RESUME FOR: QA/QC-inspector
Name : V I G N E S H .B
Mail ID: ************@*****.***
Phone: India+919*********)
Objective:To make use of my academic knowledg In the job to be offered to me and learn more from it.
EDUCATION QULIFICATION:
o DIPLOMA IN MECHANICAL ENGINEERING
Passedout: 2012
Percentage: 68%
PROFESSIONAL QUALIFICATION:
o CSWIP 3.1-TWI Certified Welding Inspector
o ASNT LEVEL II
o Project Planning Mangagement(primaversP6)
o Auto cadd
COMPUTER PROFICIENCY:
o Window vista, XP,WIN 7,8.
Function strengths:
o Preparing of Iso-metric as builts as per the site modification in CADD & Hand sketch o Preparing of HYDRO TEST PACK
Working History:
Company:Tata projects Ltd, India
Position : Quality control Inspector from (June2019 to Feb 2020) Projects: Liwa plastic project & Lekwair combined cycle powerplant, Oman. Client : Orpic & Petrolium development Oman
Company: L&T HYDROCARBON ENGINEERING LIMITED, Kattupalli, Chennai.
: Quality Inspector from (May 2017 to 2019 june)
( USA) & FARABI PETROCHEMICALS (Saudi Arabia)
Client: FLUOR inc. / Ferabi Saudi Arabia/Air products - BPCL refinery India. Company: Rotary Mechanical&Construction company pte Ltd,Singapore. QC-inspector from(14/10/2016)to(4/1/2017)
Projects: 1.Fabrication of chlorine vapouriser skid for chemical industries 2. JSP jurong synthetic plant piping (fire water line) Client: AMEC Foster Wheeler & Exon Mobil
Company: AFCONS INFRASTRUCTURE LTD,Gujarat.
: QC Engineer from March2016-May2016
Reliance (Shut-down project)
HP IB –High Purity Iso-Butylene in Reliance Refinery Jamnagar COMPANY: Al-muntazer Trading & Contracting co.will, KUWAIT. Designation: QA/QC –INSPECTOR from April2014 to March2015 AGRP/NAGRP New acid gas removal plant
KNPC Kuwait National Petroleum Company
Technimont
Shut-down project
Project : Execution of Engineering Projects During TA-2014 Client : PIC Petrochemical Industries Company Kuwait
: Al-muntazer Trading&Contracting co.will.
APPROVAL : As QC-supervisor in TA-2014
Duration : 58Days
COMPANY:Fenerve BuildingsThuvakudy,Trichy
Designation:QA/QC Asst-Engineer from (2.5.2012)to(10.3.2014)
Duties&Responsibilities: Piping
o Material inward inspection for (Pipe,Flanges,Fittings) refer document secII & B16.5 for flange face serration, pipes(ASTM A53 Gr B, A 106 Gr B)fittings(ASTM A 105,ASTM A 234), flanges(ASTM A 105 CL-300),IBR,NACE,LTCS as per project requirment o Controlling the welding cosumables as per procedure o Material clearance by report wise for fabrication of spools o Internal cleaning inspection for all pipes before FIT-up o FIT-up clearance according to iso spool number refer document,Fit-up report, ISOMETRIC drawing, WPS(root gap,bevel angle,root face) INSPECTION TOOL (Taper gauge,Hylo gauge,BGM) o SEAM STAGGERING has to fallowed for all long seam pipesbefore FIT-UP o Weld visual refer document weldvisual report, welder number, wps number, welding process witness and holdpoint as per ITP, Acceptance criteria B31.3 o NDT clearance by buffering welding joints by LINE service PERCENTAGE as per project spec, buffering by eALPS electronic application perform by inspector login ID o Covering the NDT Performed joints by welder vise percentage o PMI inspection for ss 304\304l and 316 material, review the chemical compositions ( molybdenum, chromium, nickel)
o Ferrite inspection witness as per project spec
o Hardness inspection to check yield point in weldmetal,heat affected zone,by Line service percentage PWHT spool 100% hardness
o Final DIMENSION units mm, feet inch,ROLLING,ORIENTATION,inspection for spool o Line walk inspection as per approved ISO drawing o Punchlist preparation as per catogery
o Test pack preparation with approved P&ID,Line list,ISO drawing o (A )Punch closing before hydrotest
o Relesing for hydrotest
o Hydrotest witness as per test pressure
o Re-instatement closing
Duties&Responsibilities: structure
o Primary structure&secondary structure Alignment&elevation for (column,connecting beam,Handrails,Gratings)
o As per the ASME standard&procedure to ensure the column,beam,handrails,grating installations,toe board,ladders,
o Tighting of connecting fasteners as per the standard of Method statement o Inspection on pipe supports,
o Dimension check for Flange,web,stiffner&gassetplates, as per the fabrication drawing o FIT-UP&WELD visual according to modification
o Weld visual
o NDT(penetrant test as per the ASME code Sec:V,SE-165,) o Preparing the punch points and rectifying.
o Walkdown inspection with clients& contractors
Extra curricular:
o Won first prize in Zonal&District Level prize in volley ball o Won first prize in inter school competition in volley ball Personal Profile:
Name:- B.VIGNESH
Date of Birth:- 30.12.1990
Father Name:- T.BALU
Passport No:- J98 55 875
Nationality:- INDIAN
Marital status:- Single
Language:- English&Tamil
Address:- C43,
Municipal Colony 9th cross,
Medical College road,
Thanjavur-613 007.
Declaration:-
I hereby declare that the above written particulars are true to the best of my Knowledge. Date: Yours Honestly