Post Job Free

Resume

Sign in

Mechanical Engineer

Location:
Grand Blanc, MI
Posted:
August 31, 2020

Contact this candidate

Resume:

RIFAT BIN ISLAM, EIT

Grand Blanc, MI- *****, willing to relocate, 318-***-****, adfqlm@r.postjobfree.com, LinkedIn

Seeking a challenging opportunity in the MEP Industry as a Mechanical HVAC Design, Energy Modeling and BIM Engineer.

SUMMARY

MS in Mechanical Engineering; LEED Green Associate; Experienced in AHU and Hydronic System.

4+ years of experience in Drafting with Revit, AutoCAD, Autodesk Inventor and 2D/3D CAD modeling with SolidWorks.

2+ years of experience in Energy Efficient HVAC Design, Sustainable Building Design and Energy Modeling.

1+ years of work experience in product design and development, testing and validation & cost management.

Experienced in Heat Transfer, Fluid Mechanics, Thermodynamics, FEA and CFD analysis and GD&T.

SOFTWARE SKILLS

Revit MEP, AutoCAD, Navisworks, CADmep, Equest, Trane Trace 700, Energy Plus, HVAC Solution.

Bluebeam Revu, Foxit, MS Word, Powerpoint, Excel, Outlook, Matlab, Adobe Illustrator.

EDUCATION

M.S. Mechanical Engineering (08/2018); Louisiana Tech University; Ruston, LA, USA.

B.S. Mechanical Engineering (09/2015); Bangladesh University of Engineering & Technology; Dhaka, Bangladesh.

WORK EXPERIENCE

TMI Climate Solutions, Project Engineer, Grand Blanc, MI, (12/2019 - Present)

Designed Modular Air Handling Unit, Chiller, Cooling Tower, Steam Plants and associated ducts and hydronic Piping Systems, Major Equipment layout, Plant Layout, Pipe and Duct Supports using Revit and AutoCAD.

Created piping P&IDs, Bill of Materials, Schedules, Mechanical submittals and Operations & Instrumentation Manuals.

Reviewed all Engineering, Design and Construction documents and put markups if necessary.

Conducted clash detection of Pipings, Ducts and Electrical Conduits using Navisworks.

The Hart Companies, Design Engineer, Cumberland, RI, (02/2019 – 10/2019)

Sanitary, Non Sanitary Process Piping design from Isometric drawings and P&IDs and in Revit.

Designed new and demo HVAC zoning, duct distribution, pressurization, airflow diagram, in Revit and Autocad.

Designed new and demo Plumbing and Fire Protection system in Autocad.

Validated all Piping and Duct drawings in Navisworks to find out any clashes of pipes and ducts.

Worked with project managers for load calculation using Trane Trace 700, new unit selections and made Schedules.

Used ASME B31 and IFGC codes and standards for natural gas, Hot, cold, glycol water supply and return piping.

Used NFPA, IMC, and ASHRAE standards for fire safety, indoor air quality and exhaust air regulations.

Louisiana Tech University, Graduate Research Assistant, Ruston, LA, (09/2016 – 08/2018)

Research Assistant in the Sustainable Energy Efficiency Devices and Energy Modeling Lab.

Worked on multiple projects for design, simulation, load calculation and Building Information Modeling (BIM) with Autodesk Inventor, SolidWorks, Equest, Trane Trace 700, Energy Plus etc.

Fair Distribution Ltd, Design Engineer, HVAC R&D, Dhaka, Bangladesh, (03/2016 – 08/2016)

Designed and drafted HVAC system for commercial and Residential building using Revit and AutoCAD.

Calculated Heating and Cooling Load using Trane Trace 700.

Excellent Project Management Skill, Completed multiple projects under a tight deadline concurrently.

DBL Ceramics Ltd, Process Engineer, Gazipur, Bangladesh, (09/2015 – 02/2016)

Designed general layout and piping layout of the plant using Autocad.

Performed Product testing, validation and release, Tolerance stack-up analysis according to GD&T standards.

PROJECTS

ALNYLAM Process Piping, The Hart Companies:

Designed process piping in Revit and Navisworks and created P&IDs from as built Isometrics.

ASME piping codes and standards were maintained.

Cleanroom HVAC system design for GE Healthcare, The Hart Companies::

Designed duct distribution, zoning, pressurization and airflow diagram with Bluebeam, Autocad.

Calculated CFM and ACH for ISO 7 and 8 standards cleanroom.

Bio Safety Lab Design for GE and Rubius, The Hart Companies::

Designed fire protection, plumbing, duct drawing for cleanroom and office space with Autocad.

Made schedules and PFDs for new Air Handling Units, Hepa Filters, Dampers, exhaust fan, Boilers etc.

Energy Modeling of a Prototype Building for Advanced Thermodynamics Course, Louisiana Tech University:

Energy modeling of a prototype building was done with Equest and Energy Plus.

Used ASHRAE Standards 140 and 189.1 for Sustainable Green Building Design.

Simulation of HVAC System Design for Cleanroom Contamination Control, Louisiana Tech University:

HVAC System of Louisiana Tech University Cleanroom was designed and simulated in AutoCAD and SimScale.

ASHRAE standard 62 was used for acceptable indoor air quality for controlling Contamination.



Contact this candidate