CURRICULAMVITAE
Malaya Samal
S/O Mr. Prahllad ch Samal
AT: Manpur
PO: Bhuinpur
Dist: Kendrapara
Mob No: 072******** // 931-***-****
State: Odisha
Email **-***********@*****.***, **************@*****.***
Skype ID: (**************@*****.***) pin: 754239
As an employee in your organization, I will bring focus on quality-based service. I’II tries my best to co-operate with other employees and to achieve the goal of organization, To be more competent in the field of Management through Continuous leering and strategic amalgamation of Man-Management with in the organization I work for.
EXPERIENCE 9.3 years
PRESENT EMPLOYER– ISGEC HEAVY ENGINEERING LTD, INDIA
(OPERATIONS, COMMISSONING AND MAINTENANCE)
From 30 TH AUG 2016. As an operation Engineer (O&M)
Key Result Area-
NOW I am currently working with NIRMA LTD, Gujarat, INDIA as a
Shift in charge operation and Commissioning (Boiler & Turbine) with ISGEC O&M.
1 x 410 CFBC
CIRCULATING FLUIDIZED RE-HEAT TYPE BOILER WITH DOUBLE LOOP SEAL STEAM COOLED HOT CYCLONE.
WITH TOTAL POWER OF 166MW THERMAL POWER, CPP/IPP
1 x 70 MW BHEL HP-LP TG
1 12 MW backpressure TG.
Auxiliary:
4 2.9 cal capacity FIVES MAKE OIL BURNERS.
2 60% PA FAN
2 60% SA FAN
2 60% ID FAN
5 x LOOP SEAL BLOWERS.
3 260TPH KSB FEEDPUMPS.
6 20TPH DCFS.
12 10 TPH GRAVIMETRIC FEEDERS.
3 395TPH CEP.
2 25TPH HP HEATERS.
AOP,MOP,COP AND ALL.
MY last all and present employers following :
Occupational Safety and Health Administrationrules (USA).
LAST -UNITS:
1.BECOSA ELECTRIC COMPANY. For 1.7 years as a Shift in-charge.
105 MW IPP THERMAL UNIT.
3 x 142 TPH, CFBC ISGEC MAKE OVER FIRED BURNERS.
3 x 35MW, SNM MAKE TG.
FUEL’S - 100% pet coke, 100% coal, 50%LDO
CHP was supplied by ISGEC with 100TPH capacity.
High grade coal and Pet coke.
2. HPCL-HMEL (SITE) 168MW THERMAL AND COMBINE CYCLE POWER PLANT.
2*300 TPH CFBC Boiler makes ISGEC (With Lenses Burner).
Fuel Type: -Pet coke /Imported Coal /Indian Coal
Working pressure 110 kg/cm2
Working temp 540 5degc
Burners – fives make (LDO, LCO, and RFG)
CHP supplied by L&T India with the capacity of 500TPH.
Responsibility- Commissioning /Operation and Maintenance activity Boiler.
3.DCM SHREERAM: 210 MW THERMAL UNIT.
1*300 TPH CFBC Boiler makes ISGEC
Fuel Type: - Pet coke /Imported Coal /Indian Coal
Working pressure 105 kg/cm2
Working temp 540 5degc
Burners – fives make (LCO)
4. INLAND POWER LTD.
126 MW THERMAL POWER.
FROM 16TH AUG 2014 to 12TH AUG. 2016).
Designation:SI/DCSEngineer.(Operations)
Key Result Area
Boiler Capacity-250 TPH Make-WUXI HUAGUANG (Compact type /hot cyclone).
Type-C.F.B.C, Water tube Natural Circulation.
Working Pressure -110KG/CM2
Steam temp -540 5degreecelsius
Turbine Capacity-63 MW Make–HTC
Type-Condensing.
Operation & commissioning Responsibilities;-
1To maintain all the operation parameters within the limit of CFBC.
2Handling Start up /shut down/tripping of boiler and Turbine.
3Maintaining environment and maintaining safety standards.
4Minimum plant trip outs – Continuous monitoring of process parameters.
5Effective operation of plant &equipment’s, plan organizes& coordinates execution of operational activities of thermal power plant.
6People management – To develop the subordinates skill & knowledge for efficient & smooth operation.
7Inventory management.
8Safety- Zero accidents in the areas of power plant.
9Boiler runs with pet coke upto 100%.
10Every situation of boiler operation and Maintenance always follow standard practice.
11Responsible for field & DCS operation of gas & steam turbine operation.
12Implemented Standard Operating Procedures, equipment lockout tag out
13Procedures of power plant as per international standardization of organization.
14Performing the functions of troubleshooting and
Breakdown/preventive/corrective maintenance for reducing downtime tominimum.
15. CHP Operation and maintenance.
5.Employer –SAL STEEL LTD, 40MW THERMAL UNIT. CPP
Designation: DCSEngineer.
Key Result Area (1X40MW)
TG-1X40MW
Steam turbine (BHEL)
Boiler-110 TPH, 60TPHType-AFBC, 53TPH WHRB, 10TPH WHRB
Water tube Natural Circulation, Boiler. (CVL)
CHP supplied by BEVCONE 150 TPH.
Operation Responsibilities;-
1To maintain all the operation parameters within the limit of AFBC.
2Handling Start up /shut down/tripping of boiler.
3Maintaining environment and maintaining safety standards.
4Minimum plant trip outs – Continuous monitoring of process parameters.
5Effective operation of plant & equipments, plan organize & coordinates execution of operational activities of thermal power plant.
6People management – To develop the subordinates skill & knowledge for efficient & smooth operation.
7Inventory management.
8Safety- Zero accidents in the areas of power plant.
6.Employer –SHYAM ENERGY LTD. 93MW CPP.
Designation- SHIFTINCHARGE/ENGINEER.
Key result area. (2*30MW, 1*33MW)
BoilerMake-VISHONS AND CVL
Capacity-2X135TPH Type-AFBC
1X54TPH, Type-AFBC
Natural circulation.
Turbine Make-HTC 2X30MW AND BHEL 1X 33MW.
CHP made by BEVCONE 250TPH Capacity.
Operation Responsibilities ;-
1To maintain all the operation parameters within the limit of AFBC.
2Handling Start up /shut down/tripping of boiler.
3Maintaining environment and maintaining safety standards.
4Minimum plant trip outs – Continuous monitoring of process parameters.
5Effective operation of plant & equipments, plan organizes& coordinates execution of operational activities of thermal power plant.
6People management – To develop the subordinates skill & knowledge for efficient & smooth operation.
7Inventory management.
8Safety- Zero accidents in the areas of power plant.
Technical Qualification
B.TECH, Mechanical Engineering (with 7.0CGPA)
Personal Memorandum
Name : Malaya Samal
Father’s Name : Mr Prahllad ch samal
Date of Birth : 11th oct 1989
Nationality : Indian
Passport no. : N5160985
Hobbies : Cricket, Reading,
Language Known
: English, Spanish, Hindi, ODIYA
E-Mail **-***********@*****.***
Skype ID - **************@*****.***
Mob- =917*********
MALAYA SAMAL