Post Job Free
Sign in

Engineer Project

Location:
Lagos, Nigeria
Salary:
400000
Posted:
August 27, 2020

Contact this candidate

Resume:

STEPHEN CHIDI CHIMA

No. * Elelenwo – Port Harcourt Rivers State Postal Code

500001.

Mobile: +234**********, +234**********.

*************@*****.***, ****************@*****.*** skype: stephenchima

Professional Summary:

Experienced in Operations, Production, Projects Management, Planning, Contracts, Technical Tendering, Cost control, Quality Assurance, Quality Control, Engineering and Health Safety, Proposal, Tendering, Experienced in Offshore/Onshore Operations, Well Testing, (Well test on Paper TWOP) Early Production Facility, Completion, Testing Data Acquisition(TDA) and Interpretation, Oil and Gas Process Pipeline Design, Project/Operation Management, Planning, Scheduling, Contract Administration, Job Quotation/Cost control, Quality Assurance, Quality Control and Engineering Safety

BIO DATA

Date of Birth 20th August, 1985

Sex Male

Nationality Nigerian

EDUCATION

2010 2015

University of Port Harcourt, Nigeria

B.Eng. [Hons] Engineering – Petroleum & Gas

2004 2009

Institution of Management and Technology, Enugu, Nigeria. H.N.D. [5 years] Engineering – Mechanical

SKILLS AND COMPETENCE

Proficient in the Following:

Fekete, Pie, Saphir, Primavera 6, Advanced Excel, Oil Field Manager, Pipesim, MS. Word, Power Point, Pipe Flow Expert, MS. Project, Robbo Pump and Flow Pro ASSOCIATIONS

International Association of Engineers (IAENG). Pipeline Association of Nigeria (P.L.A.N), American Welding Society (AWS)

CERTIFICATIONS

2016 H2S Awareness Certificate

2016 Negotiation and Conflict Resolution Certificate 2015 Project Management Diploma

2015 Offshore Oil and Gas Safety 1&2 Certificate

2015 Contemporary Issues in Ocean Governance (International & Local waters) Certificate

2015 Financial Planning Certificate

2015 Quality Management Diploma

2015 Offshore Oil and Gas Safety 1&2 Certificate

2015 EU Public Procurement (Contract, Tendering, Bidding & Costing) Certificate 2014 Strategic Management Certificate

2012 Advanced Level III Health, Safety and Environment (HSE) Certificate WORK EXPERIENCE

POSITION/COMPANY/YEAR/

PROJECT RESPONSIBILTIES:

Process Engineer

Almansoori Specialized

Engineering, Oman UAE

February 2019 to Date

Is an Oil and Gas Servicing

Company Mainly into O&G

Specialized services such as,

Production, Coil Tubing, Well

enhancement, Well Test, DST,

Completion, Acidization,

Recovery etc.

Client:

PDO, Oman UAE, Locations:

Hasira 32, Sadad 4,3, Wadi

mery 4,5&7and Hazus

• Oil and Gas Process Pipeline Repair and Pressure Vessel Maintenance, Construction, Commissioning and

Decommissioning activities.

• Plant Process Equipment Sizing and Design Modification to reduce Process cycle time.

• Down hole Manual and Wireless Data Acquisition.

• Installation of pressure vessels, atm vessels, pipelines, Flow meter/ Rig up of Wireless Pressure, Temperature, Flow iPRO Sensors for Data Acquisition using Software such as Fekete, Detailed reporting on Down hole information as per Client Request.

• Review HAZOP/HAZID and Risk Assessment

• Plan and Manage Shutdown Activities.

• Train and Motivate Process Plant Operators

• Working in Compliance with Design codes such as API 12J for Oil and Separator, NACE MR.0175, DNV 2.7.3 for Offshore Units, ASME B31.3 Process Piping, API Spec. 16C Choke and Kill System, API 610 for Pumps.

• Prepare Budget and Duration for Assigned DST, EPF, Well Test, Flow back Loop Work Scope etc.

• Ensure Programs are in line with Approved Production, Process, well test Plan/Program

• Down hole Information Interpretation and Recommendation.

• Scheduling and Planning for Early production facility, facility maintenance and well test activities using Primavera 6.0 and Excel.

• Launched and Set up the Data Port monitor software for Process information and Interpretation.

• Supervising Surface Well Testing/EPF Equipment Operation and Rig up/Rig Down of ESD, choke manifold, Daniels, Test Separator, Sand trap, Surge tank, Well test instrument such as Differential Barton recorder (1500psi/400InchH2O) Digital differential meter, 1 & 2” Turbine meter/ Totalizer for both water and Oil etc.

• Making Daily, Weekly and Monthly Operations and Detailed Process Reports on Data Acquired to Clients.

• Preparing Detailed Process Diagram (PFDs) and (PIDs) for better work scope using Visio.

• Sampling and Measuring Oil Shrinkage, BSW using Centrifuge, Oil Specific Gravity using Hydrometer, Specific Gravity of Gas using Ranarex Gravitometer and measuring Produced Water Salinity etc.

• General Equipment Maintenance after rigging up.

• General Facility maintenance based on approved maintenance schedule

• Making sure Safety is in daily Operation such toolbox talk, pep talks, Proper PPE awareness, H2S awareness, Safety updates etc. Operations Engr.

Deep Energy Exploration and

Production (DEEP)

August 2018 to February 2019

Is an Oil and Gas Company

Mainly into Production and O&G

services such as, Drilling,

Production, Well enhancement

and Recovery. Hired as a Project

Manager for managing the

Demanding and Complex

Operations.

• Providing Technical support to acquire Offshore/Onshore Project/Operations, quality materials, calculation of project requirements, good material handling, and Project budget management.

• Improvising useful tools and techniques for optimum utilization of Project and Production resources and quality control.

• Establishing project budget and ensuring good control measures to serve the project management objectives.

• Developing and maintaining useful Project records and Documentation essential for legal purposes.

• Accepting the challenges to offer highly customized services that will offer clients with enhanced satisfaction and ensuring timely services and Project delivery according to contract terms.

• Providing technical assistance and solving queries in relation to Project Plan, Production plans, Layouts, Engineering Designs, Developments, Change Management, Project Budget and in Project Management process. Project Engineer

Saipem Contracting Nig. Ltd

March 2015 to June. 2018

Saipem Nigeria is a Nigerian

subsidiary company of Saipem,

with a huge structure covering

all sort of services to the Oil &

Gas Industry such as Drilling

On/Offshore, construction

activities on/offshore (pipelines,

power plants, fabrication

activities) Engineering,

Maintenance.

• Managed Projects with my Project Team from Conception, Execution through to Completion.

• Project Planning, Resource allocation, Monitoring, Estimating and Project Budget Management to keep cost down.

• Spear headed Stake-holder Engagements often involving senior government Officials.

• Project/Operation Risk Management and Change Management

• Vetted Designs with Design Engineers before Approval.

• Produced Test Plans, Reports, Supervise and Monitor Testing Processes for E.g. Pressure vessels, WPS, Well Testing Equipment

• Oversaw the maintenance of projects after completion.

• Trained, Managed & Supervised Teams of young tendering Engineers on Technical and Commercial Bids.

• Assisted in legal aspects of contract documentations.

• Improved relationships and resolved Conflicts with contractors, suppliers and Consultants

• Planned and Initiate Agreement/Understanding (MOA/MOU) with International and Local Companies on Projects and Partnership.

• Assisted the Planning Engineer in Project Scheduling, Control and Monitoring using PRIMAVERA P6, Preparing progress registers for Engineering, Procurement and Construction.

• Produced Test Plans, Reports, Supervise and Monitor Testing Processes. E.g. Pressure, WPS, Flow back, Well Testing.

• Prepared preliminary and feasibility cost estimates for fabrication, Maintenance and Installation Projects on E.g. Oil/gas Heater, separators, ASTs, FPSO, EPFs, well head, sand trap etc.

• Prepared detailed cost estimate for offshore and on shore projects.

• Organized and Prepared Detailed Technical Presentation to Clients.

• Developed tender list for suppliers and sub-Contractors

• Organized Registration/Certification and follow up with Certification bodies and Government Bodies

• Planned Preliminary project investigation, permitting and project management processes.

• Developed and drove continuous improvement initiatives for Engineers and Company Processes and Systems.

• Improved quality assurance processes and practices in every Project and Operation

• Prepared down-hole Instrument replacement operation programs and procedures.

• Planned follow-up and reporting on Work-over Rig, Wireline, Completion Coil-tubing Operations.

• Assessed/identified potential bottle necks in each Operation processes.

• Prepared and Planned Risk analysis on new equipment for Replacement, completion and Maintenance Operation

• Developed and initiated internal processes to improve program delivery within specific time frames.

• Prepared maintenance, repair Procedures and schedule for Light, Medium and Heavy Well Intervention Operations

• Prepared Rig intake procedures, Safety analysis, risk and emergency preparedness analysis.

• Preparation of project execution plan manuals, specific engineering procedures, decision basis Documents,

• Operation programs, experience transfer, contract activities. Interfaced internally with other team members in addition to well Intervention services operations stakeholders such as onshore & offshore production operations teams, finance, logistics, Production Optimization and subsurface.

Project Engineer

Zakhem International

Date: April 2011 to January

2015

Is a Multinational Oil and Gas

Construction Company with

branches in 29 Countries with

Head Quarter in Beirut, Lebanon,

Zakhem is mainly into Oil and

Gas Pipeline Construction,

Fabrications and Civil Works,

Her Clients are mostly

Multinational Companies and

Government Organizations.

Client: NNPC

Project:

the Expansion of the existing

Escravos – Lagos pipeline

system from PS1 KP38 to PS5

Alagdado/Itoki with 36”x

342Km Class 600 Gas Loop

Pipeline to increase

evacuation of gas volume up to

1,100mmscfd.

• Administered on-going Contracts, including monitoring contractor and compliance with the Contract documents. Investigated problems and recommended corrective action

• Prepared correspondence and maintains records necessary to ensure the effective administration of all Contractual matters

• Received, reviewed, prepared, and submitted Cost Estimates for Break down Activities such as 36’’ Pig Station Installation, Pedestal Civil Works, Form Works and Sectional Welding, Inspection etc.

• Followed up Pipeline Engineers to make sure the PID design is followed as approved by both stakeholders

• Collaborated with management teams to deliver assigned programs and individual timelines, assessed/identified potential bottlenecks in each project activity processes.

• Assisted in directing the recruitment process of key Pipeline Engineers, selection of consultants and outsource-vendors.

• Developed and initiated internal processes to improve program delivery within specific Project timeframes.

• Established goals and milestones as per the desired results to be generated by the project.

• Defined the resources required for completion of a project and allocated resources accordingly.

Project Engineer

Zakhem International

Ltd– June 2014 to

September.2014

Client: Chevron

Project:

The Escravos Export System

Project (Offshore and Onshore)

Replace the existing 26” export

pipeline built in 1969 with a new

30” pipeline of approximately 42

km from the Escravos Terminal

to Single Point Mooring facilities

offshore at a water depth of over

30m

• Supervised Contractors and negotiated rates with them

• Supervised Qualification of Welders

• Project Supervision and Execution based on Agreed Contract Terms.

• Review and Correct contract documentations.

• Performed site surveys and Technical reports.

• Lead a construction team to finish segmented projects within budget.

• Supervised Surveyors, Foreman and construction crew to ensure work is completed on-time.

Assistant Project Engineer

Zakhem International

Ltd– January 2012 to

November 2013

Client: Indorama

Project:

Construction of 18” X 83km Gas

Carbon Steel Pipeline in Existing

ROW (NAOC) from NAOC’s

Ob/Ob gas plant to Transport

Natural Gas to IEFCL.

• Developed baseline management of project schedules.

• Developed of layouts and reports based on client and project team reporting requirements

• Ensured the accuracy of project schedules.

• Conducted analysis, updated and sent weekly, semi-monthly, and monthly reports to the Project stakeholders

Trainee Pipeline Engineer

Zakhem International

Ltd– April 2011 to November

2011

Client: NNPC

Project:

Expansion of the existing

Escravos – Lagos pipeline

system from PS1 KP38 to PS5

Alagdado/Itoki with 36”x

342Km Class 600 Gas Loop

Pipeline to increase evacuation

of gas volume up to

1,100mmscfd.

• Worked with the Project Team in Project Management Activities.

• Assisted the Project Director in Reports on Sub-Contractors Activities.

• Document Control and Project Management Logistics. Trainee Pipeline Engineer

DAZ Technical Ltd –

8 Months Employment as a

Maint. Engr. March 2009 to

November 2010 .

year Educational Industrial

Training. February 2006

to November2007

• Took the still photography of damage or any discontinuity of underwater rust prone equipment.

• Technical maintenance including preparation of technical checklist, management of heavy mechanism.

• Inspected and interpreted malfunctions.

CORPER

NYSC

July 16th 2010 to July 15TH

2011

• Taught Physics, Chemistry, Math, Collated Records the Classes Continuous Assessments.

REFEREE

IAN CUBBERLEY PROJECT DIRECTOR

[CONSULTANT]

ALCON 081********

VICTORIA AKUGBO BUSINESS DEVELOPMENT

MGR

INDORAMA 090********

ENGR. KELVIN ONYENIKE LOGISTIC MANAGER PROFIXIONER 070********



Contact this candidate