Personal data
Family name
Oleti
Given name
Satya venkata surya Rama Rao
Date of birth
Nationality
Indian
Pass port details
New pass port no-Z4188421-Exp on-27/7/2027
Place of issue
Visakhapatnam-India
Email address
***********@*****.***
House telephone
0091 884-***-****
Contact-Mobile number
0091 986-***-**** (India)- Oman -009**-********
Languages fluent
English,hindi,telugu
Education
Associate member of institution of engineers-India- mechanical sec-a completed.
1985 to 1988 - National Council for Vocational Training (NCVT) or NVQ Draughtsman (Mech), Labour, Government of India in Bharat heavy plate & vessels LTD-visakhapatnam.-India.
1985 Board of intermediate Education, Hyderabad, India
1983 - Secondary School Education (SSC) (A.P)-India.
Computer skills
Autocad-2018, Autocad-2012, Microstation, MS-office, Spoolgen, Navis works, AutoCAD design review
MS Project, Primavera, UNIX, Auto Lisp, Caeser-ii pipe...etc
Working knowledge in PDS, PDMS.
Position Applied for: - Lead designer/senior designer (Pipe line/Piping)
Key experience:-
3years NCVT or NVQ industrial training:-
During 3years trained in Piping & plant layouts, vessels, columns, S&T heat exchangers, spheres & structural departments for detail engineering drawings preparation.
Working with ASME, ASTM, ANSI and Indian standards,etc.
7years experience in India:-
During 7years period worked in India for oil and gas fields cryogenic plants, fertilisers fields. Worked for turn key projects, basic design, front end engineering, detail engineering works in piping, mechanical and structural with EIL, UHDE..,etc Indian standards.
15years experience in Middle East:-
Working for EPC projects, Basic design, FEED, Detail engineering, field engineering support, project control department in quantity estimation and pre-commissioning activities. Worked in disciplines-piping, mechanical,structural,pipe line with international standards, Shell dep s & API codes, Saudi aramco,Qatar petroleum, Bechtel, Chiyoda, Technip, tecnimont, JGC, KNPC, Chevron, ENEL power, Air Liquide, Halliburton, Granhern and Tecnicas Reunidas & initec.
Projects worked in:
Oil & Gas, Field development & petrochemical plants
Refineries, Fertilizer
Power and desalination plants
Cryogenic Plants
Steel plants
Employment record
October 2010 to still date
Working in OXY-MUKHAIZNA-OMAN-rotation 5weeks/5weeks
April 2009 to October 2010
Piping,mech & structural-construction for Reliance project-India
October 2007 to March 2009
Tecnicas reunidas gulf co (Spain based company)-Saudi Arabia
August 2006 to august 2007
Tebodin & Partner LLC-Oman
August 2005 to August 2006
Piping,mech & structural works for NFCL project-India
August 2003 to June 2005
Belleli Energy-spa-Qatar
June 2002 to June 2003
AUTOCAD instructor in IEC, manipal institution-India
May 2001 to may 2002
The National Company for Mechanical & Electrical Works (Kharafi National)-Kuwait
August 1999 to may2001
CITROP InfoTech, COROMANDAL Fertilizers-India
November 1994 to august1999
Belleli Saudi Heavy Industries Ltd-Saudi Arabia
August 1992 to november1994
Liquid Air Engineering India Ltd-India
September 1989 to august1992
Bharat Heavy Plates and Vessels Ltd.-India
Assignments
October-2010 to till date Occidental Mukhaizna-Oman
Lead designer (site-Rotation based)
Responsibilities: -(Offplot &ON-plot)
OXY-Mukhaizna -facilities engineering support for filed construction activities.
FEED & Detail design works (QP,ADCO &PDO,shell dep standards)
Preparation of oil/steam/APO- well hook-ups,manifold area piping and plot plans.
Preparation of pipeline routing drawings-laterals/sub-laterals based on field study routing.
Preparation of pipeline alignment Dwgs/sheets.
Preparation of bulk mto s & final mto s for Detail design works..
Preparation of isometric drawings & tie in schedules.
Preparation of all drawings as per OXY stds, shell dep s & PDO,QP,ADCO standards.
Projects handled:
OXY-Steam Injection, Production, Water injection- On plot/Off plot Piping.
PDO-Hazer and Howqua field development
Sahil and Shah abudhabi field development
PDO-Farha and Saiwan field development
QP-khuff gas-FEED development
April-2009 to October-2010 Reliance industries Ltd-Kakinada-India
Senior Designer/Engg.coordinator
Responsibilities:
Preparation and Modification of piping, mechanical, structural and civil drawings and fabrication details
Materials take off from the drawings and AS-BUILT updation
October-2007 to Mar-2009TECNICAS REUNIDAS GULF CO.,(SPAIN)
Cad supervisor/Engg.coordinator
Responsibilities:
EPC BASED WORKS ( SAUDI ARAMCO )-FIELD ENGINEERING (CS,SS,LAS,CU-NI,RTR ETC)
Checking of detailed design drawings for construction -scope of work, identify the mistakes and deviations. (Disciplines-PIPING, MECH, STRUCTURAL, CIVIL, HSE ..,ETC).
Revise the drawings or update the drawings as per site changes.
Preparation of required procedures & method statements by the engineer guide lines.
Co-ordination to the project control department in quantity estimation in site.
3D-NAVIS WORKS for interference checking and model review for construction.
Preparation of drawings in by using MICRO STATION, AUTO-CAD, VISIO.
Pre commissioning activities for hydro test, pneumatic test packages preparation.
MTO verification and preparation of MTO take off for site required materials
Checking of piping iso s and pipe support drawings prepared by PDS designers in site.
Technical queries, change order identity and construction technical queries replies to subcontractors.
Projects handled:
HAWAIYAH-gas expansion plant-hawaiyah-Saudi Armco project.
2006 to 2007 Tebodin & Partner LLC, Muscat, Sultanate of Oman
Sr.designer (piping/mech)
Responsibilities:
FEED & Detail design works (PDO,shell dep standards)
Preparation of plant & well, manifold area plot plans.
Preparation of plant layouts, piping plans & piping general arrangements
Pipeline alignment Dwgs/sheets.
Preparation of bulk mto s & final mto s for DD jobs.
Preparation of isometric drawings & tie in schedules.
Preparation of all drawings as per shell dep s & PDO standards.
Preparation mto s for Cs, Las, Dss, Gre, Grp, hdpe linear.
Checking & drafting guidelines to the designers & draft persons
Projects handled:
PDO-lekhwair production station & Amine unit-FEED package.
PDO-Saih rawl south field development wellhead plot plans, manifold, piping
PTTEP-Wells-FEED & Detail designing-plot plans, piping..etc
PETROGAS-samah field water injection & fire water facilities FEED & As built.
2003 to 2005 Belleli Energy SPA-Qatar
Senior Designer (piping/mech)
Responsibilities:
EPC based works. ( CS,SS, LAS, GRP materials)
Preparation of isometric drawings and spool fabrication drawings.
Preparation of pipe support detail drawings.
Preparation of structural drawings-platforms and ladders.
Preparation of weight schedules for fabrication and erection.
Preparation of MTO S & weight estimation for tender & procurement activities.
Co-ordination to the project control department in quantity estimation from construction drawings.
Preparation of site queries in erection & work shop fabrication problems.
As built works for piping, mechanical, civil, structural ..etc.
Projects handled:
750mw RASLAFFAN power & desalination plant .Worked from starting to as built stage.
2002 to 2003 IEC, MANIPAL INSTITUTIONS-INDIA
AUTO CAD INSTRUCTOR
Responsibilities:
TRAINING STUDENTS IN AUTO CAD & AUTO LISP
Training classes in AUTO CAD 2d & 3Dmodeling-PIPING drgs, mechanical drgs..etc
2001 to 2002 The National Company for Mechanical & Electrical Works (Kharafi National) Kuwait
Piping Designer
Responsibilities:
EPC & Front end engineering works.
Preparation of plot plans, layouts and oil well layouts.
Preparation of isometrics and spool fabrication drawings.
Preparation of flow line networks for oil, gas, water injection, and lift gas facilities.
Preparation of pfd s, ufd s, p&id s & heat material balance diagrams.
Preparations of Material take off (MTO S).
Preparation of support drawings for piping.
Preparation of hydro test packages for pre-commissioning activities
Projects handled:
PIC & KNPC. Pipe spool & support fabrication drawings & MTO S.
Plot plans, piping general arrangements & pipe support drawings.
Conceptual studies for North Kuwait oil field development project chevron naido & Texaco with Halliburton and Granherne team.
1999 to 2001 CITROP InfoTech, COROMANDAL Fertilizers-India
Piping Designer
Responsibilities:
Preparation of CAD conversion drawings and as built drawings, structural, isometrics, plot plans.
1994 to 1999 Belleli Saudi Heavy Industries Ltd-saudi arabia
Designer (piping/mech)
Responsibilities:
EPC-Detail engineering fabrication works.
Preparation of Plot plans, plant layout & piping general arrangements
Preparation of isometrics and spool drawings.
Preparation of detail engineering drawings for vessels, columns, S& T heat exchangers
Preparation of pfd s, ufd s, p&id s
Preparation of pipe support drawings.
Preparation of structural drawings- Platform and ladder drawings
Projects handled:
Singapore aromatics, Saudi Arabian oil company, Qafco, Knpc, Saudi aramco, chiyoda, JGC,
Sadaf.
1992 to 1994 Liquid Air Engineering India Ltd-india
Designer (piping/mech)
Responsibilities:
Turn key projects & Front end engineering
Preparation of plot plans, piping layouts area wise.
Preparation of piping general arrangements.
Preparation of isometrics and spool fabrication drawings
Preparation of pfd s, ufd s, p&id s
Preparation of basic design sketches for vessels, columns, heat exchangers.
Preparation of detail engineering drawings for vessels, columns, heat exchangers
Preparation of structural drawings like platforms, ladders.
Preparation of Material takes off (MTO S)
Projects handled:
120 TPD Rajasree gas Ltd, HPN plants, Reliance jam nagar, -CRYOGENIC PLANTS.
1989 - 1992 Bharat Heavy Plates and Vessels Ltd-india
Draughtsman (piping/mech)
Responsibilities:
Turn key projects & Front end engineering
Preparation of plot plans, Plant layouts area wise.
Preparation of piping general arrangements.
Preparation of plant piping drawings area wise.
Preparation of isometrics drawings.
Preparation of pfd s, ufd s, p&id s
Preparation of pipe support drawings
Preparation of structural drawings like platforms, ladders.
Preparation of Bulk MTO S.
Projects handled:
Vizag steel plant, Rourkela steel plant, Durgapur steel plant,NFCL,HPCL.
The Other information which improves my Selection Chances
The above experiences in different Countries, with different client specifications, standards in different Fields helps me to work confidently at any field of Engineering Divisions, & Project control department in view of facts if I am selected I shall assure in carrying out all my duties to the entire satisfaction of my supervisors. I am sure that you would give me a chance to try my hand I promise you at the same time that I shall do my level best for the benefit of your company and Prove the correctness of your choice.
Thanking you in anticipation,
Yours Faithfully
o.s.v.s.ramarao
India mobile-986-***-****
Whatsapp+968-********
CURRICULUM VITAE