Post Job Free
Sign in

Engineer Electrical

Location:
Patna, Bihar, India
Salary:
30000
Posted:
August 27, 2020

Contact this candidate

Resume:

NILADRI MALLICK

Email: ****.******@*****.***, *******.*********@**********.***

Mobile: 903-***-****, 766-***-****

Address: ***/*, ******* **** ****, Near SBI, P.O Garulia, 24 PGS (North), WB-743133

PROFESSIONAL OBJECTIVE:

To work in a growth oriented company where I will have the opportunity to work in a challenging environment and where my technical and analytical skills can contribute to my work and at the same time, endeavor to acquire newer and sophisticated skills.

Total Experience: 6 year 6 month

Company Name and address: E.M.C ltd (since May 2018 to present)

Designation: Engineer Electrical(project) (since 25th May, 2018 to 24th March 2019) Aurangabad,Bihar

Responsibility:

Handling whole site Engineering work of RGGVY 12th plan.

1. Survey all UE and IE village and make survey drawing and approve it by client.

2. Make M.R.N (Material requisition note) or Indene according to the survey and issue this material in SUB Contractors head.

3. Supervise whole erection and installation work of SUB Contractors.

4. Make J.M.C Drawing and J.M.C documents after completion of erection.

5. After J.M.C submit T.O.C to the Clint. If any rectification required, it become rectify quickly.

6. After Hand over of village, billing of SUB contractor and reconciliation work of material is done.

Designation: Engineer Electrical (Project) (since 25th March 2019 to 16th September 2019) Purbi Champaran(Motihari)

Responsibility:

1. Survey all UE and IE village and make survey drawing and approve it by client.

2. Make M.R.N (Material requisition note) or Indene according to the survey and issue this material in SUB Contractors head.

3. Supervise whole erection and installation work of SUB Contractors.

4. Make J.M.C Drawing and J.M.C documents after completion of erection.

5. After J.M.C submit T.O.C to the Clint. If any rectification required, it become rectify quickly.

6. After Hand over of village, billing of SUB contractor and reconciliation work of material is done.

Designation: Engineer Electrical(project) (since 17th September 2019 to present) Aurangabad,Bihar

Responsibility:

Handling whole site Engineering work of RGGVY 12th plan.

1. Survey all UE and IE village and make survey drawing and approve it by client.

2. Make M.R.N (Material requisition note) or Indene according to the survey and issue this material in SUB Contractors head.

3. Supervise whole erection and installation work of SUB Contractors.

4. Make J.M.C Drawing and J.M.C documents after completion of erection.

5. After J.M.C submit T.O.C to the Clint. If any rectification required, it become rectify quickly.

6. After Hand over of village, billing of SUB contractor and reconciliation work of material is done.

Company Name and address: Medhaj techno concept private ltd (since April 2017 to 24th may,2018)

Designation: Project Engineer (since 10st April, 2017 to 24th may,2018) Araria,Bihar

Responsibility:

Handling whole P.M.A work of Mukhya Mantri Vidyut Sambandh Nischay Joyjona (A.P.L electrification scheme)

Monitoring survey of Trunkey Contractor of all APL consumers in Areria district of Bihar.

Supervising whole erection work of Trunkey Contractor:-

a.Checking Quality of materials which is require in erection and installation work.

b.Supervising whole erection and installation work and verifying the work.

Generate first billing of all APL consumer and add them into the billing circle.

Company Name and address: Last Peak Data Private Ltd (since 4 Feb. 2016 to 1st Feb.2017)

Designation: Site Engineer (since 1st January, 2017 to 1st February, 2017) Nagaland

Responsibility:

Handling Quality monitoring and quality assurance project work for DDUGJY project in Nagaland

Quality Monitoring and Quality Assurance plan :-

a)To prepare a Quality Assurance (QA) Plan with the approval of the utility (mainly BOQ, BOM and SLD drawing of project site).

b)Field quality inspection of ongoing/ completed works.

c)Joint inspection (along with representative of state utility) of material at site on sample basis i.e. 10% of major materials (Poles, Conductor, Meters, Transformers, Cable).

MIS Report updating :-

a)Assisting utilities (mainly BOQ, BOM and SLD drawing of project site which is approved by state representative) in timely update the information on the Project Management Cell.

b)Periodic reporting of inspection to the Project Management Cell.

Designation: Site engineer (1st February to 15th May) & (5th August, 2016 to 31th December, 2016) - Assam.

Responsibility:

Handling Energy audit of transmission & distribution line of Byrnihat Industrial area, Meghalaya Power Distribution Company Limited.

Predominately Collecting CMRI reading meters of various variant substation i.e.( 132/33 KV & 33/11 KV )

Collecting CMRI reading of all meters of industrial & commercial consumers

Meter reading bifurcation: -

1.132 KV for industrial consumers,

2.33 KV for industrial and commercial consumers

3. 11 KV for industrial and commercial consumers.

For new connection of 33 KV or 11 KV: I need to update in GIS network by drawing SLD diagram which include CB, CT, PT, transformers.

Designation: Site engineer (since 24th may, 2016 to 5th August, 2016- Goa.)

Responsibility:

Handling R.A.P.D.R.P project of Madgao City,Goa

Surveying of all substation up to 33/11 KV.

Draw single line diagram of all substation in AutoCAD and fill its attribute in excel sheet.

Company Name and address: West Bengal State Electricity Distribution Company Ltd

Kolkata. (Since 17 February 2014 to 16 February 2015)

-

Designation: Apprentice Trainee

Responsibility:

Supervising and maintenance work of 7 33/11 substation of Naihati division.

Monitoring whole installation and repairing work of switch gear (C .B), Current transformer, potential transformer, H.T pole erection, 33KV switch gear substation panel, and underground cable etc.

Supervising the commissioning work of testing engineer for new installed substation apparatus and also helping them to solve any type of problem.

Surveying new and proposed 33/11 kv high tension line route and substation.

Company Name and address: Biswas Dutta and Biswas Enterprise.

-Kolkata.( since 06 December 2012 to 10 January 2014)

Designation: Electrical supervisor.

Responsibility:

Supervising and maintenance work 33/11 kv H.T line and substation of W.B.S.E.D.C.L.

Supervising the installation and repairing work of switch gear (C .B), Current transformer, potential transformer, H.T pole erection, 33KV switch gear substation panel, and underground cable etc.

EDUCATIONAL QUALIFICATIONS:

GRADUATION LEVEL EDUCATION BACKGROUND

Completed B.TECH in Electrical Engineering from WEST BENGAL UNIVERSITY OF TECHNOLOGY in 2012 with D.G.P.A: 6.82.

SCHOOL LEVEL EDUCATIONAL BACKGROUND

Passed Higher Secondary Examination under W.B.C.H.S.E. board from ISHAPUR NORTHLAND HIGH SCHOOL in 2008 with 67.2% marks.

Passed secondary examination under W.B.B.S.E. board from RAMKRISHNA VIVEKANANDA MISSION SCHOOL in 2006 with 75.13% marks.

SUBJECTS KNOWN:

Control system

Power System

Power Electronics

Machines

VOCATIONAL TRAINING DURING COLLEGE:

Vocational training in DURGAPUR PROJECT LTD

Training Period: 29 June 2011 to 28 July 2011

Specifications:

It has a total capacity of 701 MW which divided into 6 unit and total coal input 6669 tons per day

UNIT wise power capacity coal input and availability:

Description

Unit 1

Unit 2

Unit 3

Unit 4

Unit 5

Unit 6

Total

Capacity(MW)

30

30

77

77

77

110

401

Coal input MT/D

504

504

1260

1260

1293

1848

6669

Availability 100

100

100

100

100

100

It generates and distribute at 11 KV in its licensed area in Durgapur and transmission of power to WBSEB.

It Produce metallurgical coke of blast furnace and Coke oven gas as industrial fuel crude coal tar which is available from its recovery types of coke oven batteries and Treatment and distribution of water for drinking and industrial use .The growth in power in the D.P.L commanded area is around 20% per annum and the current demand being around demand being around 120 MW which is 30% of total generation capacity of the units.

PROJECT AND TRAINING

Project name: Position control of dc servo motor

Team Size: 4 member team

Brief description:

we use dc servo motor to control the position of the bushing which connect to the motor shaft and tracking the error of position of bushing for every PWM signal Here we have used a PWM based circuit that smoothly control the DC motor.

Apparatus use:

Power amplifier and error amplifier: to design power and error amplifier we use SL100, SK100, ECN055, ECC055 transistor

One single turn and multi turn potentiometer (1-5 KΩ)

741-Preset operational amplifier 100 KΩ and 10 KΩ

Bush and clamping

One toggle for battery on and off

Servo motor

Load shaft

Resistance: 100KΩ, 10KΩ, 47KΩ three resistances.

Applications: this control strategy has many applications such as

Rader control of a ship

Tension control of a sheet roll in pipe line

X-Y recorder

Potentiometric recorder etc.

Training name: Project base training on P.L.C from Electronics regional test laboratory (east) Center for electronics test engineering.

Project name: Sequential control of three motor.

Team Size: 5 member team.

Brief description:

We use PLC ladder logic to make sequential control of three motor and implement it in SCADA.

Apparatus use: SIEMENS S7-300 PLC and SIEMENS WINCC SCADA.

OTHERS ACTIVITY:

Computer proficiencies: MS Office, Windows XP, Windows 7, C and Internet Surfing

Hobbies: Listening Music, playing and watching football

Language proficient in:

(Read, Write & Speak) English, Hindi & Bengali

I hereby declare to bear the responsibility for the correctness of the information given in the resume.

Date

NILADRI MALLICK

PROFESSIONAL EXPERIENCE:



Contact this candidate