CURRICULUM VITAE

Mohammed Shahzada Pervez

Mob# +919********* / +965-********

QA/QC Engineer E& I

Objectives & Goals:

Aspiring a challenging and dynamic career in Quality Assurance Quality control department where I can apply my knowledge and development skill

Profile

Results oriented with more than 16 years of experience in Quality, Abroad and India have independently handled and successfully compete the project through coordination trades building positive report with team members sub-contractors, vendors and clients jobs undertaken /handed inspection and supervision in Petrochemical plant,Refinery,and Fertilizer plant upgrades shutdown maintenance and new construction activities,I am fully conversant with the international code such as Saudi Aramco Engineering standards and procedures, Familiarized and deep understanding of industry codes practices-NEC / NFPA,NEMA,IEC,& IEEE

Education & technical Qualifications:

Graduate Diploma in Instrument Engineering from IIMT Delhi IN 2003

S.S.C from West Bengal board of Secondary education Kolkata 2000

Computer knowledge done basic in IT from ICEI DOEAC “O” LEVEL from ICEI (Institute of Computer Engineers in India)

Saudi Aramco Experience: Having Saudi Aramco SAP No. (Saudi Aramco Approval)

worked with Saudi Aramco from past 16 years in Inspection field.

Tasks and Responsibilities:

Inspection & Witnessing according to Project Specification, QCP, ITP & Method of Statement, International standard and other approved reference Document as per Company standard.

Ensure that the quality of work carried out in accordance with Project Specification and other approved standard of company. Responsible for switchgear testing like-: Bus bar-IR, Contact resistance & Hi-pot, IR, winding, Ratio, Polarity & Relay test, Functional test.

Responsible for Motor Test like-: IR & Winding, Differential protection test, Solo run & bump test, motor direction test.

Routine Area Surveillance of Electrical & Instrumentation construction activities.

Updating day-to-day Inspection, Test & Area Surveillance report to QA/QC Manager.

Issuing (NCR) Non-conformance report, (CAR) Corrective action Report, (PTQR) Project technical Query Report, (DR) Damage Report when the specification or procedural requirements are not met.

Coordination with Consultant and Client on all aspects of site inspections.

Responsible for compilation of Instrumentation dossiers and documentation to facilitate the hand over all the system from construction phase to Pre- commissioning phase.

Assist QA/QC Manager to Established Project Specification, Method Statement, QCP / ITP for E&I.

Reviewing the engineering document and maintaining the latest revision of all contract documents, Drawing, Specification and standards required for Quality Assurance & Quality Control Inspection.

Ensure the discipline punch list are created for Inspection Hold point and completed before the requirement, clearing the punch list.

Responsible for receiving the RFI (Request for Inspection) raise by construction Engineer /Supervisor after completion of job. Carrying Internal / Pre- Inspection and forwarding it to Consultant & Client for group Inspection and his acceptance.

Make verification for the RFI submitted by the construction department, work to be inspected is complete and in compliance with the Engineering Standard & Material shall conform to all applicable requirements standard. Verifying and reviewing the construction drawings covering ISS, P&ID, ILD, Layout Drawing, Hook-Up Drawing, Typical Drawing and Wiring Details etc.

Carrying Internal Inspection prior to issuing notification for MCN Mechanical System Completion Notification to Client. Carrying group Inspection for MCN & Final Walk through with Consultant & Client

Responsible for updating the ITR Inspection Test report, taking client signature for his approval, Submitting the ITR to Certification department for record keeping, system updating and maintaining QC documentation, Reviewing the final QC documentation.

Responsible for Installation / mechanical Completion for Instrumentation system. DCS/PLC/ESD/FAS-System Cabinet, Marshaling cabinet, Junction Box, Field mounted instrument like PT, TT, FT, LT Switches, Gauge’s, and MOV & Control Valves Etc.

Responsible for the Installation of Fire & Gas, Telecommunication System in the Field such as Push Button, Horn & Beacon and Fire & Smoke Detection and Analytical Instrument.

Inspection for the Installation of CCTV camera & Speakers in the Electrical Substation and Main Control Building.

Visual inspection of all types of electronics & Pneumatic instrument like PT, TT, FT, LT Switches, Gauge’s & Control Valves, MOV etc, and Witnessing the calibration of Instrument at site Calibration workshop & field.

Reviewing the Instrument Hot Loop packages and witnessing Instrument Final Hot Loop check.

Inspection for installation & rooting of Instrument Air Piping, Tubing /Impulse tubing, and Witnessing the Pressure & Leak Test.

Inspection for Laying, Dressing, Glanding and Termination for EC, LV, MV, HV Control, Power & instrument (UG/AG) Cable.

Inspection of Cable trays and Conduit in the Field and inside Control Building.

Inspection for the Instrument Cable Trenches prior to cable Pulling and after Cable Pulling to release for the next activities. Inspection for Cable Rooting, Dressing and tagging in side cable trench.

Inspection for the Installation of Earthing (Grounding) Cable and Bus bar in the Field and Buildings and Connection to the equipment as per the approved drawing and specification.

Familiar with international standards ISA, IEC, ANSI, API, NEC, NEMA, NFPA, BS etc.

Conversant with engineering Drawing such as P&ID, Hook-up, ILD, Termination Detail, Cable Schedule, Plant Layout, Logic Diagram etc.

Experience in Abroad:

1. Project : CLEAN FUELPROJECT PACKAGE. (CFP)

KNPC

Employer : WOOD GROUP

Designation : QA/QC Engineer E&I (PMC)

Duration : January 2019 to Till Date

2. Project : UTILITIES AND OFFSITE PROJECT PACKAGE. (UOSP)

PETRO RABIGH

Employer : SAIPEM S.p.A. (SNAMPROGETTI)

Designation : Quality Supervisor E&I

Duration : February 2018 to December 2018

Reporting to QA/QC Manager for all aspect of E&I activities on the site. Directly reports to the QA/QC Manager for all the aspects of E & I Quality Control Procedures. Preparing and Updating of Quality Control Procedures (QCP) and Inspection Test Plan (ITP) for E&I, according to the Project standard specification. Review ITP and MOS as per project specification & standard.Work closely with construction team to assist as necessary in the resolution of quality issues

Performed Quality Control inspection and proper documentation in instrumentation Phase of Project covering quality control inspection, testing and pre-commissioning activities. Insulation Testing. Performed material receiving checks, material take-off verification and quantity rechecking and quantity progress reporting during installations and pre-commissioning. Involved in all kinds of Material Inspection of Instrument like pressure transmitter, level transmitter, temperature transmitter, flow transmitter, flow transmitter Panel, Junction Box, Cable, Coordinated with the construction and other department teams for the implementation of the project Quality Control program.

3. Project : ONSHORE MAINTAIN POTENTIAL PROJECT. (OMPP)

SAUDI ARAMCO

Employer : SAUDI KAD

Designation : Quality Supervisor E&I

Duration : August 2016 to November 2017

Responsibilities:

Cary out inspection and checking for all quality related procedures in the site and ensures activity at the site are as per approved method statement and inspection test plan.

Coordinate with the consultant’s representative and Site In-charge for inspection and meeting about quality problems including the closure of Non-Compliance Report.

Responsible for review QA/QC document like ITP, QCP, Method of statement and specification Responsible for the inspection of field instrument as per P&ID and report QA/QC manager. Assist the site QC manager in the organization, maintenance and control of the Quality system. Liaise with the site construction engineers and provide assistance when requested. Coordinate with clients and carrying timely inspection of construction activities With Client handle all quality control activities at site under Electrical instrument discipline as per Project standards. Preparing and updating of Quality Control Procedures (QCP) and Inspection Test Plan (ITP) for E&I according to the Project standard specification. Review ITP and MOS as per project specification & standard.Work closely with construction team to assist as necessary in the resolution of quality issues.

Ensured all installation complies with SAUDI ARAMCO Standard & Specification, and applicable industry code practices, i.e. ISA, API RP550, IEEE, NEC & NFPA 70, etc.

4. Project : SAUDI ARAMCO DOW Petrochemical Project (MFC)

Employer : SADARA (DOW)

Designation : Sr. Quality Inspector E&I (Client Inspector)

Duration : August 2013, to 30 June 2016

Responsibilities:

Familiar with all types of Testing in electrical Equipment Like, Motor Stability test, Solo run test, Loop check, Hi-Pot test of MV, HV, Cable and Switchgear, Insulation

Reviewing all Documents Method of Statements contractor Personal qualification. Reviewing all Quality weekly MOM weekly reports Organization chart. Reviewing pqi, Reviewing all ITP, QCP. Handling all RFI Material Receiving RFI. Inspection installation of Duct bank and cable trenches, Substation Shielding grounding system, Circuit breaker disconnect switches complete with Aluminum bus bar Installation, witnessing all the electrical equipment Installation like Switchgear, transformer, Motor Panel. Inspection Installation of HV/MV/LV cable and cable testing such as (continuity test Insulation resistance test), witnessing solo run test, winding test.

Witnessing the calibration of instruments at the calibration shop (Lab) and vendor instrument at the site.Reporting to QA/QC Manager for all aspect of E&I activities on the site. Directly reports to the QA/QC Manager for all the aspects of E & I Quality Control Procedures. Preparing and Updating of Quality Control Procedures (QCP) and Inspection Test Plan (ITP) for E&I, according to the Project standard specification. Review ITP and MOS as per project specification & standard.Work closely with construction team to assist as necessary in the resolution of quality issues.

To coordinate in Audit schedule for all Test and Inspection conducted & has to see to it that all files documents such as latest QCP/ITP & update drawings, layout, schematic, cable schedule, equipment schedule, Instrument index, hook up, Isometrics calibration reports, test reports, loop folders, NCR, OSD, DR, QC dossier are in hand and available and updated. Attending weekly Meetings with Sub-Contractor and Contractor for Progress monitoring and issues related to Quality Control.

Assist the site QC manager in the organization, maintenance and control of the Quality system. Closely monitor and follow with the Contractor for preservation of Instruments at Ware house and at the site. Installation of cable tray and conduit and conduct test for instruments equipment in process. Preparation weekly QC reports and implements of quality plan & procedure and review of materials submittal for technical QC approval.

5. Project : SAUDI ARAMCO TOTAL REFINERY PROJECT (SATORP

PROJECT ACID GAS)

Employer : Saudi Aramco and Total

Designation : Sr. Quality Inspector E&I (Client Inspector)

Duration : 11May 2011 to 30July, 2013

Responsibilities

Prepare a quality plan in co-operation with the project managers (PM), assuring compliance with company requirements. Monitor assurance and maintenance of project procedures and project job description. Electrical LV, MV, cable Installation All type of electrical wiring (3phase single phase) Electrical testing commissioning laying of Cable tray as per drawing Pulling of cable as per cable schedule, Installation of power transformer panel Junction box switch Rack. Witnessing torque testing.

Verify that project procedure and authorized for use before activity commences. Prepare issue and implement the project technical kickoff meetings, supplier kickoff meetings, and customer kickoff meetings to assure quality requirements and understood and implemented. Looking after the inspection requirements (Testing -FAT, SAT, calibration of field instruments functional check and loop-check). installation of instrument panel, F&G system DCS expansion, system, pressure transmitter, level transmitter, temperature transmitter, flow transmitter, & small power cabling support system and its installation as per NEC and Std. Responsibilities include the establishment of the QA/QC documentation QCP, Method of statement and specification Responsible for the inspection of field instrument as per P&ID and report QA/QC manager. Responsible for the inspection of field instrument installation like pressure transmitter, flow transmitter, level transmitter, temperature transmitter as per ITP and QCP.

Ensured all installation complies with SAUDI ARAMCO Standard & Specification, and applicable industry code practices, i.e. ISA, IEEE, NEC & NFPA 70, etc.

6. Project : SHEDGUM GAS PLANT

Employer : SUNGCHANG Company

Designation : E&I QA/QC Supervisor

Duration : January, 2010 to December, 2010

Responsibilities

Involved with commissioning activity, closing Punch item Testing and witnessing SAT Site Acceptance Tests and FAT Factory Acceptance Tests of Electrical & Instrument Control system, Participate in the surveillance/audit process to monitor construction & quality Control when requested by the Site QA/QC Manger, Generate Non-Conformance & Surveillance Reports for Activities and materials on site found not in conformance with specified requirements. Cable/Motor/Transformer/Generator/Switchgear, WR Test, Battery charge and discharge test, Earthling Open CKT & Close CKT Test, Lightning Lux Test, familiar with all types of electrical drawing like, single line Diagram, P&ID, Issued for construction, Approved as built drawing, location drawing lay out drawing, power & control Drawing internal external Drawing, All types of auxiliary panel drawing, electrical schematic drawing, Interconnection drawing, Instrument hook up drawing, instrument installation drawing, and instrument Junction box details drawing.

Responsible for the inspection of field instrument installation like pressure transmitter, flow transmitter, level transmitter, and temperature transmitter as per P&ID and QCP. Installation and termination of instrument cable with DCS &RTU panel and calibration of instrument like H2s detector, pressure transmitter, level transmitter, temperature transmitter, flow transmitter, flow transmitter, &small power cabling support system and its installation as per NEC and Std. Responsibilities include the establishment of the QA/QC documentation system, Perform Quality Control inspection on work packages as per subsystem for Mechanical Completion activities and confirmed/approved the corresponding Inspection & Test Record (ITR) for the particular work package, Coordinate with the construction, commissioning, safety and other concerned departments for mechanical completion.

7. Project : KING ADULLAH UNIVERSITY OF SCIENCE &TECHNOLOGY (KAUST)

Employer : AL-HUGAYET GROUP (KAUST)

Designation : Quality Inspector E&I (Client Inspector)

Duration : March, 2009 to December, 2009

Responsibilities:

Involved in field instruments calibration, installation and glandning, termination activities, as such pressure gauge, pressures switch, press transmitter, (DPT) differential pressure transmitters, flow switches, flow transmitter (vortex, magnetic, thermal mass flow meter, ultrasonic), level transmitter, level switch, interface level troll(capacitance type, displacer type, float type, radar tank gauging. Installation of cable tray and conduit and conduct test for instruments equipment in process. Preparation weekly QC reports and implements of quality plan & procedure and review of materials submittal for technical QC approval.

Perform Quality Control inspection on work packages per subsystem for Mechanical Completion activities and confirmed/approved the corresponding Inspection & Test Record (ITR) for the particular work package, Coordinate with the construction, commissioning, safety and other concerned departments for mechanical completion QC inspection activities. Perform loop checking bench & field calibration, leak testing, instrument function test and installation. Perform pro-active QC inspection to the ongoing construction activities to align/comply all construction output to the specific project procedures, standards, specifications and ensure that it follows all relevant approve for construction drawings.

8. Project : KHURSANIYAH PRODUCING FACILITIES PROJECT

Employer : CONSOLIDATED CONTRACTOR COMPANY

Designation : Sr. Quality Inspector E&I

Duration : 16 June, 2006 to 27 February, 2009

Responsibilities:

Involved in All types of motor testing solo run test load run test, IR check, WR check, Neutral ground Resistance testing, ear thing test individual & combine test, Instrument earth, Equipment earth, AC & DC high pot testing for cable & switchgear, All types of electrical equipment, like, Motor, Transformer, Switchgears, Battery, UPS, lightning, earthling performed and witnessing in Installation. Performed Quality Assurance/Control inspection on Contractor’s Quality Assurance/Control construction activities and monitor or witness their work on a daily basis. Performed surveillance of contractor’s activities and ensure that all Electrical, Instrumentation and Telecom installation were carried-out in accordance to the approved for construction drawings and specifications, procedures, instructions and in compliance to the project specification and related International Standard. Reviewed project specifications/code requirements and their implementation on the field. Coordinated with the construction and other department teams for the implementation of the project Quality Control program.

9. Project : MINA AL-HAMDI KUWAIT

Employer : LG ENGINEERING & CONSTRUCTION

Designation : Instrument QA/QC Inspector

Duration : 15 January, 2005 to 25 April, 2006

Responsibilities:

Performed Quality Assurance/Control inspection for Mechanical Completion activities and confirmed/approved the Inspection & Test Method, Involved in bench & field calibration, Performed pro-active QA/QC inspection to the ongoing construction activities to align/comply all construction output to the specific project procedures and standards. Periodic inspection of cabinet termination, glandning and neatness, penetration sealing and cable identification Pre-run checking and punch-listing of equipment, system and component shortfalls circuit testing preparation and witness pre-commencement power / signal checks Responsible for the inspection of field instrument installation like pressure transmitter, flow transmitter, level transmitter, and temperature transmitter as per P&ID and approved QCP and International Standards.

10 Project : VISHAL ENGINEERING

Employer : HALDIYA REFINARY KOLKATA (W.B)

Designation : Instrument Supervisor

Duration : 10 September, 2003 to 18 October 2004

Responsibilities:

Supervision for Mechanical Completion activities and on firmed/approved the Inspection & Test Record (ITR), where applicable prepare punch list and submit the same to Project Information Management System (PIMS) Coordinate with Quality team for execute the Inspection as per Project QCP and ITP and mechanical completion, Supervision and witnessed insulation, continuity and hi potential cable testing, cold loop checking, earth continuity resistance test, bench & field calibration, leak testing instrument function test and installation., Loop Checking and Pre-commissioning of systems of Equipment, Control System and Field Instrumentation work including Level, Flow, Pressure, Temperature, Control Valves and Actuators. Fire and Gas Detection System. Make a record or report on hard and soft copy of all the activity each day done by construction.

Personal Information.

Date of birth : 1st February 1984

Place of birth : Kolkata (India)

Father’s Name : Md. Shibli Alam

Nationality : Indian

Language Known : English, Arabic, Bengali, Hindi and Urdu

Postal Address : B32/2 Iron Gate, Garden Reach Road Kolkata-700024

Driving license : Valid Saudi Arabia & India Light motor vehicle

Date of issue : 21-05-2011

Date of Expire : 31-01-2021

E-mail id : adfn5m@r.postjobfree.com / adfn5m@r.postjobfree.com

Contact Number : +965-******** / 0091-9831665470

Passport Details

Passport No : T 8206215

Date of Issue : 15-10-2019

Date of Expire : 14-10-2029

Place of Issue : KUWAIT



Contact this candidate