OBJECTIVE:
Energetic civil engineer with ** years’ experience as a High
Management Engineer, I have acquired knowledge on process simulation, optimization and integration, inherently safer buildings, compounds and factories.
In an effort to enhance my knowledge and further my career, I’d like to bring these skills to achieve goals to your company as I’m seeking an opportunity in the field of civil engineering where my academic background and technical skills would be employed and further enhanced.
EDUCATION:
University: Bachelor of Engineering, Zagazig University
(Located in Shoubra, Cairo, Egypt).
Major: Civil Engineering.
Year of graduation: 2005.
Project: Rail Way Project.
Project’s grade: Excellent.
Secondary School: St. Fatima School (Language School). WORK EXPERIENCE:
Aug 2014 – Nov 2019: Projects Cost Control & QS Manager Location: Doha, Qatar.
Company: Albandary Engineering & Trad. Cont.
Responsibilities:
1- After contract award, ensure the implementation of the Cost Control System, elaborating the consolidated Cost Breakdown Structure according to the relevant procedure, reviewing the procurement/accounting system adopted at each operating company involved with the project.
2- Split the Commercial Budgets in order to report revenues/costs by entity, currencies, and prepare cash flow by currency. 3- Ensure the cost control system works effectively and cost status is assessed and reported.
4- Monitor activity progress and the relevant earned value, as well as value of work done, against invoices received, determining monthly accruals and generating accounts in line with works progress.
5- Follow up the Project Budget.
6- Preparation of a Budgeting and Cost Management reports including updates.
7- Follow up of all contractual issues and monitor their cost impact. 8- Obtain the budget costs of system, assemblies, equipment, materials and labor.
9- Analyze invoices to ensure correct products/services were received at the expected cost.
10- Monitors projected expenditure against allowances made in the approved budget estimate.
PERSONAL INFO
11- Review and approve contractors/consultants invoices and ensure that the accurate process takes place within time. 12- Analyze cost impact of scope changes and trends. 13- Administer and update Projects Costs Database which includes collecting relevant project information from the various disciplines.
14- Prepare cost progress reports, performance reports (CPR) based on earned value with full commitment in submit it on time. 15- Prepare effective cost forecast analysis and recommendations, including the use of all associated information and tools. 16- Study on procurement strategy with purchasing manager and advising on favorable strategy to reduce cost.
17- Making timely and accurate Interim Applications for Payment. 18- Ensuring Interim Applications for Payment are presented in a constantly updated and standardized format, ensuring clarity to enable the Client QS’s to readily identify Contract variations as they arise.
19- Timely include all variations and changes in all Interim Applications for Payment including collation of necessary supporting information.
20- Engagement with Sub-Contractors to agree value of work done, variations and any substantiation required.
21- Understanding the implications of Health and Safety regulations. 22- Creation of formal correspondence to the installation company with regards of claims and deviations (e.g. notices letters and approvals in order to safeguard contractual position). 23- Ensure that documentation of claims/deviations are done in a structured way and compile back-up documents and prepare installation related Project Variation Offers towards the customer and formal statements on claims.
24- Preparation and update regularly claim/ deviation reports and monitoring of all installation activities on site and approve quantities and deviations together with the Project Manager Commercial, Project Manager / Project Director and Site Manager. 25- Management of Field Work Orders at site.
26- Handling, controlling and approval of documents for payment release of invoices from subcontractors.
27- Responsible for claim, variation and change management related to subcontractors works.
For projects:
1- National Service Academy Training Camp @ AL-MAzrouah
(Design & Build)
• Land Area 400000 m2, BUA 155000 m2.
• Phase 1 with Cost = 730,100,000.00 Qr.
Buildings:
11 Accommodation Buildings (3300 Person) (G + 2 Floors).
3 Indoor Swimming Pools (Training, Olympic & Diving Pools).
Collage + Classes (Training) (1000 Person) (G + 2 Floors).
Hotel Services (70 Room) (G + M + 2 Floors).
Cinema & Indoor Theatre (3000 Person).
Kitchen & Dinning (3200 Person).
2 Showers & Separate Toilets Buildings.
PERSONAL INFO
Sports Training Field Building.
Uniform Warehouse Building.
Hobbies & Library Building.
Civil Defense Building.
Sports Yards. Masjid (3200 Prayer).
Football Yard. Health Center Building.
Basketball Yard.
Sports Building.
Tennis Yard.
Engineering Building.
Volleyball Yard.
Petrol Station.
Mini Ball Yard.
Security Building. Observation Towers.
Security Gate. Substations Buildings.
2- National Service Academy Training Camp @ AL-Mazrouah
(Design & Build)
• Land Area 600000 m2, BUA 140000 m2.
• Phase 2, 3, 4 with Cost = 1,450,000,000.00 Qr.
Buildings:
A. Phase 2 Buildings: Capacity for 12000 Students.
Prep. & Secondary School+2 Annex Building+2 Green House.
Preparatory & Secondary Accommodation Building (G + 1 Floor).
2 Substation, 2 LPG Tanks & Under Ground Water Tanks.
2 Football Yards, 2 Hand Ball & 4 Basket Ball Yards.
Main Gate Building.
Infra Structure Works.
B. Phase 3 Buildings:
2 Rehabilitation & Physiotherapy Center Buildings for Men & Women.
2 Multi-Function Sports & Obstacle Buildings for Men & Women.
2 Check Up Center Buildings for Men & Women.
2 Training Buildings for Men & Women.
Gun Paint Administration Building.
Physical Development Center.
3 Maintenance Buildings.
Masjid (G) .
Gun Paint Ball Building.
Engineering Building.
Parkour Building.
Main Gate Building.
Infra Structure Works.
3 Substations Buildings.
2 Observation Tower
C. Phase 3 Buildings:
2 Rehabilitation & Physiotherapy Center Buildings for Men & Women.
2 Multi-Function Sports & Obstacle Buildings for Men & Women.
2 Check Up Center Buildings for Men & Women.
2 Training Buildings for Men & Women.
Gun Paint Administration Building.
Physical Development Center.
3 Maintenance Buildings.
Masjid (G) .
Gun Paint Ball Building.
Engineering Building.
Parkour Building.
Main Gate Building.
Infra Structure Works.
3 Substations Buildings.
2 Observation Tower.
SOFT SKILLS
D. Phase 4 Buildings:
Covered Arena Building.
2 Covered Stage Building.
2 Arena Horse Walkers.
Waiting Stable Building.
Open Arena Building.
Vitrine Clinic Building.
Horse Training Pool
Building.
Farrier Building.
Horse Training Centre
Building.
Mechanical Building.
Storage Building.
Chiller Yard.
Sewage Treatment Plant.
6 Substations Buildings.
Gas Room.
Maintenance Store
Building.
4 Observation Towers.
Truck Garage & Garbage
Building.
2 Labor Accommodation
Buildings.
Main Gate Building.
Infra Structure Works.
3- Naval Academy Training Camp @ AL-Rewais (Design & Build)
• Land Area 320000 m2, BUA 50000 m2.
• Project Cost = 290,000,000.00 Qr.
Buildings:
Junior & Senior student accommodation (G+1).
Trainee student accommodation (G).
Education building (G+1).
Labor Accommodation (G).
Engineering building (G).
Multi-Purpose Hall (G).
Apartment unit (G+5).
Kitchen and mess (G).
Conference hall (G+1).
3 Substations Buildings.
Firefighting tank (G).
Ammunition store (G).
Masjid (G).
Clinic (G).
Store Building (G).
3 Main gates (G).
Guard house (G).
Domestic Tank (G).
Irrigation Tank (G).
LPG Tank (G).
Holding tank (G).
Lift station (G).
Infra Structure Works.
4- Construction of 17 Residential Buildings (2B+G+4+Roof Floors) FOX HILLS LUSAIL
• Project BUA 36000 M2.
• Project Cost 320,000 QR.
• Project Time Schedule 24 Months.
Jun 2012 – Aug 2014: Site Technical Office Manager Location: Doha, Qatar.
Company: Albandary Engineering & Trad. Cont.
Responsibilities:
1- Review technical submissions and design layouts as well as material submittals from contractors.
2- Plan and maintain project budgets and schedule planning activities with team and managers.
HARD SKILLS
3- Attend progress and technical meetings, discuss and suggest technical proposals.
4- Coordinate with quantity surveyors or payment applications and change orders.
5- Manage the Technical Office teams on Technical and Department issues.
6- Supervise the review and approvals of shop drawings, Material Submittals with respect to the project Specification and Standards of practice submitted by contractors.
7- Continually review the contractor’s construction schedule during the progress of site works.
8- Review the contractor’s List of Deliverables (Submittal of Drawings, design and Materials) as well as ensures the compliance with the contract and project requirements.
9- Support review of subcontractors' invoices, when required for technical assistance.
10- Taking part in the project management review and risk management review.
11- Managing the cost analysis and cost control of site activities. 12- Coordinating with quantity surveyors or payment appreciations and change orders.
13- Taking part in the contractual aspect of projects. 14- Maintaining organized and detailed records and documents of all projects (i.e. working drawings, quantity surveying, purchase orders … etc.) and coordinating with different teams to get these documents issued.
15- Review third-party invoices & client invoices. 16- Following site design and project management in all phases of design, governmental regulations, project, and client management. 17- Communicate with clients, consultants & subcontractors to facilitate required information to the technical team. 18- Justify contractual claims to contract team to facilitate the required communication with the client.
19- Revise the invoices (owner/Subcontractors) coming from the site to make sure that it’s according to plan and contract terms. 20- Coordinate between all traits on drawings in case any conflicts or differences between the drawings and the client needs and to send an RFI job requirements.
Mar 2010 – May 2012: Senior Cost Control Engineer
Location: 10
th
of Ramadan, Egypt.
Company: Energya Steel Fabrication Co.
ELSEWEDY
Responsibilities:
1- Manages multiple construction projects simultaneously in an organized manner.
2- Prepare a monthly cost report showing the possible savings or overruns for all project cost disciplines.
3- Allocate the project expenditures according to the specified project budget.
4- Update budget at forecast quantity and forecast cost periodically. COMPUTER SKILLS
5- Highlight any major cost variances and advise the project management and other respective site staff for their timely corrective actions.
6- Analyze the impact of change orders on project budget. 7- Observe site operations, compare with budget, suggest comments and reflect the project performance in the forecast calculations. 8- Check all project invoices, all other project cost documents and make sure to avoid misallocations.
9- Co-ordinate with sub-contracts department to avoid cost impact terms in sub-contracts under preparation.
10- Give a realistic cost related feedback that should help when estimating similar projects.
Review investment project risks and risk mitigation measures. 11- Assists Manager with any cost reports necessary. Jan 2008 – Feb 2010: Senior Projects Coordinator
Location: 6
th
of October, Egypt.
Company: National Steel Fabrication Co. (NSF)
ORASCOM
Responsibilities:
1- Manage more than one project at a time, making sure that all the projects under my supervision are going on smoothly. 2- Maintaining the project planning and scheduling and follow up the project during all the project activities to achieve the project time schedule.
3- Evaluates all the contractual correspondence, contract compliance, provide the contractual advice to the Management team, maintain records, evaluated and recommend claims.
4- Developing and maintaining cordial relationships with clients and team members.
5- Minimize wastages through Budgets, material (projects status), Earned Revenue, and Purchase order revision, Stores Coding and issuance, Contraction Final Amount and Quantities, to be compared With Invoices and the Percentage of Completion, (WIP) Work in Progress and the performance (Labors).
6- Investigating deviation between the Projects Final Profit and the Earned Revenue.
7- Making Cash Inflow Budget expected for every year. Jan 2006 – Jul 2007: Projects Estimator Engineer
Location: 6
th
October, Egypt.
Company: National Steel Fabrication Co. (NSF)
ORASCOM
Responsibilities:
1- Estimating the Steel Structure (Cement Factories, Bridges, Building, Equipment, Pressure Vessels, Piles, Fan tower). LANGUAGES
2- Studying and checking Technical Specifications and Contracting Conditions and all related analysis and Data Sheets, Estimated man-hour for the Project, the Painting (Supply or Apply) and Packing and the Site Erection Costs.
3- Evaluating Projects Budget, Cost analysis, the Project Expected Profit from its tendering Stages which include the material Take– off and Prices Unit rate for the Client Drawing.
Aug 2005 – Jan 2006: Projects Production Engineer
Location: 6
th
October, Egypt.
Company: National Steel Fabrication Co. (NSF)
ORASCOM
Responsibilities:
1- Managing and Controlling a Bay with 50 workers for fabrication Steel Structures.
2- Following up all stages of fabrication beginning with the shop drawings issued then fabrication, Welding, inspection, testing, cleaning, release for painting up to handing over to the client. Training:
Jul 2003 – Aug 2003: Site Engineer
Location: Ain Shams University, Cairo, Egypt.
Company: Arab Contractors Co.
Certificates, awards and recommendations will be furnished upon request. HOBBIES
HOBBIES