Post Job Free
Sign in

Engineer Electrical

Location:
Coimbatore, Tamil Nadu, India
Salary:
120000
Posted:
August 25, 2020

Contact this candidate

Resume:

C.SUNDARESAN

Kuwait

Mobile No.:965-********

Email: **********.***@*****.***

OBJECTIVE

** *****’ Experience with Graduation in B.E [Electrical and Electronics], Seeking Engineering Assignments in the domain of Project Management & Contracts Management with an organization of high repute.

PROFESSIONAL SYNOPSIS

Working as a Senior Project Engineer for the project of New ALSABAH Hospital at Shapoorji & Pallonji (Kuwait) from Nov 2016 to Present

Worked as a Project Engineer for the project of Awqaf Headquarters at Gulf Engineering (Kuwait) from Nov 2015 to Nov 2016

Worked as a Project Engineer for the project of College of Technology Studies at Gulf Engineering (Kuwait) from Nov 2013 to Nov 2016

Worked as a Project Engineer for the project of HONDA CONSTRUCTION

PLANT & Office at Shimizu corporation India private limited from Apr 2012 to Oct 2013

Worked as a Project Engineer for the project of NEW DOHA INTERNATIONAL AIRPORT (QATAR) at AKTHOR, DARWISH, CYBERCO, TREY (Joint venture European concern) from April 2011 to April 2012 Bechtel Consultant

Worked as a Electrical Project Engineer for Emirates Hotel (60 Floor) at Blue Sky Electromechanical LLC, DUBAI from Jan 2008 to April 2011-Arch Group

MAJOR PROJECTS HANDLED

New Al-Sabah Hospital - (B+G+12)

Awqaf Headquarters - (B3+B2+B1+G+16)

Kuwait University - (B+G+2) College Project

Honda Motor Cycle & Scooters Project – Manufacturing Plant & Offices

New Doha International Airport - Airport Project

Emirates Hotel - (B2+B1+G+60) High raised hotel project

EDUCATIONAL QUALIFICATION

Certification : Project Management from Royal Institute of Chartered Scotland

Qualification : B.E (Electrical & Electronics Engineering)

University : Anna University, Chennai

Year of passing : APRIL 2007

HSC (12TH) : 87.16% from National School (2003 passed out)

SSLC (10th) : 80.6% from National School (2001 passed out)

KNOWLEDGE IN ELECTRICAL & MECHANICAL SYSTEMS:

HT panel & LT panel, ATS & Capacitor bank

Transformers, Generators,Busduct,HT & LT Cables

Lighting,power,Fire alarm(Edwards & Simplex),Lightning arrestor and Earthing

Data, CCTV, Public Address system, Access control system

AHU-DB’s and starter panels for Air Handling Unit

Isolators and starters panels for Fresh air fan and exhaust fans

Knowledge in installation and testing & commissioning of BMS System(Siemens)

• Knowledge in AHU, FCU, Chiller pumps, Condenser Pump, FM-200, Foam, Chiller panels, Sump Pump, Flow Control Station

SPECIAL SYSTEMS IN THE PARTICULAR PROJECT :

1.AWQAF Headquarters (2015 To Present):

Bus duct Risers Inside the Electrical Shaft up to 16th Floor

More than 100 rooms & 65 Mechanical Rooms

Gym, Cinema Hall,Projector room

Raised floor for more than 100 rooms

Building Management System for the entire Building

Electrical & Electromechanical

2.College of Technology Studies( 2013 To Present) :

More Than 200 class rooms, Separate mosque

More Than 60 AHU Mechanical Rooms and 28 IDF Telecommunication rooms

Floor Boxes installation almost in all shops

Cinema Hall and Projector room inside the Cine Complex

3.New Doha International Airport(2010 to 2012) :

Main Passenger Terminal

Hangers for the aircraft Maintenance

Cargo Handling for the baggage’s

Full GI works for light, Power and all Data systems

Fuel Pit, cock Pit and Air handling Pit for the aircraft during maintenance

4.Emirates Park Tower Hotel (2008 to 2010):

Bus duct Raisers and Feeders Inside the Electrical Shaft up to 60th Floor

Transfer Mechanical Floors For Every 25 Floor for the installation of Fresh Air & Smoke Fans

Primary and Secondary chillers because of High Raised Building

More Than 120 Ahu Mechanical Rooms and 3 Main MCR for Telecommunication

Fire Alarm System is Coupled with all the systems

Siemens BMS system Installation and testing and commissioning knowledge for the full project

Project Wise Detailed Scope of Work :

1. PRESENT EXPERIENCE (NOV 2013 TO PRESENT)

Working as an Electrical Project Engineer at Gulf Engineering company( “A” grade MEP company at Kuwait)

Project

Details

Name : College of Technology Studies & AWQAF Headquarters

Details : B+G+02 & B3+B2+B1+G+16

Client : Public Authority Applied Education training & AWQAF

Consultant :Al Dowaliah & KTCB

Main Contractor :Combined Group Contracting & KMC

Project Cost :38 Million KD

SCOPE OF WORK:

Project Budget / Project Management

Involving in project initial process (Shop drawing, composite drawing, coordinated drawing, material related submittals, voltage drop calculation)

Preparing LPO for material based on various quotes obtained from suppliers

Getting approvals from Kuwait fire department(KFD) for fire alarm systems

Getting approvals from Ministry of Electricity & Water(MEW) for electrical systems

Involving in Project closeout process ( As built drawing, Operation and maintenance manuals, Spare parts list, Warranties and Demonstration & training)

2. TECHNICAL SKILLS FOR AWQAF AND COLLEGE OF TECHNOLOGY STUDIES:

Sound Knowledge of LT panels,ATS,Generators,MSB,SMSB,DB,lighting,power,Data,fire alarm, Public address, Clock Systems,CCTV,BMS and Lightning arrestor

Installation and termination of AHU-DB’s, starter panels and Duct heater

Installation of Bus duct raiser and feeder in the electrical shaft

Installation and termination of Smoke Exhaust fan(SEF) Isolators and starters

Installation and termination of Exhaust Air Fan (EAF) Isolators and starters

Coordinating with BMS for the starter panels connection

Coordinating with BMS for DDC panel termination

Coordinating with HVAC for cooling tower MCC panel connection and its VFD commissioning

Coordinating with HVAC for Chiller panels and its flushing work process

Coordinating with Plumbing for sump pump, Foam systems and its electrical connection

3.PREVIOUS EXPERIENCE (APR 2012 TO OCT 2013)

Working as an Electrical Project Engineer at Shimz corporation India pvt limited

Project

Details

Name: Honda Construction plant

Details : Construction of manufacturing plant for Honda scooters

Client : Honda

Project Cost : 400 Crores

WORKING INSTALLATION:

Installation,laying,termination of HT cables as per ITP standard

Installation of HT Generators and HT transformers in Substation

Installation of cable tray & raceway for HT Cable pulling

Installation of MLTP Panels and EMSB panels

Installation of lightning arrestor

Installation of Earth pits for panels,Generators,Transformers & Battery charger

TESTING AND COMMISIONING:

Conducting Lux level testing for lighting.

Conducting HIPOT, Insulation resistance and continuity test for HT cables and LT cables

Conducting Insulation resistance, phase sequence test for Panels

Conducting earth resistance test for earth pits

• Conducting IR, magnetic current, magnetic balance, vector group, winding resistance and ratio test for transformers.

4.PREVIOUS EXPERIENCE: (APRIL 2011 TO APRIL 2012)

PROJECT DETAILS:

Working as a Project Engineer in NEW DOHA INTERNATIONAL AIRPORT at QATAR

Project: New Doha International Airport

Client : QATAR AIRWAYS

Consultant : Overseas Bechtel Inc

Main contractor : ADCC

Total Project Cost : 11 Billion U.S. Dollar

SITE RESPONSIBILITIES:

Make sure all relevant specification, documentation(Method statement, Material data sheet, ITP) and drawings are obtain before start of the work

Inspection of Low voltage switchgear panels, cables according to Inspection test plan activity

Inspection of lighting and power conduits according to ITP activity.

Conducting MEGHER testing of cables

Inspection of earth rods & earth pits according to ITP activity

Witness of testing of earth resistance between earth rods and record the values

Inspection and testing of Wiring devices

Conducting inspection of pre functional and functional test of UPS

TESTING & COMMISIONING (TCP) :

Witness the Primary injection & secondary injection testing of relays in panels

According to testing and commissioning procedure

Inspect the decibels testing (85db to 88db) for public address system and check

The coordination with fire alarm due to emergency condition

Inspect and testing the Automatic transfer switch for generator during power failure condition and check the automatic transfer is take place in less than 5 seconds

Testing the UPS by checking N+1 condition, the two of the 160KVA ups is called N+1 condition, during failure of one UPS the other can withstand the full load for 30min

Inspect the testing of telecommunication and distribution system by checking the length of the CAT cable and fiber optic cable. By OTDS tester if it is CAT cable the length should be less than 90 meters, if it is fiber optic the length should be more than 90 meters

Inspect the testing of fire rated MCKEON door for LVS room and checking that the fire rated door should automatically close during emergency condition and prevent the LVS room from fire

Inspect the testing of intelligent door panel for all kind of non fire rated and fire rated door.Intelligent door panel consist of relays for open and closing the door automatically.

Inspect the Megher testing for all kind of cables ranging from 400v to 600v.

Inspect the testing of GROUND POWER UNIT, where GPU is the 400HZ supply for

Aircraft during aircraft is at rest condition.GPU consists of nose pit, PCA pit, fuel exhaust pit.

Inspect the testing of ACCESS CONTROL SYSTEM for all doors and the access control system is linked with intelligent door panel.

The testing and commissioning of all these electrical activities is done according to approved T & C procedures given by the consultant. The submission of T & C should include the installation of all electrical activities which means inspection request form should attached during T & C.

5.PREVIOUS EXPERIENCE (JAN 2008 TO APR 2011)

• Worked as a Project Engineer (construction and high rise building) in Electrical field in BLUESKY L.L.C, Dubai, U.A.E

Project: Emirates Hotel

Details: 60 Floor Building

Consultant: Arch group

Main Contractor: Brook Field Multiplex

SITE RESPONSIBILITIES:

Installation of DDC Enclosures and pulling of 2 core Belden cables for DDC communication

Installation of I/O Devices inside the AHU mechanical rooms for Siemens system

Installation of AHU Starter panels and Fan & Smoke System Starter panel in the mechanical floors

Installation of Temperature sensors, Pressure sensors and Flow Switch in the chiller pipes after the provision of well made by HVAC team

Commissioning of all BMS system

Installation of Smoke Detectors, heat detectors, Break glass, Horn & Strobe & Fire man Switch

Installation of Fire alarm Wiring and BMS Wiring inside the AHU Starter Panels and Fan Starter Panels

Installation of lighting and power DB

Tapping of power from Bus duct raiser by pulling of cable from the isolator to near by Distribution Boards

Estimation Responsibilities:

Review tender document in detail and develop clear understanding the scope of work and responsibilities.

Perform basic design and Engineering calculations for various Electrical systems like Load schedule calculation, Transformer sizing, Generator sizing, Circuit breaker sizing, Capacitor bank sizing, voltage drop, cable sizing, cable tray, trunking and Earthing & Lightning protection system etc.

Quantity take-off for all Electrical Systems from the consultant /tender drawings.

Floating Enquiry to the Suppliers / Manufacturers as per the makes specified in the tender documents.

Preparation of cost comparison sheet for all suppliers & Sub-contractors offer.

Evaluating of vendors’ technical and commercial proposals, and providing recommendations.

Preparation of BOQ and compiling accurate and efficient estimation for the projects.

Preparation of technical proposal for tender submission.

Familiar with the various standards like IEC, BS EN, Ingress protection (IP ratings)

PERSONAL DETAILS:

Father’s Name : N.Chandrasekaran

Date of Birth : 31.05.1986

Marital Status : Married

Nationality : Indian

Languages Known : English, Tamil, Hindi (speak only)

Permanent Address : Trichy, Tamilnadu, India

Passport No : G 2278580

Issue & Expiry on : 12/04/2007&11/04/2017

Driving license : QATAR, INDIA, KUWAIT

DECLARATION

I do hereby confirm that the information furnished above is true to the best of my knowledge and beliefs.



Contact this candidate