Post Job Free
Sign in

Design Engineer Project

Location:
Visakhapatnam, Andhra Pradesh, India
Salary:
60000
Posted:
August 27, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

BHARGAV RAPARTHI

*******.*******@*****.***

998-***-****

CAREER OBJECTIVE

To associate with an organization where I can apply my valued experience and as well enhance my skills through learning new things and contribute to the development of country through organization and mine as well.

KEY QUALIFICATION

M. Tech in Transportation Engineering in 2010 with 8.05 CGPA, IIT Roorkee, Roorkee B.E. in Civil Engineering in 2008 with 8.02 CGPA, GITAM College, Andhra University, Visakhapatnam

Have more than 9 years of professional experience in highways, traffic and transportation core including geometry design of highways, surveys, field investigations including coordination with client/sub-consultant, traffic analysis, establishing traffic growth rates, traffic demand, capacity analysis, framing proposals, toll revenue estimation, Preparation of Feasibility report, Detailed Project Reports for Urban roads, Grade separators and Rural highways, pavement design, economic analysis using HDM-4 software, preparation of technical specifications for tender documents. Possess proficiency of working on Mx Roads. Possess good knowledge of IRC codes, MoRT&H Specification and other relevant codes.

PROFESSIONAL EXPERIENCE

1. Organization : STUP Consultants Pvt. Ltd, Hyderabad Designation : Senior Design Engineer (Highways)

Period : Apr. 2017 – Till date

2. Organization : STUP Consultants Pvt. Ltd, Hyderabad Designation : Design Engineer (Highways)

Period : Nov 2015 to Apr. 2017

3. Organization : STUP Consultants Pvt. Ltd, Hyderabad Designation : Assistant Design Engineer (Highways) Period : July 2011 to Nov 2015

4. Organization : DSC Limited, Gurgaon

Designation : Assistant Manager (Highways)

Period : July 2010 to July 2011

PROJECT #36

Name of the work: Consultancy Services for preparation of Detailed Project Report for formation of Radial Road No. 20 in Hyderabad being taken up with the loan assistance of JICA. Client : Hyderabad Growth Corridor Limited

Period : May 2018 to Ongoing

Scope of the Work:

The project envisages study for construction of Radial Road No.20 connecting Nagole junction to ORR service road for a length of around 15km.

Responsibility:

As a team member, analysed the traffic and travel characteristics and assessed the traffic on project corridor and actively involved in the alignment options study, LA identification, and feasibility report preparation. DPR preparation is process.

PROJECT #35

Name of the work: Consultancy Services for preparation of a Feasibility Report and Detailed Project Report for Improvement of Corridor Ambedkar Statue – Kattamaisamma Temple – Lower TankBund (Ambedkar Study Circle Junction) – Sailing Club – Karbala Maidan (2.90 m) and Karbala Maidan to Paradse (1.7 Km) and Nalgonda Cross Roads Junction to Malakpet Gunj (0.9 Km) and Integrating with Elevated Corridor from JBS to Masab Tank, Ambedkar Statue to Afzalgunj Elevated Corridor, LB Stadium to Chaderghat (Malakpet) Elevated Corridor to achieve overall integration with Musi Skyway.

Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : December 2017 to Ongoing

Scope of the Work:

The project envisages study of Comprehensive Corridor Development including Widening of Corridor to cater to future traffic demand wherever possible in open areas. To identify the major junctions and congested corridors causing conflicts and enormous delays and provide suitable grade separation scheme including Elevated Corridors, Flyovers, Underpasses and Interchanges etc., so as to provide uninterrupted traffic flow.

Responsibility:

As a team member, organised the various traffic surveys at site. Analysed the traffic and travel characteristics along the project corridor and actively involved in the feasibility report preparation. PROJECT #34

Name of the work: Consultancy Services for Survey, Investigation and preparation of Designs & Drawings and detailed estimates along with DPR and EPC Document for Construction of ROB

(excluding Railway Span) including approaches, Service Roads, Storm Water Drains along footpath, Median, Kerb, Street light works at Km 170/40-42 between Hi-Tech City and Borabanda Stations for 4 lane carriage way

Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : October 2017 to August 2018

Scope of the Work:

The project envisages study of preparation of the detailed project report for construction of ROB

(excluding Railway span) including approaches, service roads and other cross sectional elements. Responsibility:

As a team member, analysed the traffic and travel characteristics in the vicinity of the project corridor. Based on various traffic surveys estimated the expected traffic on ROB and its traffic demand forecasts. Proposed ROB lane configuration including at-grade improvements are identified and actively involved in preparation of Detailed Project report. PROJECT #33

Name of the work: Consultancy Services for Feasibility Study and Preparation of EPC/PPP Tender Documents for formation of Road to connect Inorbit Mall to Chithrapuri Colony Via Hyderabad Knowledge City, Khajaguda Junction.

Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : January 2017 to January 2018

Scope of the Work:

The project envisages the identification of possibilities of the Tunnelling interchange along the hill for establishing proper connectivity.

Responsibility:

As a team member, analysed the traffic and travel characteristics along the project corridor. Based on various traffic surveys and the traffic demand forecasts, estimated diversion traffic and proposals are made for corridor improvements and grade separators including Tunnel proposal. Actively involved in preparation of Feasibility Report.

PROJECT #32

Name of the work: Consultancy Services for preparation of Feasibility Report, Preliminary Project Report including preparing detailed plans and cost estimates, and bid documents for best feasible alternative to Form 120’ Wide Road from Shilpa Layout, Gachibowli via Gas Company to Gachibowli Junction including construction of elevated structure as per master plan. Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : May 2017 to October 2017

Scope of the Work:

The project envisages the Identification of best feasible alternative from Shilpa layout via Gas Company to Gachibowli junction (120ft wide road) as per master plan. Integration of other Ongoing projects and future infrastructural schemes such as Metro Rail, BRTS, as per the CTS Master Plan. Responsibility:

As a team member, analysed the traffic and travel characteristics in the vicinity of the project corridor. Based on various traffic surveys and the traffic demand forecasts, estimated diversion traffic and proposals are made for corridor improvements and grade separators. Actively involved in preparation of Feasibility Report & Preliminary Project Reports. PROJECT #31

Name of the work: Consultancy services for Feasibility Study for Elevated / At-Grade Corridor for High Capacity Mass Transit Route (HCMTR) Alignment in Pune City Client : Pune Municipal Corporation

Period : July 2016 to July 2018

Scope of the Work:

The project envisages the preparation of feasibility study for HCMTR corridor of approx. 36Kms to decongest the city roads from through traffic which is currently passing through the city. Responsibility:

Identified and organised the various traffic surveys. Prepared detailed traffic analysis, estimated traffic on elevated corridor and projected the traffic demand. Identified the proposals with dedicated facility for public and private transport demand separately. Prepared draft feasibility report. PROJECT #30

Name of the work: Consultancy services for detail design for 4 laning of the Outer Ring Road from Village Jamtha to Village Fetri for Nagpur City (Package I) Total Length 33.50 Kms and 4 laning of the Outer Ring Road from Village Fetri to Village Dhargaon (Package II) Total Length 28.05 Kms. Client : MEP Infrastructure Developers Ltd.

Period : June 2016 to Ongoing

Scope of the Work:

The project envisages the preparation of detail designs for both packages including traffic report, pavement design, alignment design.

Responsibility:

Identified and organised the various traffic surveys. Detailed traffic analysis, estimated diversion traffic on ORR, future traffic demand. Prepared traffic report. PROJECT #29

Name of the work: Consultancy Services for preparation of a feasibility report and bidding documents for Comprehensive Development of following corridors as Conflict Free Corridor in Greater Hyderabad Municipal Corporation (GHMC) Limits, Telangana State. 1. NFCL Junction to Allwyn Cross Roads (Miyapur) Corridor 2. Allwyn Cross Roads (Miyapur) to Patancheru Corridor 3. Habsiguda to ECIL Corridor

4. LB Nagar to Aramgarh Corridor

Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : May 2015 to ongoing

Scope of the Work:

The project envisages the preparation of feasibility study for Comprehensive Corridor Development including Widening of Corridor to cater to future traffic demand. To identify the major junctions and congested corridors causing conflicts and enormous delays and provide suitable grade separation scheme.

Responsibility:

As a team member, analysed the traffic and travel characteristics on all the project corridors. Identified, organised the various traffic surveys and investigations. Analysed the traffic and travel characteristics for all project corridors. Based on various traffic surveys and the traffic demand forecasts; proposals are made for corridor improvements and grade separators proposals are identified at major intersections. Prepared traffic demand forecasts; studied the options for corridor improvements and identified grade separators proposals at major intersections. Co-ordinated with client in finalizing the feasible proposals and prepared feasibility report for all packages. PROJECT #28

Name of the work: Consultancy services for Comprehensive Development of East West Corridor

(ORR East – ORR West) along Musi River as Skyway.

Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : June 2015 to November 2015

Scope of the Work:

The project envisages the preparation of feasibility study for a Skyway along the Musi River in Hyderabad to provide an efficient and seamless connectivity between East and West of ORR through a ring road around the city, decongesting city roads from through traffic travelling east- west of city

& vice versa,.

Responsibility:

Identified and organised the traffic surveys on existing routes in the influence area of project corridor. Prepared detailed traffic analysis, estimated diversion traffic and projected the traffic demand on the Skyway. Studied the merits and de-merits of various alternate proposals of Skyway corridor and prepared feasibility report. Co-ordinated client meetings for approvals, assisted in process of EIA clearances.

PROJECT #27

Name of the work: Consultancy Services for :A) Preparation of a Feasibility Report for Improvements in Road Infrastructure around Sec’Bad Military Station at Army Ordinance Corps

(AOC) Centre (Part-A) B) Preparation of Detailed Projects Report of the Identified Road Stretches in Feasibility Study (Part-B)

Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : October 2014 to Ongoing

Scope of the Work:

Feasibility and Detailed Project Report

Responsibility:

Analysed the traffic characteristics on all the identified routes, studied the requirements for improvements. Identified the improvement proposals for existing routes and proposed development of new links. Prepared feasibility report and co-ordinated with client and army officials. DPR for few new links prepared.

PROJECT #26

Name of the work: Consultancy services for feasibility study and detailed project report for the proposed construction of Grade separators at intersections in Corridor II of Hyderabad Metro Rail – JBS to Falaknuma

Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : 2014

Scope of the Work:

Study of requirements of grade separators along HMR corridor-II in Hyderabad as per current and future traffic needs based on various traffic surveys and DPR for the selected grade separators. Responsibility:

Analysed the traffic characteristics and identified the requirements for grade separators at various junctions along the HMR Corridor-II. Actively involved in framing the proposals and preparation of feasibility and DPR.

PROJECT #25

Name of the work: Consultancy services for preparing Detailed Project Report (DPR) for various road improvement works under Tamil Nadu Road Sector Project II (TNRSP-II): Contract PPC04. Length of the proposal is 362km (Includes SH-15, SH-35, SH-37, SH-166 and SH-83A). Client: TNRSP, Tamilnadu

Year: October 2013 to December 2016

Scope of Work:

The project envisages the preparation of DPRs for various roads identified under world bank aid and scope of work including all engineering surveys and investigation, design of road and structures, traffic, social, environmental, land acquisition, conducting workshops, preparation of estimates, tender documents etc.,

Responsibility:

Identified the various traffic surveys and organised the field surveys. Analyzed traffic surveys and investigations data. Estimated the bypassable traffic, growth rates and identified the improvement proposals for the future traffic demand. Prepared flexible pavement design. Prepared Detailed Project Reports, estimated detail quantities and prepared cost estimates for all the packages. PROJECT #24

Name of the work : Consultancy Services for conducting investigation & testing of soil and preparation of structural designs and drawing, estimates, BoQ etc for pipeline bridge across river Musi at Attapur for laying 1400 mm dia MS Pipeline – Submission of Draft DPR Main Report. Client : Hyderabad Metropolitan Water Supply and Sewerage Board Period : 2013

Scope of the Work:

The Scope of the work includes conducting various surveys, investigations, preparation of bridge alignment, structural designs and drawings, estimates and BoQ for pipe line bridge across river Musi at Attapur and also preparation of Design report.

Responsibility:

Organised the various field surveys, investigations, carried out hydraulic and hydrological calculations, estimated detailed quantities and BoQ for various Bridge items including project costing and also prepared Design report.

PROJECT #23

Name of the work : Development and Operation of Two Integrated Border Check Posts in Srikakulam and Nellore Districts of AP.

Client : M/s GVR Infra Private Limited

Period : December 2013 to February 2014

Scope of the Work:

The Scope of the work includes conducting various traffic studies, analysis of the data, and estimation of ADT & AADT traffic, traffic growth and toll revenue estimation and preparation of Traffic assessment and Toll revenue report.

Responsibility:

Identified and organised various traffic surveys, analysed the traffic data. Studied the traffic and travel characteristics at both check post locations and estimated the tollable traffic. Reviewed the past traffic trends in the project stretch and estimated the future growth rates, studied the influence of various network and infrastructural developments in the project vicinity. Estimated toll revenue and prepared Traffic assessment and Toll revenue report.

PROJECT #22

Name of the work: Preparation of Feasibility Report for the Construction of Grade Separator across Bahadurpura Junction Near Nehru Zoological Park, Hyderabad. Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : July 2013 to June 2017

Scope of the Work:

The Scope of the work includes collection of traffic volume, study the alternate solutions of grade separation, prepare the schematic plans for different alternates and base line cost estimate for each alternate.

Responsibility:

Analysed the traffic characteristics of junction, studied alternate grade separator solutions and prepared the Draft feasibility report.

PROJECT #21

Name of the work : Development of Road from Banjara Hills Road No 2 to Jubilee Hills Road No 5 (Krishna Nagar Junction) Via Annapurna Studios.

Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : July 2012 to September 2013

Scope of the Work:

The Scope of the work includes development of link road between Banjara hills road no.2 and Jubilee hills road no.5 as per RDP, alignment design, typical cross sections, pavement design, design of underpass, detailed quantities, cost estimates and preparation of Detailed Design report. Responsibility:

Prepared design of horizontal and vertical alignment of the road section, analysed the traffic characteristics, carried out pavement design and estimated the detailed quantities for road works, underpass and its approaches. Estimated the Project Cost and prepared the Detailed Design report. PROJECT #20

Name of the work : Six Laning of Chilakaluripet to Vijayawada Section of NH-5 in the State of Andhra Pradesh, India and its Operation and Maintenance on Build, Operate and Transfer (B.O.T) Basis.

Client : M/s Vijayawada Tollways Private Limited

Period : 2013

Scope of the Work:

The Scope of the work includes conducting various traffic studies, analysis of the data, and estimation of ADT & AADT traffic, review of past traffic data at toll plaza and review future road and transportation network developments in the area of influence of the project and traffic growth and toll revenue estimation along the project corridor and preparation of Traffic assessment and Toll revenue report.

Responsibility:

Identified and organised the various traffic surveys, analysed the traffic data and studied the traffic and travel characteristics. Reviewed the past traffic trends of toll plazas and estimated the future growth rates, studied the influence of various network and infrastructural developments in the project vicinity. Estimated expected toll revenue for future years. Prepared Traffic assessment and Toll revenue report.

PROJECT #19

Name of the work : Widening & Strengthening of Sections A) Tada To Nellore (NH-5) Km 52.800 To 163.600 (B) Nandigama To Ibrahimpatnam To Vijayawada (NH-9) Km 217.000 To Km 252.000 in the State of Andhra Pradesh, India and its Operation and Maintenance on Build, Operate and Transfer (B.O.T) Basis.

Client : M/s Swarna Tollways Private Limited

Period : 2013

Scope of the Work:

The Scope of the work includes conducting various traffic studies, analysis of the data, and estimation of ADT & AADT traffic, review of past traffic data at toll plaza and review future road and transportation network developments in the area of influence of the project, traffic growth and toll revenue estimation along the project corridor and preparation of Traffic assessment and Toll revenue report.

Responsibility:

Identified and organised the various traffic surveys, analysed the traffic data and studied the traffic and travel characteristics. Reviewed the past traffic trends of toll plazas and estimated the future growth rates, studied the influence of various network and infrastructural developments in the project vicinity. Estimated expected toll revenue for future years. Prepared Traffic assessment and Toll revenue report.

PROJECT #18

Name of the work : Development and Operation of Ajmer to Nagaur section of NH-89 (from Km 0.00 to Km 161.00) by two laning with paved shoulder in the state of Rajasthan through Public- Private partnership on DBFOT basis

Client : M/s GVR Infra Private Limited

Period : 2013

Scope of the Work:

The Scope of the work includes conducting various traffic studies, analysis of the data, and estimation of ADT & AADT traffic, traffic growth and toll revenue estimation along the project corridor and preparation of Traffic and Toll revenue report.

Responsibility:

Prepared detailed traffic data analysis for the various surveys such classified volume counts, origin and destination and registration number plate data. Estimated the diversion traffic on Project road, future growth rates, studied the influence of various network and infrastructural developments in the project vicinity. Estimated expected toll revenue and prepared the detailed traffic report. PROJECT #17

Name of the work : Lender’s Independent Services Allahabad Bank for Widening and Upgrading of existing road to two lane with paved shoulder for Bhopal – Berasia Section and Two lane with earthen shoulder for Berasia-Sironj section starts from Bhopal (km.4/100) and terminates near Sironj

(Km.00/000). Bhopal – Berasia – Sironj road is a segment of SH-23 situated on North Western part of Madhya Pradesh state having a total length of 106.900 Km. Client : Transstroy India Pvt. Ltd., Hyderabad.

Period : 2013

Scope of Work:

Estimate the various quantities involved in the project, vetting of cost and submission of Detailed Initial Assessment report to the Client.

Responsibility:

This is a Lender Engineer service. Studied the traffic characteristics, prepared a traffic report and estimated the detailed road work quantities for two laning with paved shoulders of project highway of length 106.900 Kms, prepared a cost vetting report on the project cost. PROJECT #16

Name of the work : Feasibility study for the Proposed Grade separator at Jubilee Hills Check Post Junction, Hyderabad.

Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : 2012

Scope of the Work:

The Scope of the work includes collection of traffic volume, study the alternate solutions of grade separation, prepare the schematic plans for different alternates and base line cost estimate for each alternate.

Responsibility:

Traffic analysis for the junction. Estimated lane requirement for horizon year traffic on grade separator and prepared the feasibility report.

PROJECT #15

Name of the work : Pre-Feasiblity study for FOB’s at selected locations in Hyderabad Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : 2012

Scope of the Work:

The Scope of the work includes site visit to all the selected locations, study the site conditions, pedestrian volume, characteristics and suggest the suitable pedestrian facility at each of the locations. Responsibility:

Conducted the site investigations and collected the pedestrian characteristics. Analyzed the study results to decide the type of pedestrian facility and prepared pre-feasibility reports. PROJECT #14

Name of the work : Preparation of Detailed Project report for the Proposed Grade separator at Tolichowki Junction, Hyderabad.

Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : 2012

Scope of the Work:The Scope of the work includes collection of traffic volume, study the alternate solutions of grade separation, find out the most suitable structural scheme, prepare the schematic plans and detail designs of the structure and detail cost estimate for proposal. Responsibility:

Organised field traffic surveys, conducted traffic analysis and estimated lane requirement for horizon year traffic on grade separator. Pavement design, plan and profile drawings. Prepared detailed project report.

PROJECT #13

Name of the work : Preparation of Detailed Project report for CC pavement on 100ft road from Moghal-Ka-Nala road to Puranapul Bridge, Hyderabad Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : 2012

Scope of the Work:

The Scope of the work includes collecting Road Inventory, design of pavement and design of alignment.

Responsibility:

Detailed road inventory, traffic analysis and assessment of lanes requirement. Designed the rigid pavement and prepared the detailed project report. Actively involved in project costing. PROJECT #12

Name of the work : Preparation of Detailed Project Report for the proposed road works of Old Bombay Road to Wipro Junction via Khajaguda and Nanakramguda & Nanakramguda Express Way Junction to Phoenix Info City via Nanakramguda

Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : 2012

Scope of Work:

The scope of work includes collecting road inventory, collecting 24hour traffic volume and pavement design, estimation of quantities, project costing and preparation of detailed project report. Responsibility:

Conducted road inventory, analysed traffic data, estimated MSA and prepared pavement design for proposed service roads. Involved in project costing and prepared the detailed project report. PROJECT #11

Name of the work : Preparation of Detailed Project report for road from Old Bombay highway to Nanakramguda, Hyderabad

Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : 2012

Scope of Work:

The scope of work includes collecting road inventory, collecting 24hour traffic volume and pavement design.

Responsibility:

Conducted road inventory, analysed traffic data, estimated MSA and prepared pavement design for proposed service roads. Involved in project costing and prepared the detailed project report. PROJECT #10

Name of the work : Consultancy Services for Feasibility study and Detailed Project reports for the proposed construction of grade separator / s at Narsapur cross roads to Fathenagar / Bowenpally Junction on NH – 9 at Secunderabad, A.P

Client : Greater Hyderabad Municipal Corporation, Hyderabad Year : 2012

Scope of Work:

The Scope of the work includes collection of traffic volume, study the alternate solutions of grade separation, find out the most suitable structural scheme, prepare the schematic plans and detail designs of the structure and detail cost estimate for proposal. Responsibility:

Organised and conducted the field traffic surveys. Prepared traffic analysis report, estimated the quantities for various alternative proposal. Prepared Feasibility report including study of alternate grade separator proposals and co-ordinated with client for finalising the proposals. Prepared DPR for the approved proposal and assisted in BOQ for Project costing. PROJECT #9

Name of the work: Two Laning with/without paved shoulder of Tindivanam – Krishnagiri Section of NH–66 from Km 37.600 to Km 214.110 on DBFOT (Annuity) basis under Phase – III in the state of Tamil Nadu

Client : Transstroy India Pvt. Ltd., Hyderabad.

Period : 2012

Scope of Work:

Estimate the various quantities involved in the project, vetting of cost and submission of Detailed Initial Assessment report to the Client.

Responsibility:

This is a Lender Engineer service. Estimated the detailed road work quantities of project highway for two laning with paved shoulders of length 182.182 Kms, prepared a cost vetting report on the project cost for submission to bankers.

PROJECT #8

Name of the work : Four laning of Tirupathi-Tiruthani-Chennai section on DBFOT Basis. Client : Transstroy India Pvt. Ltd., Hyderabad.

Period : 2012

Scope of Work:

Assess the project status, work progress time to time and submission of Monthly Progress reports to the Client.

Responsibility:

This is a Lender Engineer service. Prepared Monthly Progress report for the Project based on the information gathered from site inspections on the actual work progress on behalf of bankers to assess the work executed by Concessionaire.

PROJECT #7

Name of the work : Inventory, Design, Drawings and BOQ preparation for the Identification of Traffic signs, Sign Boards and other street furniture on selected corridors in the Hyderabad City Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : 2012

Scope of Work:

To collect the inventory of the selected corridors, identify the required traffic signs, street furniture, preparation of design drawings and BOQ’s.

Responsibility:

Conducted inventory study on all corridor’s, identified the required traffic signs such as cautionary signs, warning signs and informatory signs on each of the corridors and junctions. PROJECT #6

Name of the work : Four Laning of Jabalpur-Lakhanadone Section of NH-7 From (Km 465.600 To Km 546.425) in the State of Madhya Pradesh Under NHDP Phase IV on Design, Build, Finance, Operate and Transfer (DBFOT) Basis

Client : M/s IDBI Bank, Mumbai

Period : 2012

Scope of the Work:

The Scope of the work includes conducting various traffic studies, analysis of the data, and estimation of ADT & AADT traffic, traffic growth and toll revenue estimation along the project corridor and prepare the traffic report.

Responsibility:

Identified the various traffic surveys required. Detailed Traffic analysis, estimation of project traffic, estimation of growth rates for future, axle load data analysis, studied the influence of various network and infrastructural developments in the project vicinity. Estimated expected toll revenue and prepared Detailed Traffic report.

PROJECT #5

Name of the work : Feasibility study for the Proposed Bridge across Musi River at APSRTC, Hyderabad.

Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : 2011

Scope of the Work:

The Scope of the work includes collection of traffic volume, study the geotechnical characteristics, prepare the appropriate alignment and submit the detailed cost estimate for the proposed bridge. Responsibility:

Traffic analysis including the identification of lane requirement for the proposed bridge. Prepared feasibility report.

PROJECT #4

Name of the work : Feasibility study for the Proposed Skywalk at Secunderabad station, Hyderabad.

Client : Greater Hyderabad Municipal Corporation, Hyderabad Period : 2011

Scope of the Work:

The Scope of the work includes collection of traffic volume, OD data, study the alternate solutions of grade separation for pedestrian traffic interchanging between the five bus stations around the Secunderabad station, prepare the schematic plans for different alternates and base line cost estimate for each alternate.

Responsibility:

Organised the field traffic survey and made



Contact this candidate