PROFILE Looking for challenging career opportunities and assignments in the field of project engineering & management in high rise building, commercial complex, residential projects, urban infrastructure projects and other real estate sector projects.

EDUCATION MASTER’S DEGREE IN CONSTRUCTION & PROJECT MANAGEMENT 2012 – 2014 Faculty of Technology, CEPT University, Ahmedabad

BACHELOR’S DEGREE IN CIVIL ENGINNERING 2008-2012 L.D. College of Engineering, Gujarat Technological University, Ahmedabad

Aggregate score - CGPA: 8.98 of 10; CPI: 8.76 of 10 - Highest in GTU Civil HIGHER SECONDARY SCHOOL 2008 St. Xavier’s High School, Surat Aggregate score – 77.20%

WORK HISTORY Kalpataru Ltd.(Real estate flagship of Kalpataru Group), Mumbai, Maharashtra, India ASSISTANT MANAGER, CENTRAL PLANNING OFFICE April 2017 –Present SENIOR PLANNING ENGINEER June 2016 – March 2017 Cluster Projects: Ongoing

Planning and project control:

Preparation of project strategy, project logistics, project phasing & finalize integrated master program for management’s approval.

Based on cost to complete and project strategy preparation of cash-flow of project.

Prepare Programs for Vendor Appointment for all trades’ packages for inclusion into their respective trade’s tenders / contracts

Review tender submission and negotiate (technical requirement) with bidders based on schedule, manpower required, logistic plan and equipment deployment plan.

Coordinate the planning / project requirements of consultants, contractors, vendors, etc. & ensure the same is a per their respective contract documents.

As per the (integrated) Master program, targets are provided to Cross Function Departments

(Liaison Approvals, Design, Contracts, Procurement & Execution)

Co-ordination with internal & external stakeholders, & across cross-functional teams for project issues.

Coordination for liaison compliances (such as Royalty, SWM, Tree NOC, CFO NOC, OC – Documents & Compliances)

Identifying bottlenecks that might affect project progress and organizing project review meetings with management to highlight the same and avoid delays.

Review/Prepare of all the tracked schedule, delay analysis, risk register, look ahead plans etc. of site planners.

Contract administration:

Prepare and maintain TIA (Time Impact Analysis). Review of claims from contractors & / or vendors & prepare analyses & reports under the purview of Cluster Head and Planning HOD.

Identify potential contractual risks and list, maintain & track all such contractual risks on an agreed frequency. Track & monitor all incoming & outgoing contractual correspondences via letters and ensure all correspondences are appropriately documented Projects: Preconstruction phase

Upon Project Kick-off Meeting, preparation of 75 day preconstruction action plan.

Emphasis on Vision document, Product Mix, Liaison Brief & Consultant appointment, assisting smoother transition to concept initiation.

Preparation of program incorporating stages from identification of team members, appointment of consultants, concept stage, civil vendor finalization, project strategy till initiation of the project.

ASSISTANT MANAGER - PLANNING June 2014 – May 2016 JMC Projects (I) Ltd. - part of Kalpataru Group, Mumbai, Maharashtra, INDIA Project: Adhiraj Residential Township 2B + GF + 2P + 2 Fire escape Floors +56 Habitable Floors Core Competencies:

Preparation of project prestart budget.

Preparation of initial planning for the entire project in consultation with site in charge with resource requirement in Microsoft Project.

Preparation of monthly detailed planning (Micro level Schedule) based on the initial planning with breakup of main activities and resource requirement (Material and Labour) for the same.

Preparation of variance analysis by cost performance index & schedule performance index.

Preparation of Achievement based budget, rate analysis, S – curve and reconciliation statements.

Preparation of sub-contractor bills in iPMS (ERP) system of the company.

Detail study of reinforcement drawings to prepare and certify bar bending schedule (BBS). PROJECT MANAGEMENT TRAINEE May 2013 – June 2013 Simplex Infra Ltd, Maharashtra, INDIA

Project: World One, King Tower 117 Storey high rise residential project (+445m height) As a part of project training worked in different departments like Planning, Quality assurance and control, Site Execution, Plants and Machineries, Safety and Quantity Surveying. AWARDS Gujarat Institute of Civil Engineers & Architects GICEA 2011 and 2012 3 Gold medals for securing highest CPI in B.E. Civil Engineering, GTU The Institution of Engineers, India 2011 – 2012 2 Gold medals for securing the highest marks in Civil engineering branch from GTU GATE Civil Engineering 2012

Qualified with a score of 322

ACADEMIC

PROJECTS

Faculty of Technology, CEPT University Post-graduation Research Projects Thesis Developing a decision support system to assist real estate developer L.D. College of Engineering, GTU Undergraduate Final Year Project Autoclaved Aerated Concrete - An appropriate alternative to Conventional Brick SKILL SUMMARY Technical / Computer

Proficient in Autodesk AutoCAD, Microsoft Office Suite and Microsoft Project. Working knowledge of Primavera, Adobe Photoshop and Microsoft Visio. Language

Multilingual proficiency in English, Hindi and Gujarati REFERENCES MR. RAJENDRA SHELAR GM – Planning

Kalpataru Ltd. ********.******@*********.***; +91-983******* MR. NARENDRA TAKALKAR AGM – Planning

JMC Projects (I) Ltd. ********.********@***********.***; +91-982*******