Key Skills
Profile Summary
Completion and Workover Operation
Completion and Well Intervention
Run Smart & Semi Smart
Completion in Horizontal and
deviated Injector & Producer Wells.
Health & Safety
Long term planning for rig
Certifications
IWCF Well Control- Supervisory
Level in 2020
Production Data Management
by SIS
Near Miss Reporting, KOC
Production Data Management
by ONGC
OHSAS 18001 Lead Auditors
Training Programme, ONGC
Soft Skills
A competent professional offering a rich experience of nearly 18 years of significant onshore supervision experience, with leading Oil & Gas operators companies as Workover & Completion Engineer
Impressive success in driving all well completion and or intervention activities as per requirements of safety, timeline & budget
Strong exposure in managing all aspects of Completion and Workover operations including Preparation, Execution and Post Completion works
Rich experience in managing daily emergency and critical operations relating to Completion & Well Intervention and Workover Operation including well killing, POOH completion, Running Completions, E-Line, Slick line, Acid treatment, Fishing, Cement job, casing repair, Well head, and X Tree Installation Testing
Skilled in performing Well Intervention online on Rigs i.e. Cement squeeze, cement repair, plug placement, zone transfer, acid stimulation, E-line conveyed logging, perforation, TCP under balanced and overbalanced, installation of ESP and PCP, fishing and milling operation
Proficient in planning, executing & evaluating rig interventions while adhering to company policy, government guidelines and safety procedures
Sound working knowledge of completion of work-over operations in adherence to IWCF requirements
Team player with an outgoing and open personality, and experience of working with diverse teams from varying cultures and backgrounds
Possess well-developed communication, analytical and planning skills Notable Accomplishments Across The Career
Performed initial completion of 50 oil wells on an average of 4 days in new completion and 7 days in workover
Saved 10-20 % rig time in job completion
95% utilization of rig time by minimizing downtime and increasing operational efficiency
Zero discharge of waste in pit
Ensured timely mobilization of resources with minimum inventory
Bagged a Certificate of Merit by Oil and Natural Gas Corporation, India for successful workover of critical wells
Managed workover and WSS data, that was appreciated by ONGC
Spot Bonus for excellent performance by KOC
GEM award for prodigious performance on job by Cairn India
Received a Letter of Appreciation for successful fishing by Cairn India
Accorded with Pat on Back for conducting perforation by 9 runs in daylight by Cairn India
Appreciated for:
o Stopping of work due to Breakdown in PTW as company man by Head PE Cairn India
o Successful well control of SRP well in Cairn India SHASHI SHEKHAR MISHRA
Achievement- driven Professional targeting assignments in Petroleum Engineering, Workover & Completion Engineer with a leading organization of repute in Oil & Gas Industry
Location Preference: UAE & Gulf
E-Mail: ***********@*****.**.** Phone: 91-773******* Communicator Innovator
Thinker
Collaborator Intuitive
Work Experience
Since Feb’13with Cairn Oil and Gas, Vedanta Limited, Barmer, India as Companyman at Workover and Completion Rig
Key Result Areas:
Drove end-to-end completion of:
o Lower Completion activities, such as checking of preparation at rig site. o Upper Completion activities, such as checking sub-assemblies, preparation activities in contractor workshops and witnessing sub-assemblies made up to proper torque, pressure tested, drifted and SIT Supervised & implemented Health, Safety, Environment & Compliance activities at onsite; performed regular safety discussions, risk assessments, toolbox safety talks to achieve target of HSE goal zero Ensured readiness of sub-assemblies prior installation; compiling Sub-Assembly Sheet, Torque Graph, Pressure Test Chart and Achievement Certificate
Participated in CWOP Meeting in town before equipment load-out with all parties dealing with completion operation i.e. Completion Engineers, Drilling Team, Asset Team and vendors o Held discussions with Completion Office Team
Prepared DSI (Daily Standing Instruction) and Running Tally for Lower & Upper Completion to achieve completion objective, HSE goal zero & minimize NPT Supervised Well Completion operations at the rig site, lower & upper completion (Gas Producers, Oil Producers & Water Injectors
Monitored following Adhoc Well Intervention activities at Rig Site: o Pulling of well completion components up till production packer during Workover operations o Slick Line Well Intervention for rig entries (i.e. well integrity plug off) o Rig site offline slick line opportunities requested by Well Activity Owners. o Well Kills & Well Abandonments (i.e. Open SSD, Set Deep Set Plugs, Shallow Plugs & Pumping Kill Brine) o Offline X-mas Tree Installation, Integrity Test
o Troubleshooting & Rectification of X-mas Tree & Control Line problems o Well Kick Off Activities (GLV Change Out, N2 Lifting) Maintained compliance with respect to HSE Policy, Process Safety Policy, Engineering Practices, Procedures and Operating Policies
Participated in:
o Pre-operation HAZOPs related to New Well Completion & Well Intervention Equipment o New Well Completion & Intervention pre-planning processes and provided technical input for programs (on- shore)
o Equipment assurance processes, and service provider competency assessments Developed reports on sub-assemblies & tubing tallies, daily operational reports using BSP OpenWells, end of well completion report, End of Well Report (EOWR) i.e.: final schematic & final tally, test chart, daily activity report and completion equipment data (P/N & S/N)
Rig commissioning
Previous Experience
Aug’10-Jan’13 with Kuwait Oil Company, Ahmadi, Kuwait as Workover Engineer Highlights:
Planned and executed Workover Operations for 2 nos. of workover rigs and for rig-less job.
Invoice processing.
Implemented HSE policy, analysis of cost and timeline, optimisation of operation, coordination with surface and sub-surface team
Aug’02-Jul’10 with Oil and Natural Gas Corporation, Mehsana, India Growth Path:
Aug’02-Jun’04: Assistant Executive Engineer- Production Jul’04-Jul’10: Executive Engineer-Production
Highlight:
Executed activities like fishing, milling, water and gas shut off, perforation, stimulation, well activation, sand control, installation & replacement of artificial lift equipment like SRP, PCP, GLV
Carried out all works with crew of rig movement, rig building, workover operation at wells
Worked at base for preparation of workover program, coordination, monitor and reporting of 20 nos. Of workover rigs
Prepared target and resources for 5 years and yearly basis
installed and populated New Database center, Roll out and implemented SAP Technical Skills
ERP: SAP, Open Well
MS Office 2007 (Excel, PowerPoint,Word)
Academics Details
M.Tech. (Petroleum Engineering) from Indian Institute of Technology (ISM),Dhanbad, India in 2000
B.Tech. (Mechanical Engineering) from Karnataka University, India in 1998 Personal Details
Date of Birth: 1st March 1974
Languages Known: English &Hindi
Address: Sector 3C, Quarter Number-311, Bokaro Steel City-827003, Jharkhand Passport Details: N0505188; 21st July 2025
Nationality: Indian
Marital Status: Married
No. of Dependents: 2
Driving License Details: GJ0202752405; 29th February 2024