Deepak’s *
RESUME
DEEPAK KUMAR
New Area, Jora Mandir
Dehri On Sone, PO-Dalmianagar
Distt-Rohtas (BIHAR), PIN-821305
Contact No. – 096********, 087********
E-mail: *********@**********.***, *******@*****.*** EDUCATIONAL QUALIFICATION
Sl. No. Examination Passed Passing Year Board/University % Obtained 1 Matriculation 2001 B.S.E.B - Patna 54
2 Intermediate 2003 B.I.E.C - Patna 58
3 Diploma (Civil) 2007 State Board Technical Education - Patna 68 ADDITIONAL QUALIFICATION
1. CWA, from NIIT – Dehri On Sone
2. Auto CAD 2D & 3D, from The CAD Institute – Patna 3. Knowledge of M. S. Project
AREA OF EXPERIENCE
● Barrage / Dam
● Tunnel & Underground Works
● Canal
● Hydroelectric Power Project
● Solar Power
● Switchyard
● Road & Highways
WORKING EXPERIANCE
Sl.
No.
Description of Work Project Name Owner During the
year
1 Four laning of road Pandoh bypass to Takoli
including construction of twin tunnels, major
bridges, elevated structure etc.
Four laning of End of
Pandoh bypass toTakoli
section of NH-21 from
km 221.305 to km
242.000
NHAI Oct 2018 to
Present
2 Construction of Barrage with radial gates, hoisting arrangements including formation of guide bunds
on either side of barrage, road bridge etc across
Godavari River
Kaleshwaram Project –
Annaram Barrage
Project
I & CAD Department -
Talangana
Aug 2016 to
Oct 2018
3 Concrete lining of canal using paver machine Parallar Lower Ganga Canal Project
UP Irrigation & Water
Resource Department
Dec 2015 to
July 2016
4 Construction of Dam (CFRD), Intake & Head Race
Tunnel, Surge Shaft & 51 Inclined Tunnel,
Penstock, Power House, Tail Race Tunnel &
Switchyard and its allied structure RCC lining &
underground work etc.
3 x 110 MW
Kishanganga
Hydroelectric Power
Project
NHPC Jan 2013 -
Sep 2015
5 Construction of Solar Module for 3 x 25 MW Solar Project and Construction of 33 kV Main
Switchyard, Main Control Room, Unit Control
Room & Unit Switchyard
3 x 25 MW Solar
Photovoltaic (Thin Film
Technology) Power
Project.
MAHAGENCO Sep 2012 -
Dec 2012
6 Renovation & Modernization of 4 x 4.80 MW Kosi
Hydel Power Station.
Kosi Hydel Power
Station
Bihar State
Hydroelectric Power
Cor. Ltd.
Jan 2011 -
Aug 2012
7 Construction of Power House Building/Operation
& Maintenance of Power House
Various Small HEP in
Bihar
Bihar State
Hydroelectric Power
Cor. Ltd.
Dec 2007-
Sep 2010
Deepak’s 2
COMPANY AND DESIGNATION CHART
Sl.
No.
Year Company/Organization Designation
1 Aug 2016 to Present Afcons Infrastructure Ltd. Sr. Engineer (Planning/QS) 2 2015 – 2016 Patel Engineering Ltd. Project Engineer (Civil - Q/S) 3 2013 - 2015 HCC Ltd. Planning Officer
4 2012 ABB Ltd. Site Engineer (Civil)
5 2011 - 2012 HPP Energy (I) Pvt. Ltd. Site Supervisor 6 2008 - 2010 Shahabad Engineers Pvt. Ltd. Site Supervisor NATURE OF EXPERIENCE
● Tunnel & Road work
Planning & Monitoring and Quantity estimation from drawings.
Preparing the construction program of tunneling by NATM, assist to finalise the Budget.
Monitoring the construction program plan v/s achieved (Financial and Physical).
Preparing, getting approval (in accordance with HO) and finalization of lifting/launching scheme for major and minor bridges and monitoring the work during execution.
Finalisation of Sub Contractors for different types of work through enquiry and discussion.
Preparing the methodology for all activities of Tunnel & Structure work.
Close monitoring of major fabrication work such as composite steel girders, tunnel gantries, jumbo platform, required shutters for tunnel & structure etc.
Prepare the monthly material requirement for the project and monitoring the same.
● Barrage work
Preparing the construction schedule/program/sequence for excavation, concreting of structure etc.
Preparing and finalization of formwork system (Conventional/Doka) for concreting of raft, piers & I – Girder.
Preparing of methodology for each activities and finalization of instrumentation system for barrage work.
Assisting for preparing the budget & cash flow. Entering the DPR in SAP System.
Monitoring the progress, actual v/s planned and execution & supervision the work at site
Coordinating & supporting in field work in accordance to HO and client to solve the drawing’s error, site technical issues etc.
Arranging & deploying the PRW contractor for execution of work.
Rate analysis and finalization of rate for PRW contractors, which is to be paid.
Preparing monthly bill according to DPR for PRW contractors.
Preparing Sub-Contractor, PRW Work Order and bills in SAP System. Achievement: We achieved the organizational record for maximum concrete in single day (5300 Cum) and single month (1,15,000 Cum) by giving effort for proper planning, supervision of work, deployment of man and machinery etc.
● Canal work
Preparing the construction schedule for concrete lining of canal using paver machine.
Assist in preparing the budget & cash flow.
Rate analysis for BoQ items, actual v/s planned.
Preparing monthly bill according to DPR and processing/certifying it with client.
Preparing Sub-Contractor, PRW Work Order and bills in ERP (Build Smart).
● Tunnel (by NATM) & Underground Works
Preparing the work schedule & construction program for tunnel work.
Preparing quantity for bills and verifying it from client.
Coordinating & supporting in field work, solve the drawing and site’s technical issues.
Monitoring of activities at site as per the construction program.
Monitoring & supervision for installation & erection work of special and heavy equipment.
● Hydroelectric Power Plant (Tunnel based)
With Design/Planning & Control section,
Assist in Preparing the work schedule for execution of dam, spillway, intake structure, power house & control building structure etc.
Preparing the Bar Bending Schedule and statement of Quantity for QSS & client.
Review the construction drawing and update to concern persons about its revision, errors (if found).
Modifying the drawing as per site condition (if required, based on discussion with concern) and send to HO for further action & implementations.
Preparing the proposal drawing according to availability of site. Deepak’s 3
With Survey Section,
Generating contour drawings.
Detailing/drawing of various supporting site work for correct execution & its fitment, alignment, arrangements (existing & new) for Tunnel and its Adit, Power House and Transformer Cavern, Inclined Pressure Shafts, Surge Shaft, Intake Tunnel, Dam & Spillway.
Preparing the support detail for rock support (ribs)/formwork/shuttering, Gantry/Jamboo for drilling, slicing, winding, pouring and its supervision.
Ensuring & supervision the proper alignment and level of tunnel, cavern/chamber excavation, shutter, bar position (as per approved BBS) hydro-mechanical items and embedded/inserted parts. Achievement: Assist to ensure the correct alignments and levels by traverse to complete the 23.5 km Water Tunnel in Himalaya region for 3 x 110 MW Kishanganga Hydroelectric Power Project (by Tunnel Boring Machine - 15 km and by Drilling & Blasting method - 8.5 km)
● Solar Power Project
Execution/Supervision of civil activities for Control Room Building (Main & Units), 33 kV Main Switchyard & Unit Switchyard with its structure & equipment foundation, trenches & drains, pedestals for solar module etc.
Ensuring the quality standards for all civil works executed at site, communicating work progress and site issues to senior/head and clients representative at the site (if necessary).
Ensuring the availability of shuttering material at site.
Prepare the Bar Bending Schedule.
● Hydroelectric Power Plant (Open Canal)
Execution/Supervision of civil works its embedded/inserted part for service bay, machine hall structures, columns
& beam etc.
Execution/Supervision of civil activities such as Desilting of power channel, fore bay, tail pool and tail race channel with water path & turbine pit of PH area by manual, machinery and dredging process.
Assist to preparing the schedule for renovation/refurbishment work of Turbine, Generator & its auxiliaries.
Assist in liaison with client officials for various aspects of project planning & progress and billing.
Maintain the Technical record of dismantled/erected/installed equipment.
Making Sketch of dismantled equipment/items.
Erection/Installation of electro-mechanical equipment and its Panels.
Erection/Installation of hydro-mechanical equipment/items.
Preparing of monthly Quantity according to DPR and processing the monthly bill.
Monitoring the available material and tools & tackles at site & preparation & processing the procurement for material, tools & tackles (as per site requirement).
● Switchyard
Execution/Supervision of civil activities for foundation (tower, gantry, equipment & lighting mast), earthing pits, trenches, drains, gravels spreading, and pedestal for fencing etc.
Erection/Installation of Switchyard structures and its equipments such as HT & LT Transformers, CT’s, PT’s, Breakers, Isolators, Buses, Insulator (Post/Pin type) etc.
Allocation & deploying manpower for above work.
Preparing of monthly Quantity according to DPR and processing the monthly bill.
Monitoring the available material at site & preparation & processing the material procurement (as per site requirement).
Preparing the Bar Bending Schedule.
Maintain the technical/consumable record for executed work in a particular days Personnel Information
Father’s Name : Bhola Lal Das
Date of Birth : 10/01/1985
Nationality : Indian
Martial Status : Married
Language Known : Hindi & English
Hobbies : Listing Music & Social Work
Passport : Having valid passport.
Deepak Kumar