Post Job Free

Resume

Sign in

Electrical Engineer Project

Location:
Abu Dhabi, United Arab Emirates
Salary:
14000
Posted:
September 01, 2020

Contact this candidate

Resume:

* * * * *

CURRICULAM VITAE

AJIMON PAUL

MEP ESTIMATOR/QUANTITY SURVEYOR

Mussaffah, Abu Dhabi, Email: adfqt3@r.postjobfree.com, Mob: +971-********* Objective Statement:

More than Eleven Years of cross-cultural experienced strategic Quantity Surveyor with expertise in Estimation and costing for projects, with a flair for adopting modern methodologies in compliance with quality standards. Adopt Project Management Tools and techniques, Implementation of Monitoring and control procedures, Resource & Duration reviews of projects.

Areas of Expertise:

Primavera P6 /MS Project Scheduling Material Procurement. Value Engineering EOT Claim Preparation Shop Drawing by AUTOCAD. Document Control Variation Submission. Site Coordination Submittal Preparation Quantities take off BOQ Preparation Vendor Relation. Monthly Progressive Billing / Invoicing. Quotation Analysis Delay Analysis. PROFESSIONAL EXPERIENCE (12 YEARS)

Since April ’2018 with CGC House Contracting, Abu Dhabi, United Arab Emirates working as MEP Quantity Surveyor (2 Year and 3months).

From August’2012 to April 2018 with SCADA MEP Contracting, Abu Dhabi, United Arab Emirates working as MEP Quantity Surveyor (5 Years and 8months).

From January ’2011 to April 2012 with SK Engineering and Construction, Habshan, Abu Dhabi, United Arab Emirates worked as E&I Planning Engineer (1 Years and 4 months). From July ’2008 to August 2010 with Nasser S Al Hajri Corporation, Al Jubail, Kingdom of Saudi Arabia worked as Electrical Engineer (2 Years and 1 month).

From July ’2006 to July 2008 with Kerala State Electricity Board (KSEB), Nedumkandam, Idukki, Kerala worked as Substation operation and Maintenance Engineer (2 Years). PROJECTS SUMMARY

The Bridges Project, Reem Island, Abu Dhabi. (AECOM., ALDAR Properties) Akoya Oxygen Villa Project, Dubai. (Ganthoot Cont., DAMAC Properties) Abu Dhabi Future School Project, Shakbout City, Abu Dhabi(Al Mansouri 3B, ASFS) Shah Gas EPC 10 Project, Shah, Abu Dhabi.(Al Jaber Buildings, ASCON,Al Hosn Gas) Al Abbas School Buildings Extension Project, Ruwais, Abu Dhabi.(Force 10 LLC,ADNOC) ENEC Guest House and Visitor Centre, Baraka, Abu Dhabi.(Al Jaber Cont.,ENEC) FERTIL Non Process Buildings Project, Ruwais, Abu Dhabi.(AMANA,FERTIL) Asia 7 and Zambar Café Restaurant, Bawabat Al Sharq Mall, Abu Dhabi. Bab Gas Compression Project, Habshan, Abu Dhabi, United Arab Emirates (SKEC,ADCO) Saudi Kayan Petrochemical Complex Phenolic Project, AL Jubail,KSA(NSH,Saudi Kayan) Construction of 33Kv Substation for Wind Power Station,Kerala,India(KSEB) 2 P a g e

ORGANISATIONAL DETAILS

A. CGC House Contracting, Abu Dhabi (From April 2018 to Present) 1) The Bridges Project, Abu Dhabi.

Project Brief: The Project scope of work for CGC comprised of 6 Towers with 2B+G+26 floors + Roof.

Project MEP Value: AED 300 million (approx.)

Designation: MEP Quantity Surveyor.

Consultant: AECOM.

Project Status: Construction Stage.

Project Period: 2018-2020

B. SCADA Contracting, Abu Dhabi (From August 2012 to April 2018) 2) AKOYA Oxygen Villa Project, Dubai.

Project Brief: The Project scope of work for SCADA comprised of 210 No’s Villas Mechanical, Electrical, Low current, Plumbing and Drainage Systems for Akoya Oxygen Villas. These villas consist of 8 types of villas.

Project MEP Value: AED 45 million (approx).

Designation: MEP Quantity Surveyor.

Main Contractor: Ganthoot Contracting LLC.

Project Status: Construction Stage.

Project Period: 2016-2017

3) Abu Dhabi Future School Project, Shakbout City, Abu Dhabi.

Project Brief: The Project scope of work for SCADA comprised of all Mechanical, Electrical, Low current, Plumbing and Drainage Systems for Abu Dhabi Future School. This School consists of the GF + 2Fl+Roof. Built up area of approximately 25,000 sqm with 70 Classrooms, 14 Learning Plazas, 2 ICT Labs, 2 Art rooms, 15 Teachers Offices, Auditorium, Administrative Offices, Clinic, Meeting rooms, and instructional facilities.

Project MEP Value: AED 40 million (approx).

Designation: MEP Quantity Surveyor.

Main Contractor: Mansouri 3B L.L.C

Project Status: Completed.

Project Period: 2016-2017

4) Shah Gas EPC 10 Project, Shah, Abu Dhabi.

Project Brief: Project scope for SCADA consists of Non-process Buildings (administration building, mosque, restaurant, workshop building, main warehouse building, chemical warehouse, main entry reception building, SCADA was responsible for part of the engineering, procurement of applicable MEP materials and equipment’s, installation, testing, pre-commissioning and commissioning of all relevant systems as per the scope of works and specifications of EPC package 10.

Project MEP Value: AED 60 million (approx).

Designation: MEP Quantity Surveyor.

Main Contractor: Associated Construction & Investment Company (ASCON L.L.C.)

Project Status: Completed.

Project Period: 2014-2016

5) ENEC Guest House and Visitor Centre, Baraka, Abu Dhabi.

Project Brief: The Contract Includes Procurement and Construction of Mechanical, Electrical and Plumbing Items for the project ENEC Guest House and Visitor center. The Emirates Nuclear Energy Corporation (ENEC) is working to deliver safe, clean, efficient nuclear energy to the United Arab Emirates - energy that is needed to support the UAE’s social and economic growth.

Project MEP Value: AED 25 million (approx.).

Main Contractor: AL Jaber Buildings LLC.

Designation: MEP Quantity Surveyor.

Project Status: Completed.

Project Period: 2014-2016

3 P a g e

6) FERTIL Non Process Buildings Project, Ruwais, Abu Dhabi.

Project Brief: The project scope for SCADA consists of buildings Main Gate House, Common Staff Training, Mosque Building, Sand Blast, Chemical Storage, Spare Parts Warehouse (Two levels), Central Archives, and services. SCADA was responsible for part of the engineering, procurement of MEP materials and equipment’s, installation, testing, pre-commissioning and commissioning of all relevant systems as per the scope of works and specifications of FERTIL.

Project MEP Value: AED 50 million (approx.).

Designation: MEP Quantity Surveyor.

Main Contractor: AMANA Contracting Company (AMANA L.L.C.)

Project Status: Completed.

Project Period: 2012-2014

C. SK Engineering and Construction, Abu Dhabi (From 2011 January to 2012 March) 7) Bab Gas Compression Project, Habshan, Abu Dhabi, United Arab Emirates

Project Brief: The Project scope of work for SK Engineering and Construction comprised of full Electrical and Instrumentation Jobs for CS-1, CS-2 and CS-3 Areas.

Project: Bab Gas Compression Project, Habshan, Abu Dhabi, United Arab Emirates.

Client: Abu Dhabi Company for Onshore Oil Operations (ADCO).

Designation: E&I Planning Engineer.

Main Contractor: SK Engineering and Construction, Abu Dhabi

Project Status: Completed.

Project Period: 2011-2012

D. Nasser S Al Hajri Corporation, KSA (From 2008 July To 2010 August) 8) Saudi Kayan Petrochemical Complex Phenolics Project,Al Jubail,KSA

Project Brief: The Project scope of work for Nasser S Al Hajri Corporation comprised of full Electrical and Instrumentation Jobs for KAYAN-2 Areas.

Projects: Saudi Kayan Petrochemical Complex Phenolics (Technicas Reunidas) Project.

Project MEP Value: AED 60 million (approx).

Designation: Junior Planning Engineer.

Main Contractor: Technicas Reunidas

Project Status: Completed

Project Period: 2008-2010

E. Kerala State Electricity Board (From 2006 July to 2008 July) 9) Construction of 33Kv Substation for Wind Power Station,Kerala,India Project: Construction of 33Kv Substation for Wind Power Station. Client: Kerala State Electricity Board (KSEB), Nedumkandam, Kerala, India

Project MEP Value: AED 5 million (approx).

Designation: Electrical Engineer.

Main Contractor: KSEB LTD

Project Status: Completed.

Project Period: 2006-2008

AREAS OF EXPERTISE

Project Planning & Progress Reporting

Project Planning using project management software Primavera P6 and MS Excel.

Project report generation through Project management software’s.

Conduct project progress meetings in order to control & resolve critical activities.

Review project along with project head as a member of Project Management Office (PMO). Project Management

4 P a g e

Monitoring project compliance with project management standard policies, procedures and templates through project audits.

Assisting Project Managers/Employers representative to coordinate progress meetings, coordination meetings, reports, analysis of all components of project management that are part of Project and product scope.

Site Management

Ensuring that Project communication tools like Programme, progress reports are adhered to.

Providing site team with the required look ahead schedule and progress update in order to meet the project schedule and planned progress milestones.

Providing the site team with various monitoring formats & progress charts.

Conducting regular site progress meetings to discuss various critical issues. EDUCATIONAL QUALIFICATIONS:

Engineering Graduation - 2006 (4 Years)

1. B. Tech in Electrical and Electronics Engineering.

SNG College of Engineering Kolenchery, Kerala (First Class) Mahatma Gandhi University Kottayam, Kerala, India.

Diploma in Engineering (3 Years)

2. Diploma in Electrical Engineering

Government Polytechnic College Muttom, Kerala (First Class) Department of Technical Education, Kerala, India.

CERTIFICATIONS

Planning and Scheduling with Primavera Project Planner- P6 training from Cambridge Institute, Dubai.

AUTO CAD Design (CADD CENTRE, INDIA).

SOFTWARE’S

Project Planning software - MS Project 2007 Professional

Primavera 3.1, 5.0 & 6.0.MS-OFFICE (Word, Excel, PowerPoint).

Operating system: Windows, Vista, Mac.

PERSONAL DOSSIER

Date of Birth : 11th Aug 1982

Passport No : N 2948227 valid till 17-04-2026

Marital Status : Married

Religion : Christian

Visa Details : Residency

UAE driver's license : Valid License available.

Contact No : +971-*********

E-mail : adfqt3@r.postjobfree.com

Permanent Address : Kannikkattu (H), Anchiri P.O, Thodupuzha, Idukki, Kerala, India DECLARATION:

I hereby affirm that the above furnished are true to the best of knowledge. 26-07-2020,

Abu Dhabi.



Contact this candidate