Post Job Free
Sign in

Engineer Manager

Location:
Riyadh, Saudi Arabia
Posted:
September 01, 2020

Contact this candidate

Resume:

PROFESSIONAL CRTIFICATION:

Project Management Professional (PMP).

PMI Risk Management Professional (RMP).

* ***** (Y.B)

M-o-R ( Management of Risk )

Primavera Risk Analysis.

Arc GIS.

uniquely qualified to Lead Risk

process in the organization,

Looking always to develop the

organization methodology to

meet the market challenges

Email : adfqt2@r.postjobfree.com

Telephone: 009***********

unique

95

%

90

%

Getting targets Professionalism

P M P - P M I, R M P - 6 S i g m a

Mohamed Al Hasan C.V

Mr. Mohamed is a skilled risk specialist with18years of practical experience in the construction industry and project management field has worked for some of the prestigious companies in Saudi Arabia and Syria. Mr. Mohamed is a professional leader adept at streamlining operations and improving efficiencies to complete tasks on time and within budget.

Mr. Mohamed has proven ability to deliver innovative solutions to support project business alignment and growth objectives through delivering top performance with emphasis on develop, deployment and improvement Risk management process project, program and portfolio within high management.

● as a first Risk Manager assigned in RTCC

Company, I had the responsibility to establish,

develop and deployment Comprehensive Risk

management Process in the water department

as a whole

responsible at Risk management, ensuring

that the Risk management is implemented

effectively across the organization, coaching

and leading the team, providing project

control services with management office of the

entire Water Department in respect of the

Client requirements, and helping to ensure

everything is in accordance with all relevant

policies, procedures, and processes.

● Adaptation the risk Management process

within the organization accordance to (PMI-

AXELOS-ISO31000) philosophies to ensure

full effectiveness for the risk management

process Practice.

Monitoring the progress, baselines case, risk

analysis, put response plan in place and

reporting to Project management and PMO.

I have very good knowledge in management

as a whole and Risk Management In

particularly

Project management professional.

Risk Management Professional.

Value Engineering.

Leadership & Team works.

Staff motivation

Project’s controls.

High skills communication

Problem solving.

RMI Risk Management Professional

PMI (Project AXELOS

Management Institute)

● Approved From SWCC as Risk Manager

Membership:

Competencies & Skills:

EDUCATION:

science of civil engineering Diploma

2001 Major: construction & Civil Engineering

SUMMARY

• Civil Assistant Engineer

•(HOMING ESTABLISHMENT

CO)

• Project Title: Housing Villas

• Syria- Damascus & Hama

2002-2010 2010-2012

• Civil Site engineer DRAKE

AND SCULL

• Kingdom of Saudi Arabia

• Project Title: (King

Abdullah Petroleum

Studies and Research

Center Project) KAPSARC

• Saudi Arabia

2012-2013

• Civil site engineer

•FTAYRJE COMPANY

• Project Title: (king

Abdullah Financial

District)

• Saudi Arabia

2013-2017

• Project engineer for

• Al Hokair Group

Company

• Project Title:(Hotels

& villas and palaces)

• Saudi Arabia

2017-2018

• Risk & Construction Officer

• Archen engineering

consultant

• Project Title: Integrated

Public Security Operation

911 IPSO Phase 1

• Saudi Arabia

2018-Now

• Senior Risk Manager

• RTCC Company

•Water Sector

• Saudi Arabia

Brief of projects &Tasks

Work EXPERIENCE DETAILS

SENIOR RISK MANAGER

(Nov. 2018 - Present)

RTCC .CO - Riyadh, Saudi Arabia

Saline Water Conversion Corporation (SWCC)

Project Title: JUBAIL RIYADH WATER TRANSITION SYSTEM ( JRWTS) Project Description: Pipe Line project with length 824 Km and 1600 m SAR Responsibilities:

• Establishing and initiate risk management Process, procedure and policy within the organization .

• develop a risk management plan, identify threats and opportunity, risk analysis, develop a risk response plan, and put it in place and monitoring &controlling to ensure Risk Management will be effective.

• Develop the Project’s key risk indicators (KRIs) and risk controls, including thresholds and tolerance, and identifying risk appetite

• Develop efforts to identify project risks to include but not limited to using brainstorming sessions, interviewing experienced project participants and subject matter experts, root-cause analysis, and strengths, weaknesses, opportunities and threats

(SWOT) analysis.

• ensuring that the risk management process is implemented effectively and consistently across the Water Sector.

• Monitoring and Coordinate closely with PMO, Water sector, safety, human resources, legal and estimating while implementing risk management policies and procedure to protect company assets and minimize liability exposures.

• Manage day-to-day interaction between all projects participants. Client's, consultant and subcontractors, including coordination of contract review with legal.

• applying of Quantitative Risk Analysis(QRA) techniques and tools on the risks which its need Quantitative analysis

• Applying The risk management process to all PMO undertakings. establishing, updating, and monitoring the risk management systems employed by the business. This includes the development of risk management procedures and plans which address: risk types; risk impact/likelihood scales for assessing risks; risk tolerance criteria; escalating risks to higher management attention and to facilitate decision-making; and populating, reviewing, and commenting on the content of risk registers..

• Apply risk improvement process to ensure the effectiveness of risk process on the company as whole.

• Communicate with all relevant stakeholder to ensure full understanding for the risk management as a whole.

• Design I.T.M (Interface ‘s Traceability Matrix ) to follow closely all interfaces with stakeholders and define their requirements to meet it.

• Use Data Management System as Opportunity to follow and tracking pipes effectively, that's to avoid any delay and to exploit the new technology in our project this result to decreasing in time and cost and increasing in obtained benefits

• Identify, analyze, track, record and provide guidance with respect to actions to manage and/or mitigate risks.

• Providing technical guidance to less-experienced field engineering personnel.

• reviewing the performance of contractor and subcontractors to assure contract compliance, the application of accepted construction technology and standards, and the acceptable standardization of materials and supplies.

• Assist management in the review of program and project risks during all stages of project development and project construction execution.

• Coordinate with the program, project teams and stakeholders to facilitate the identification of risks and develop and maintain a sense of ownership and responsibility for the risks and associated risk response actions.

• Develop efforts to identify project risks to include but not limited to using brainstorming sessions, interviewing experienced project participants and subject matter experts, root-cause analysis, and strengths, weaknesses, opportunities and threats (SWOT) analysis.

• Develop risk identification checklists based on historical information and knowledge accumulated from similar previous programs/projects and from other sources of information.

• Assist in the recording of identified risks in the appropriate program/project risk register to achieve an increasing level of awareness of risk over time.

• Assist with the prioritization of risks for further analysis or action by assessing and combining the probability of occurrence and impact

• ensuring that the risk management process is implemented effectively and consistently across the

• ensure that all materials used and work performed are in accordance with the specifications.

• resolve any unexpected technical difficulties and other problems that may arise. PROJECT ENGINEER

(June. 2013 till Feb 2017)

AL HOKAIR GROUP C.O - Riyadh, Saudi Arabia

Project Title: OWNER'S PRIVATE COMPOUND (PALACE’S) Project Description: a compound of palaces included of five palaces with budget 350 m SAR Responsibilities:

• Manage and construct Infrastructure, structural work for two Palaces has an area of 18000 sq. a gross Cost 50 million SAR per palace.

• Study shop drawing, evaluate the consistency between structural, architectural, MEP drawings to discover the differences between them to avoid conflicts in the future

• Supervise Construction Crews : responsible for all construction projects and for making sure those projects are completed correctly.

• supervise construction crews and monitor construction sites to make sure plans are proceeding on time and on budget.

• prepare monthly invoices, quantity survey and estimating required budget, manpower and equipment for next work month.

• draw up extensive blueprints and plan for the construction project.

• oversee quality control and health and safety matters on site

• prepare reports as required

• resolve any unexpected technical difficulties and other problems that may arise. RISK & CONSTRUCTION OFFICER

March:2006 – Nov 2012)

ARCHEN ENGINEERING CONSULTANT - Dhahran, Saudi Arabia MOI SAUDI ARABIA

Project Title: Integrated Public Security Operation 911 IPSO Phase 1 Project Description: the projects built and designed to meet the USGBC and the Uptime Institute Tier IV requirements, and also contain state of the art technology and advanced systems.

Responsibilities:

• Mr. Mohamed plays many roles in this project: Sr. Inspector &risk officer, Under general supervision, participates in the development, execution, supervision, and coordination of all technical aspects of field engineering assignments including development of Risk plan, procedures, schedules, and construction methods and systems. SITE ENGINEER

AL HOKAIR GROUP C.O - Riyadh, Saudi Arabia

Project Title: AL OYAYNAH PROJECT VILLAS

Project Description: a project of 512 Villas. 360 m 500,000 m2 – 250 m2 for each one MINISTRY OF HOUSING

Responsibilities:

• Responsible to manage Structural, architectural, and infrastructural works within 64 Villas including the prototype Villa.

• supervise construction crews and monitor construction sites to make sure plans are proceeding on time and on budget

• Add to the responsibilities mentioned above I was responsible to manage the manpower for all the projects ( local and subcontractor manpower).

• material supervisor: inspecting and auditing all the incoming material com into the project. Scheduling all the required material for the project ( my part )and coordinate with the head office to provide it on the required date

• Very interested about applying safety requirements and coordinates with HSE Manager that’s to avoid any Hazard and negative impacts on the workers and project

• act as the main technical adviser on the construction site for subcontractors, craftspeople and operatives.

• check plans, drawings and quantities for accuracy of calculations

• ensure that all materials used and work performed are in accordance with the specifications

• oversee the selection and requisition of materials

• carry out day-to-day management of the site, including supervision and monitoring the site labour force and the work of any subcontractors.

• resolve any unexpected technical difficulties and other problems that may arise. SITE ENGINEER

AL HOKAIR GROUP C.O - Riyadh, Saudi Arabia

Project Title: MARRIOTT HOTEL

Project Description: A multi-story building, hotel suites AL HOKAIR GROUP

Responsibilities:

• supervision and management for all structural and architectural activities and execution and supervision.

• effective leadership the team to achieve the Project goals in executing all activities speedily with high-quality specifications and within time and planned budget

• Achieving project targets within a hard-working environment that need more focusing on organizing and executing these much activity’s.

• daily report about the current day and the plan for the next day

• and weekly plan for the work' and activities based on which he should implement them at the site.

• carry out day-to-day management of the site, including supervision and monitoring the site labour force and the work of any subcontractors.

• oversee quality control and health and safety matters on site.

• plan the work and efficiently organize the site facilities in order to meet agreed deadlines.

• prepare reports as required.

• resolve any unexpected technical difficulties and other problems that may arise. SITE ENGINEER

AL HOKAIR GROUP C.O - Riyadh, Saudi Arabia

Project Title: AL WAFAA TOWER

Project Description: A multi-story building, hotel suites, And furnished apartments 3200 m2 and 11500,000 SAR Responsibilities:

• manage and execute for all structural and architectural activities

• estimating activity cost and duration, lead the team to achieve the Project goals in executing all activities speedily with high quality specification's.

• draw up extensive blueprints and plan for the construction project.

• Obtain All Permits and Permissions : Before construction work can begin the site, all necessary permits I was responsible to obtain it from the city, country, and state governments.

• carry out day-to-day management of the site, including supervision and monitoring the site labour force and the work of any subcontractors

• check plans, drawings and quantities for accuracy of calculations.

• oversee quality control and health and safety matters on site.

• plan the work and efficiently organize the site facilities in order to meet agreed deadlines.

• prepare reports as required.

• resolve any unexpected technical difficulties and other problems that may arise. SITE ENGINEER

October 2012 till June 2013

FTAYRJE C.O - Riyadh, Saudi Arabia

Project Title: (KING ABDULLAH FINANCIAL DISTRICT)

Project Description: Two high rise building

Responsibilities:

• As a site engineer, in a construction on this project high rise buildings, I carried a lot of responsibilities to finish the mission in time and with high cent percent accuracy.

• manage and execute for all structural and architectural activities

• estimating activity cost and duration, lead the team to achieve the Project goals in executing all activities speedily with high quality specification's.

• draw up extensive blueprints and plan for the construction project.

• inspect the activities/work on construction site and ensure that everything is going as per the schedule, plan & design.

• execute the work as the project manager decide, to achieve project management vision in accomplishing the project and did my roles and responsibilities within the project team With dedication and sincerity.

• Prepare and execute schedule for two weeks look ahead.

• Very interested about applying safety requirements and coordinates with HSE Manager that’s to avoid any Hazard and negative impacts on the workers and project .

CIVIL ASSISTANT ENGINEER

June. 2010till October 2012

DRAKE AND SCULL ( AS SUB CONTRACTOR) - Riyadh, Saudi Arabia Project Title: KING ABDULLAH PETROLEUM STUDIES AND RESEARCH CENTER PROJECT (KAPSARC ) Project Description: Two high rise building

Responsibilities:

• As a site engineer, in a construction on this project, I carried a responsibility to finish the mission in time and with high cent percent accuracy.

• manage and execute for all structural and infrastructural activities

• estimating activity cost and duration, lead the team to achieve the Project goals in executing all activities speedily with high quality specification's.

• draw up extensive blueprints and plan for the construction project.

• inspect the activities/work on construction site and ensure that everything is going as per the schedule, plan & design.

• execute the work as the project manager decide, to achieve project management vision in accomplishing the project and did my roles and responsibilities within the project team With dedication and sincerity.

• Prepare and execute schedule for two weeks look ahead.

• Very interested about applying safety requirements and coordinates with HSE Manager that’s to avoid any Hazard and negative impacts on the workers and project .

• oversee quality control and health and safety matters on site.

• plan the work and efficiently organize the site facilities in order to meet agreed deadlines.

• prepare reports as required.

• resolve any unexpected technical difficulties and other problems that may arise. CIVIL ASSISTANT ENGINEER

May. 2007 till Marsh 2010

HOMING ESTABLISHMENT CO - Damascus, Syria

Project Title: EXPANSION OF THE NEW QUDSIA SUBURB (YOUTH HOUSING Project Description: 9 A multi-story building & Two towers ( 10 Levels) Responsibilities:

• As a civil assistant engineer, I carried a responsibility to finish the mission in time and with high cent percent accuracy.

• manage and execute for all structural, architectural and infrastructural activities

• estimating activity cost and duration, lead the team to achieve the Project goals in executing all activities speedily with high quality specification's.

• draw up extensive blueprints and plan for the construction project.

• inspect the activities/work on construction site and ensure that everything is going as per the schedule, plan & design.

• execute the work as the project manager decide, to achieve project management vision in accomplishing the project and did my roles and responsibilities within the project team With dedication and sincerity.

• Very interested about applying safety requirements and coordinates with HSE Manager that’s to avoid any Hazard and negative impacts on the workers and project .

• oversee quality control and health and safety matters on site.

• plan the work and efficiently organize the site facilities in order to meet agreed deadlines.

• prepare reports as required.

• resolve any unexpected technical difficulties and other problems that may arise.

• Survey quantity for all constructed activities - structural, architectural and infrastructural activities- CIVIL ASSISTANT ENGINEER

Aug. 2002 till May 2007

HOMING ESTABLISHMENT CO - Hama, Syria

Project Title: SUBURB OF ABU AL FEDA (YOUTH HOUSING) Project Description: Two towers ( 9 Levels) each level 9 departments + 5 multi-story building Responsibilities:

• Survey quantity for all constructed activities - structural, architectural and infrastructural activities-

• oversee quality control and health and safety matters on site.

• plan the work and efficiently organize the site facilities in order to meet agreed deadlines.

• prepare reports as required.

• As a civil assistant engineer, I carried a responsibility to finish the mission in time and with high cent percent accuracy.

• manage and execute for all structural, architectural and infrastructural activities

• estimating activity cost and duration, lead the team to achieve the Project goals in executing all activities speedily with high quality specification's.

• draw up extensive blueprints and plan for the construction project.

• inspect the activities/work on construction site and ensure that everything is going as per the schedule, plan & design.

• execute the work as the project manager decide, to achieve project management vision in accomplishing the project and did my roles and responsibilities within the project team With dedication and sincerity.

• Very interested about applying safety requirements and coordinates with HSE Manager that’s to avoid any Hazard and negative impacts on the workers and project .

Personal Information

• Birth Date: 22/06/1979

• Gender: Male

• Nationality: Syria

• Visa Status: Residency Visa/Transformable.

• Residence Location: Riyadh, Saudi Arabia

• Marital Status: Married

• Driving License Issued From: Saudi Arabia

• Nationality Syria

● language:

* Arabic Native * English: Flaunt

INTERESTS

READING

CYCLING

CHEES

SAILBOAT

ROMAN WRESTLING



Contact this candidate