PERSONAL INFORMATION
SURNAME: HAMMAN
NAME: JACO
ID NUMBER: 861**********
DATE OF BIRTH: 14 OCTOBER 1986
NATIONALITY: SOUTH AFRICAN
MARITAL STATUS: SINGLE
TELEPHONE: 066-***-****
EMAIL ADRESS: ***********@*****.***
HEALTH: EXCELLENT
EDUCATION AND TRAINING
AGRICULTURE HIGH SCHOOL OAKDALE – GRADE 10
MOSSELBAY SOUTH CAPE COLLEGE – N3
PETROSA COE SHUTDOWN FITTING – COMPLETED
PETROSA FITTER NQF LEVEL 2,3,4 – COMPLETED
COURSES DONE TILL PRESENT - HUMAN PROGRESS COURSE
FIRE FIGHTING
FIRST AID
PERMIT COURSE AT PETROSA
WORK EXPERIENCE
PERTOSA, MOSSELBAY OVERHAULED VALVES, CENTRIFUGAL/INTERNAL PUMPS AND GEARBOXES
JAN 2006 – APRIL 2006 PRESSURE TESTED VALVES AND HEAT EXCHANGERS
WORKED ON TURBINE COMPRESSORS AND MOTORS
ALIGNMENT OF PUMPS AND MOTORS USING DTI LASER METHOD.
MITTAL, LANGEBAAN REMOVED AND REPLACED VALVES
MAY 2007 – AUG 2007 LUBRICATION OF ROLLERS AND BEARINGS
ALIGMENT OF MOTORS USING DTI LASER METHOD
BASIC RIGGING
FAULT FINDINGS .
PETROSA, MOSSELBAY INSPECTED AND DISMANTLED VALVES
AUG 2006 – OCT 2006 LAPPED SEATS, DISC AND WEDGES ON VALVES
SHUTDOWN PRESSURE TESTED VALVES AND HEAT EXCHANGERS
REMOVED, OVERHAULED AND REPLACED VALVES .
PETROSA, MOSSELBAY OVERHAULED AND REPLACED VALVES
SEPT 2009 – OCT 2009 PRESSURE TESTED VALVES AND REPAIRED FAULTY VALVES .
CDO ENG, MOSSELBAY WORKED ON AIRHEATERS
MAY 2010- JUNE 2010 REPLACED AND SERVICED LINKS AND PINS ON STROKERBED
NESTLE SHUTDOWN REMOVED AND REPLACED ELEMENTS ON A COAL FURNACE .
CDO ENG, MOSSELBAY REMOVED AND INSPECTED VALVES
AUG 2010 – 0CT 2010 DISMANTLED VALVES AND SERVICED VALVES
INSPECTED PSV’S AND SERVICED AND REPAIRED PSV’S
PRESSURE TESTED VALVES AND PSV’S AND REPLACED VALVES.
EXTREME HOSE, VEREENIGING HYDRAULIC HOSE/PIPE ASSEBLIES TO 12” PIPES
JAN 2011 – MARCH 2012 PRESSURE TESTED OF HYDRAULIC/STAINLESS STEEL HOSES
DILEVERY AND COLLECTING OF HOSES
BUILTING HYDRAULIC SYSTEMS
WORKED ON LATHE MACHINE
OVERHAULED AND MAINTAINED BOILER/STRAINERS AND VALVES.
ATKINSONS LIQUOR STORE MANAGER
MARCH 2012 – APRIL 2015 ORDERING AND COLLECTING OF STOCK
PAYSLIPS
STOCKTAKE AND BOOKKEEPING .
UAS (UTILITIES) UTILITIES ADMINISTRATOR
FEB 2016 – NOV 2016 READING OF ELECTRICITY AND WATER METERS
SENDING OUT STATEMENTS OF UTILITY BILLS
FAULT FINDING ON METERS
EAD CIVILS SITE MANAGER
MARCH 2017 – SEPT 2018 HIGHMAST LIGHTS AND CELLPHONE TOWER CIVIL WORKS
SITE ALLOCATIONS AND SITE LAYOUTS FROM DRAWINGS
EXCAVATION AND SOIL PRESSURE TESTING BY USING A DCP
REBAR AND STEELFIXING TO DRAWINGS
CONCRETE CASTRING AND VIBRATING USING POKER
BACKFILLING AND COMPACTION OF SOIL
BRICKWORK AND FENCING
RAZORWIRE AND RAZORMESH
ACORN PROJECTS 78 SITE MANAGER
OCT 2018 – FEB 2020 HIGHMAST LIGHTS AND CELLPHONE TOWER CIVIL WORKS
(RETRENCHED) SITE ALLOCATIONS AND SITE LAYOUTS FROM DRAWINGS
LONG DISTANCE DRIVING
EXCAVATION AND SOIL PRESSURE TESTING BY USING A DCP
REBAR AND STEELFIXING TO DRAWINGS
CONCRETE CASTRING AND VIBRATING USING POKER
BACKFILLING AND COMPACTION OF SOIL
BRICKWORK AND FENCING
RAZORWIRE AND RAZORMESH
REFERENCES
PETROSA WESLEY/NORMAN 044-***-**** ASK FOR WESLEY OR NORMAN
CDO ENG. DIRK 044-***-**** OR 082-***-****
EXTREME HOSE KAREL 083-***-****
ATKINSONS LIQUOR MAGRIET 082-***-****
UAS LOUVAINE 076-***-****
EAD CIVILS STEPHAN 082-***-****
ACORN PROJECTS JAPIE 082-***-****