Electrical Superintendent Al-Jubail KSA. Cell Phone # 053******* adfp1f@r.postjobfree.com Summary:

Engineering professional offering 17+ years of experience in Construction, Project Management and provisioning, deploying, supporting electrical associated systems in an engineering environment. Highly skilled in construction, planning and analysis with strengths in project management. Throughout my working experience, I have been engaged in the field of Electrical Engineering, Mechanical Engineering coordination, construction, Project Management, Field execution, commissioning, mechanical completion, quality control and Project management including HSE (Health, Safety & Environment) in industries (OIL, GAS, Power, Pipe line Projects) and infrastructure ( building projects). Professional Qualification;

Bachelor of Technology (Electrical),PAKISTAN

Training Certificates;

Special Technical Course (WAPDA)

Fundamental Management Course (M-300-WAPDA)

Line Superintendent Training Course (T-500 technical-WAPDA)

Behavior Observation Team Training (BECHTEL at KGP, KSA) 1. Employer: HITACHI KSA

Position Chief Superintendent (E & I)

Project JRUP EPC-13 PROJECT KSA

Client Saudi Aramco, KSA

Duration 01-05-2017 to date

2. Employer: HAJCON KSA

Position Electrical Superintendent

Project SDOHP PROJECT KSA

Client Saudi Aramco, KSA

Duration 01-12-2015 to 31-12-2017

3. Employer: SOFCON KSA

Position Discipline Engineer (E & I)

Project GOSI PROJECT Jubail KSA

Client GOSI

Duration 24-06-2013 to 30-08-2015

4. Employer: TECHNIP Italy spa. KSA

Position Electrical Superintendent

Project JERP-SATORP

Client SATORP

Duration 01-01-2011 to 01-06-2013

Page 2 of 6

5. Employer: Consolidated Contractor Company (CCC) KSA Position Site Engineer (Electrical)

Project KGP (Khursaniyah Gas Plant), Jubail

Client Saudi Aramco, KSA

Duration 06-09-2006 to 30-10-2010

6. Employer: Multan Electric Power Company (WAPDA) Multan Position Line superintendent (Elect)

Project O&M of 132-kv Grid station and Residential Colony. Client WAPDA, Pakistan

Duration 01-07-2002 to 01-08-2006

Professional Profile;

1. Employer: HITACHI KSA

Position Chief Superintendent (E & I)

Project JRUP EPC-13 PROJECT KSA

Client Saudi Aramco, KSA

Duration 01-12-2015 to date

JOB RESPONSIBILTIES;

Oversee the implementation of scheduled construction activities of Electrical System at JAZAN Refinery utilities Project include,

Building:

1. Sub-station GIS 132 KV ( 03 Buildings ), 13.5 KV ( 03 Buildings) 2. Operation and Maintenance (01 Building)

3. Refinery Central Control Building (01 Building) 4. Operation Shelter (03 Building)

5. Pump Stations (PS - 05 Nos)

6. Project Interface Building (PIB - 02 Nos )

7. STG Building ( 2 x 14MW _01 Building )

8. Emergency Diesel Generator Building ( 01 )

Process Area

1. Power Distribution (up & down stream)

2. 132 KV (12 Feeders)

3. 13.5 KV (000 Feeders)

4.

Communicate and motivate different nationalities Electrical supervisors to increase their productivity and meet work goals.

Align on weekly targets with project management team and reporting on progress.

Maintain knowledge of electrical materials in warehouse.

Advice, coordinate and assist other department for technical problems concerned with installation, modification and re-route of electrical assignments.

Ensure that company is stocked with all necessary supplies of direct and consumable material for the project.

Page 3 of 6

Follow up with procurement department for purchasing the needed supplies.

Attend weekly progress meeting with Project management team.

Weekly walkthrough with client at site.

Coordinate with engineering department to resolve the Engineering issues during construction. 2. Employer: HAJCON KSA

Position Electrical Superintendent

Project SDOHP PROJECT KSA

Client Saudi Aramco, KSA

Duration 01-12-2015 to date

JOB RESPONSIBILTIES;

Monitor the site construction activities (Cable Pulling LV, MV & EHT, and Installation of Sub-Station 38.5 KV and Mini pillar) and report work progress and provide technical assistance for construction problems.

Monitors and record deviation of work in the field from execution plan.

Conducting meeting with the contactor and client for the construction activities.

Attend the project meeting and coordinate with other engineering activities.

Prepare and get approval of various electrical related drawings.

Supervise the preparation of technical inquiry request to vendors.

Interface and regular meet with client and vendor representatives.

Interface and provide clarification and technical support to the subcontractor. 3. Employer: SOFCON KSA

Position Discipline Engineer (E & I)

Project GOSI PROJECT Jubail KSA

Client GOSI

Duration 24-06-2013 to 30-08-2015

JOB RESPONSIBILTIES;

Construction of 437 villa, 18 apartment, 01 lift station, 08-fire pump station, 02-Mosque, 01 KG school and MEP INFRA at GOSI Project Jubail KSA.

Supervise the team of engineers working with me, the Superintendent, supervises one or several supervisors of the discipline. (HVAC, Plumbing, Piping, Electrical and Fire alarm System).

Involved in project from the concept and detail of the design through to implementation, testing and handover. As well as having strong technical knowledge, commercial awareness, additional attributes, such as team leadership, management skills and able to manage the multitask project.

Issues all work orders (engineering request and variation submitted by contractors) describes the works to be implemented, requests for an estimated price, issues the work order, initiates numbering and makes all involved functions approve.

In due time expedites, checks and approves attachments for work orders close-out.

Take all the necessary measures to ensure that the works entrusted to the contractors under my supervision are carried out in strict compliance with the site H.S.E. requirements, the quality, technical, and financial and schedule requirements of the contracts, and sound engineering practices.

Assist Construction Contractors.

Support the Site HSE&S Manager to check Construction Contractors safety plans

Supervision of subcontractor's Quality Control activities. Page 4 of 6

Check all Construction Quality Control Plans issued by Construction Contractors on the basis of Contractor Quality Control Procedures.

Together with the Quality Manager, coordinate with CLIENT in matters pertaining to quality control, inspection and testing.

Monitor and audit erection Construction contractor's quality control activities.

Witness hold points of the Field Quality Control Plans.

Finally sign the Sites Inspection and Test records.

Check the completion, the validity and traceability of documents included in the Construction contractor’s final dossiers.

Issue Site Inspection Reports, initiate nonconformance reports (NCR).

Check that corrective actions have been performed.

Check that Quality Records are adequately controlled and filed.

Propose feedback sheets.

Check that all Construction Contractors organization people on the Site are in sufficient number and with suitable qualification to manage all activities and provide continued supervision of the works, expedites time sheets.

Issue whenever necessary to the Construction Superintendents and Construction Contractors a list of available work fronts.

Verify the adequacy of Construction Contractors equipment to perform the required work.

Check the list and revision number of documents transmitted to Construction contractors.

Check materials supplied by contractors upon delivery at their point of production for compliance with the approved specification.

Check the preservation by Construction Contractors of materials taken out from material storage.

Review and approve the progress proposed by Construction Contractors.

Analyze additional work and modifications to determine the cause and propose the solution to be implemented.

Analyze and technically approve requests for variations submitted by Construction Contractors.

Assist Construction contractors, check Construction Contractors method statements and work procedures.

Attend the meetings with Construction Contractors.

Record daily area activity in a log.

Manage work acceptance operations and follow-up of the punch lists. 4. Employer: TECHNIP Italy spa. KSA

Position Electrical Superintendent

Project JERP-SATORP

Client SATORP

Duration 01-01-2011 to 01-06-2013

JOB RESPONSIBILTIES;

Monitor the site construction activities (Cable Pulling LV, MV & EHT, and Installation of Power Transformers at GIS Sub-Station 132 KV- 38.5 KV) and report work progress and provide technical assistance for construction problems.

Monitors and record deviation of work in the field from execution plan.

Conducting meeting with the contactor and client for the construction activities.

Attend the project meeting and coordinate with other engineering activities.

Prepare and get approval of various electrical related drawings.

Supervise the preparation of technical inquiry request to vendors.

Interface and regular meet with client and vendor representatives. Page 5 of 6

Interface and provide clarification and technical support to the subcontractor.

Interact with Quality Assurance department for quality issues, and ensure compliance with company's ISO quality procedures.

Responsible for coordinating the team to complete the task way ahead of deadline.

Identification and preparation of scope of work for the various contractors.

Monitor and keep the up to date status for the electrical materials availability in site as per the schedule time.

Coordinate with the sub contactor for the construction activities.

Reviewed engineering plans, specifications, project schedules, designs, circuit diagrams, and estimates for construction.

Maintained effective working relationships with field crews, contractors, vendors.

Monitoring the progress of works and preparation of weekly reports.

Preparation of Technical submittal schedule, Submission and follow-up for approval.

Helping and consulting with other team members in resolving unusual and complicated problems related to new development and Construction support.

Project Progress Monitoring and generation of necessary reports for higher management highlighting the problem areas and suggesting solutions.

Responsible for the execution of Electrical Distribution System.

Monitoring and ensuring the installation of Power transformer, switch gears, Motors, MOV, XVM valves, Electrical panels and relevant Electrical accessories.

Monitoring & ensuring the on time job completion of the cable laying, grounding works and lighting system.

Familiar with international standards, IEC, NEC, NEMA, IEEE in order to follow the quality work.

Coordination with document control system to ensure availabilities of current client engineering & specification as per project quality record.

Plan the shutdown activities for the execution.

Coordinated with the operation department for the proper functioning of the electrical system. 5. Employer: Consolidated Contractor Company (CCC) KSA Position Site Engineer (Electrical)

Project KGP (Khursaniyah Gas Plant), Jubail

Client Saudi Aramco, KSA

Duration 06-09-2006 to 30-10-2010

JOB RESPONSIBILTIES;

Construction of power substation 38.5kv (SS-113, SS-114) along with PIB Building for the NGL Unit.

Responsible for the observance of safe work practices with in the field and ensures that applicable safety procedures and regulation are observed by the personnel under the individuals' jurisdiction.

Coordinates with other group's leaders within the construction department on projects requiring multi-discipline personnel.

Liaison with client, during inspection for new construction as well as maintenance and refurbishment as per contract requirement and standards.

Detail construction drawing review, follow of quality control manuals, QA/QC procedures and inspection and test plan for main and subcontractor during construction & maintenance.

Review the future work to be carried out by Electrical section and maintains up-to-date records and projects files.

Responsible for all routine administration duties relating to the Electrical section, this includes the preparation of daily and monthly reports.

Good awareness of proper man-management techniques in order to motivate and control a multi- national workforce to enhance the company's prestige. Page 6 of 6

6. Employer: Multan Electric Power Company (WAPDA) Multan Position Line superintendent (Elect)

Project O&M of 132-kv Grid station and Residential Colony. Client WAPDA, Pakistan

Duration 01-07-2002 to 01-08-2006

JOB RESPONSIBILTIES;

Installation of Equipment in sub-station which are as under,

Switch gear, transformer, bus bar, space heater.

UPS panel, battery, IRP panel, annunciator panel.

Lighting JB, Sockets, and Welding receptacles.

LV, MV, HV Cables, Motors, anode (Cathode protection)

Grounding Connections (Thermo weld / Cade weld)

Cable tray, Conduit works (underground/over-head)

Road Lighting System.

Computer Proficiency;

Well Conversant with MS Office & Auto-Cad.

IQAMA Details;

Iqama No 240-***-****

Place of issue Ras-Tanura KSA

Driving License;

Valid Light Driving License (KSA)

References:

Yoshinori Mihara adfp1f@r.postjobfree.com

Site Manager HITACHI

Emam Abdel Moneim adfp1f@r.postjobfree.com

Project Manager SOFCON

Mario Anelli Mario Anelli/TECHNIP-ITALY@TPGROUP

TECHNIP Site manager Package - 5A SATORP

Fausto Fiorucci Fausto Fiorucci/TECHNIP-ITALY@TPGROUP TECHNIP Engineering Head Package - 5A SATORP

Edgar Delacruzi adfp1f@r.postjobfree.com

SATORP PMT Electrical Package - 5A

C.S Velan adfp1f@r.postjobfree.com

Construction Manager E&I – L&T SADARA



Contact this candidate