Frequent checking of formwork/shuttering systems and ensure quality, safety and constructability aspects are met.

Ensures that any non-conformity has been reported through a Non Conformance Report (NCR).

Reviewing the relevant As-Built drawings as submitted by Contractor and make sure that all site conditions are properly addressed.

Conducting inspection for plastering, painting, installations of doors and windows tile fixing, block works, rebar fixing and laying, etc.

Conducting inspection for testing and commissioning for sewerage system, lighting and power, lightning and earthing, security alarms, fire-fighting and HVAC.

Involves in Architectural, Structural and Mechanical Drafting when necessary.

Monitoring installations of plumbing, wiring, equipment, and appliances as per approved method statement.

Maintaining daily logs and supplement inspection records with photographs. PROJECTS INVOLVED:

Al Raha Beach Development

- Central Waste Handling Facilities (3 nos.) – G+1+Roof POSITION: Project Coordinator / Automated Waste Pipe Collection System CAD Designer PERIOD: December 7, 2008 - October 2010

COMPANY: A Plus Dyer International Engineering Consultancy ADDRESS: Flat 303, Al Hosn Tower, Al Nasr Street, Abu Dhabi U.A.E. P.O. Box 112969 JOB DESCRIPTION:

Attending coordination meetings and work closely in liaising with other services to discuss site issues that may arise before and during construction and to ensure delivery of quality drafting of new or redesigned products.

Performing site visitations and actual site measurements for preparation of preliminary design.

Preparing detailed shop drawings for construction such as; 1. General arrangement of Pipe layout/Pipe routing. 2. Equipment Layout.

3. Cable Tray Layout.

4. Compressed Air Layout.

5. Communication (Fiber Optic) Layout.

6. Orthographic / Isometric Layout.

7. Pipe Support Details.

8. P&ID layout

PROJECTS INVOLVED:

Al Raha Beach Development

- Al Muneera, Mainland and Island Residential Apartment - 2B+G+14+Roof

- Al Zeina Residential Apartment – 2B+G+12+Roof

POSITION: PROJECTS COORDINATOR / STRUCTURAL REBAR DETAILER PERIOD: July 31, 2008 up to October 15, 2008

COMPANY: CONSTRIUM L.L.C.

ADDRESS: Flat 104, Al Redha Building, Al Souq Al Kabeer, Bur Dubai, Dubai U.A.E. JOB DESCRIPTION:

Liaising all projects allotted for coordination with Engineering in Philippines and the client with regards to Rebar Shop Drawing and Bar Bending Schedules for submission.

Monitoring of all shop drawings, request for information and follow-ups that have been submitted to the clients.

Coordinating information/instructions received from client and Manila office.

Attending site coordination meetings.

Checking of shop drawings and bar bending schedules as per specifications.

Producing and revising shop drawings.

PROJECTS INVOLVED:

Shahama Saadiyat Link Tunnel – Abu Dhabi, UAE – Leighton Contractors

Yas Island Southern Development Tunnel – Abu Dhabi, UAE – Al Naboodah Contractors

Trump International Hotel & Towers – Dubai, UAE - Al Habtoor JV Murray

& Roberts Contractors.

F1 Theme Park – Motor City Dubailand, Dubai, UAE – Bouygues Batiment International

Canal Bridges – Dubai Waterfront – Dubai, UAE – Samsung Engineering

Bridges – Palm Jebel Ali – Samsung Engineering

Besix (Methods - Formworks & Scaffolding) – Dubai, UAE – Belhasa Sixco

The LOFTS Plot 55 & 57 – Dubai, UAE – Al Futtaim Carillion

Lavine Contemporaine Bridges – Business Bay Dubai, UAE – Al Naboodah Contracting

The Burj Khalifa – Dubai, UAE – Samsung Engineering POSITION: PROJECT COORDINATOR / AUTOCAD STRUCTURAL REBAR DETAILER PERIOD: October 01, 2006 up to July 31, 2008

COMPANY: CONSTRIUM INC., PHILIPPINES

ADDRESS: Pasig City, Philippines

JOINT VENTURE WITH: LT STRUCTURE OVERSEAS SDN

ADDRESS: No. 20-3, Jalan Sp2/8, Taman Serdang Perdana Section 2, 43300 Seri Kembangan, Malaysia

PROJECT: BAHRAIN CITY CENTER, KINGDOM OF BAHRAIN

MAIN CONTRACTOR: CEBARCO – WCT W.L.L.

JOB DESCRIPTION:

Handling & preparing of shop drawings issued for construction, revision & fabrication.

Coordinating closely with the Design Department Engineers’ for shop drawing submissions, revisions and inquiries.

Coordinating with Manila, Philippine office for shop drawing submissions, revisions and inquiries. Producing and providing detailed & analyzed rebar shop drawings for cut and bend with 2D auto-cad software.

Encoding Bar Bending Schedules for cutting and bending using Constrium Product

Management Console (CPMS) software.

Preparing and monitoring of all shop drawings that have been submitted to Design Department.

Preparing and revising of shop drawings for as-built.

Preparing shop drawings which includes downloading using FTP sent from Manila Office, printing bar bending schedules from Constrium PMS and plotting.

POSITION: SENIOR STRUCTURAL AUTOCAD REBAR DETAILER PERIOD: October 04, 2004 to September 30, 2006

COMPANY: CONSTRIUM INC., PHILIPPINES

ADDRESS: R.C. Gonzales Comp, Amang E. Rodriguez Ave., Manggahan, Pasig City. Phils. JOB DESCRIPTION:

Team Leader for a specific project assigned.

Reviewing Architectural and Structural Plans, its specifications and other related documentations of the assigned project for production of shop drawings.

Coordinating additional information/s and inquiries with the structural engineer in case of drawing discrepancies.

Producing detailed shop drawings of rebar reinforcements.

Manual preparation of bar bending schedules based on the preliminary layout of reinforcement shop drawings.

Supervise & monitors Junior ACAD rebar detailers for the preparation and production of computer-aided shop drawings.

Performs screening and administers hands-on examination to potential applicants.

Conducts assistance and guidance for newly hired auto cad rebar detailers. PROJECTS INVOLVED:

1. MAITER SUB-STATION – Doha, Qatar

2. TUAS UNIVERSITY – Tuas, Singapore

3. OLD TOWN RESIDENTIAL – Dubai, U.A.E.

4. NEW DOHA INTERNATIONAL AIRPORT – Doha, Qatar

5. DUBAI INTERNATIONAL AIRPORT (Expansion Program) – Dubai, U.A.E. 6. BURJ KHALIFA – Dubai, U.A.E.

7. FESTIVAL CITY – Dubai, U.A.E.

8. SHEEHANIYAH WALL (North & South Bound lanes) – Doha, Qatar 9. BAHRAIN CITY CENTER – Seef District, Kingdom of Bahrain POSITION: MEP/HVAC MECHANICAL DRAFTSMAN

PERIOD: October 4, 2002 to September 30, 2004

COMPANY: AIRWAY TECHNICAL SERVICES

ADDRESS: 2nd

St. Simplicio Cruz Compound, Sn. Isidro, Parañaque City, Philippines JOB DESCRIPTION:

Performs ocular inspections and conducts actual measurements on sites for the preliminary layout of Mechanical Duct Ventilation System.

Preparing detailed drawing of stainless steel kitchen equipments.

Preparing detailed shop drawings for approved design HVAC ducting layout, grills and hvac blowers.

Prepares preliminary planning for Kitchen Equipment layout.

Supervises manpower for the assembly and fabrication of Duct Works. PROJECTS INVOLVED:

MAX’S RESTAURANTS (Nationwide Branches, Philippines)

MARIO’S RESTAURANT (Tagaytay City, Philippines)

EDUCATION

COLLEGE: TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES Bachelor of Science in ARCHITECTURE

1995 – 2001

TRAININGS ATTENDED

COURSE: Certificate in AUTO CAD 2000 WITH COLOR RENDERING LEVEL I & LEVEL II JULY 15 2001 – JULY 18, 2001 – MICROCADD TECHNOLOGIES

: Certificate in STAAD PRO STRUCTURAL ANALYSIS & DESIGN DECEMBER 11, 2001 – JANUARY 24, 2002 – MICROCADD TECHNOLOGIES

: ACONEX – Online Document Management – Leighton Office Al Goze Bldg. 1St floor,

Dubai, UAE

PERSONAL INFORMATION

NATIONALITY: FILIPINO

CIVIL STATUS: MARRIED

BIRTH DATE: FEBRUARY 02, 1977

PASSPORT NO: P5328461B

SKYPE ID: *********@*******.***

CHARACTER REFERENCES

Arch. Emerson Pedria

Architect

050-*******

HAZ Marble L.L.C. Abu Dhabi, UAE

Engr. Gokhan Nacar

Project Manager

055-*******

Valencia Marble, Abu Dhabi, UAE

Thank you for taking time to review my CV.

Best regard,

JAN MICHAEL M. PAPA



Contact this candidate