RESUME
NAVEEN KARTHI.R
Mobile: +91-957*******,853******* Email: **************@*****.***
OBJECTIVE:
To become a successful professional by updating my knowledge and offering my dedicated service to the organization with my ability to rapidly learn & assimilate new technology and put it to work effectively.
EXPERIENCE:
●2 and half Years of Experience in Testing & Commissioning of Special Electrical Equipments.
EDUCATION QUALIFICATION:
COURSE
INSTITUTION
BOARD/UNIVERSITY
YEAR OF PASSING
MARKS B.E (EEE)
A.R.J College of Engineering and Techonology,Mannarkudi
Anna University, Chennai.
2015
61
DEEE
Sembodai R.V polytechnic College sembodai
DOTE
2012
70
HSC
Velludayar higher secondary school
State Board
2010
50.5
SSLC
Velludayar higher secondary school
State Board
2008
69.2
WORKING EXPERIENCE:
Working as Commissioning Engineer in M/S VOLTECH Engineers Private Limited
(ISO 9001-2000 certified company) from march 2017 to till the date.
PROJECTS WORKED:
Project #1 : NTPC SOLAPUR SUPER THERMAL POWER STATION,SOLAPUR
400/220KV substation switchyard(AIS)
Designation: Testing and commissioning
Duration : march 2017 to august 2017
Project #2 : POWERGRID CORPORATION OF INDIA LIMITED KOTPUTLI, RAJASTHAN
400/220kv Substation Switchyard (AIS).
Designation: Operations and Maintenance (O&M)
Duration : September 2017 to November 2017
Project #3 : POWERGRID CORPORATION OF INDIA LIMITED, VARANASI, UP
765/400kv Gas Insulated Switch Gear Substation (GIS).
Designation: Operations and Maintenance (O&M)
Duration : December 2017 to april 2018
Project #4 : POWERGRID CORPORATION OF INDIA LIMITED, JHATIKARA,DELHI
765/400kv switchyard (AIS)
Designation: Testing and commissioning
Duration : may 2018 to august 2018
Project #5 : POWERGRID CORPORATION OF INDIA LIMITED, GAYA, BIHAR
765/400kv switchyard (AIS)
Designation: Testing and commissioning
Duration : September 2018 to MARCH 2019
Project #6 : POWERGRID CORPORATION OF INDIA LIMITED, PATNA, BIHAR
400/220kv switchyard (AIS)
Designation: Testing and commissioning
Duration : March 2019 to agust 2019
Project #7 : POWERGRID CORPORATION OF INDIA LIMITED, JAIPUR,RAJASTHAN
400/220kv switchyard (AIS)
Designation: operation &maintance
Duration : october 2019
Project #8 :,RAILWAY PROJECT PHULERA RAJASTHAN
220/55switchyard (AIS)
Designation: Testing and commissioning
Duration : october 2019 to stil now
ROLES AND RESPONSIBILITY OF O&M
●Performing shutdown operations Through SCADA.
●Monitoring of power flow in Scada .Recording of hourly power flow details of both incoming and outgoing
feeders and lines.
●Coordination with load dispatch centers in order to maintain the Voltage regulations.
●Physical verification of all equipment’s like Transformers, CT’s, PT's, All Relays, FFPH systems, ACLT
systems, Battery chargers, DG sets, PLCC systems and all substation equipment’s in order to maintain
The Smooth Operations.
●Providing Timely Shutdown for the equipment’s for Maintenance. Record keeping of all equipment’s
Details.
●Maintaining of All Registers in order to Minimize the abnormalities like Registers for OTI, WTI’s of
Transformers and both bus&line reactors.CT oil levels, Breaker Counters and SF6 pressures of CB's.LA's
leakage currents and its counters. Energy meter readings of all lines.Monitering of DG diesel and FFPH
diesel engine diesel level. FFPH Water tank level and pressure.Monitering of Inverters and Battery banks.
●Recording of disturbance such as reason for trip. Distance of trip. Fault currents and other details in relay
●24 7 monitoring of all above mentioned activities in secure and safety manner..
At last ensure 100% safety Operations of both Human and Equipments.
ROLES AND RESPONSIBILITY OF TESTING AND COMMISSIONING ENGINEER
●Testing of all electrical equipment’s such as Transformers, CT PT’s, Relays, CB’s, Wave traps, LA’s and Isolators under client norms and guidance.
●Commissioning of all above tested equipment’s.
●Commissioning process includes scheme modifications, cable laying by using cable schedules and also updating cable schedules. Error findings, Coordination with Relay engineer for status through and operational checks.
Major role is to Ensure Safety of Both Electrical equipment’s and Human safety is a priority.
TECHNICAL SKILLS:
Testing and commissioning of all Electrical equipment from 415 volts to 765 KV System.
Inspection of Control and Relay panel, Preparation of Test Report for Sub-Station.
Testing of CT, PT, CVT, Circuit breaker, Isolator, wave trap and lightening arrestor.
Scheme checking of HT and LT panel.
Scheme checking of control and relay wiring circuit, interface from yard equipment to control and relay panel with interlocks for transformer, bus coupler and line rays.
Modification of the cable schedule and wiring circuit as per customer and system requirement.
Submission of as-build cable schedule and test reports.
Operation and Maintenance of sub-station.
Prepare test protocols for sub station equipment’s and obtain customer approval.
Team handling, Co-ordination with client and team members.
Trouble shooting of all electrical circuit control and protection circuits.
Co-ordination with client in as Built Scheme drawing submission, test report
Submission
PERSONAL INFORMATION:
Date of birth : 28/03/1993
Nationality : Indian
Sex : Male
Marital Status : Single
Passport No : N2428280
Hobbies : Cricket
Permanent Address : S/O s.k.Rajendran
Door NO :2/22, Main road,
Kattur post, thiruvarur Taluk,
Thiruvarur District,
Tamilnadu-610104.
(R.NAVEENKARTHI)