C.SUNDARESAN
Kuwait
Mobile No.:965-********
Email: **********.***@*****.***
OBJECTIVE
** *****’ Experience with Graduation in B.E [Electrical and Electronics], Seeking Engineering Assignments in the domain of Project Management & Contracts Management with an organization of high repute.
PROFESSIONAL SYNOPSIS
Working as a Senior Project Engineer for the project of New ALSABAH Hospital at Shapoorji & Pallonji (Kuwait) from Nov 2016 to Present
Worked as a Project Engineer for the project of Awqaf Headquarters at Gulf Engineering (Kuwait) from Nov 2015 to Nov 2016
Worked as a Project Engineer for the project of College of Technology Studies at Gulf Engineering (Kuwait) from Nov 2013 to Nov 2016
Worked as a Project Engineer for the project of HONDA CONSTRUCTION
PLANT & Office at Shimizu corporation India private limited from Apr 2012 to Oct 2013
Worked as a Project Engineer for the project of NEW DOHA INTERNATIONAL AIRPORT (QATAR) at AKTHOR, DARWISH, CYBERCO, TREY (Joint venture European concern) from April 2011 to April 2012 Bechtel Consultant
Worked as a Electrical Project Engineer for Emirates Hotel (60 Floor) at Blue Sky Electromechanical LLC, DUBAI from Jan 2008 to April 2011-Arch Group
MAJOR PROJECTS HANDLED
New Al-Sabah Hospital - (B+G+12)
Awqaf Headquarters - (B3+B2+B1+G+16)
Kuwait University - (B+G+2) College Project
Honda Motor Cycle & Scooters Project – Manufacturing Plant & Offices
New Doha International Airport - Airport Project
Emirates Hotel - (B2+B1+G+60) High raised hotel project
EDUCATIONAL QUALIFICATION
Certification : Project Management from Royal Institute of Chartered Scotland
Qualification : B.E (Electrical & Electronics Engineering)
University : Anna University, Chennai
Year of passing : APRIL 2007
HSC (12TH) : 87.16% from National School (2003 passed out)
SSLC (10th) : 80.6% from National School (2001 passed out)
KNOWLEDGE IN ELECTRICAL & MECHANICAL SYSTEMS:
HT panel & LT panel, ATS & Capacitor bank
Transformers, Generators,Busduct,HT & LT Cables
Lighting,power,Fire alarm(Edwards & Simplex),Lightning arrestor and Earthing
Data, CCTV, Public Address system, Access control system
AHU-DB’s and starter panels for Air Handling Unit
Isolators and starters panels for Fresh air fan and exhaust fans
Knowledge in installation and testing & commissioning of BMS System(Siemens)
• Knowledge in AHU, FCU, Chiller pumps, Condenser Pump, FM-200, Foam, Chiller panels, Sump Pump, Flow Control Station
SPECIAL SYSTEMS IN THE PARTICULAR PROJECT :
1.AWQAF Headquarters (2015 To Present):
Bus duct Risers Inside the Electrical Shaft up to 16th Floor
More than 100 rooms & 65 Mechanical Rooms
Gym, Cinema Hall,Projector room
Raised floor for more than 100 rooms
Building Management System for the entire Building
Electrical & Electromechanical
2.College of Technology Studies( 2013 To Present) :
More Than 200 class rooms, Separate mosque
More Than 60 AHU Mechanical Rooms and 28 IDF Telecommunication rooms
Floor Boxes installation almost in all shops
Cinema Hall and Projector room inside the Cine Complex
3.New Doha International Airport(2010 to 2012) :
Main Passenger Terminal
Hangers for the aircraft Maintenance
Cargo Handling for the baggage’s
Full GI works for light, Power and all Data systems
Fuel Pit, cock Pit and Air handling Pit for the aircraft during maintenance
4.Emirates Park Tower Hotel (2008 to 2010):
Bus duct Raisers and Feeders Inside the Electrical Shaft up to 60th Floor
Transfer Mechanical Floors For Every 25 Floor for the installation of Fresh Air & Smoke Fans
Primary and Secondary chillers because of High Raised Building
More Than 120 Ahu Mechanical Rooms and 3 Main MCR for Telecommunication
Fire Alarm System is Coupled with all the systems
Siemens BMS system Installation and testing and commissioning knowledge for the full project
Project Wise Detailed Scope of Work :
1. PRESENT EXPERIENCE (NOV 2013 TO PRESENT)
Working as an Electrical Project Engineer at Gulf Engineering company( “A” grade MEP company at Kuwait)
Project
Details
Name : College of Technology Studies & AWQAF Headquarters
Details : B+G+02 & B3+B2+B1+G+16
Client : Public Authority Applied Education training & AWQAF
Consultant :Al Dowaliah & KTCB
Main Contractor :Combined Group Contracting & KMC
Project Cost :38 Million KD
SCOPE OF WORK:
Project Budget / Project Management
Involving in project initial process (Shop drawing, composite drawing, coordinated drawing, material related submittals, voltage drop calculation)
Preparing LPO for material based on various quotes obtained from suppliers
Getting approvals from Kuwait fire department(KFD) for fire alarm systems
Getting approvals from Ministry of Electricity & Water(MEW) for electrical systems
Involving in Project closeout process ( As built drawing, Operation and maintenance manuals, Spare parts list, Warranties and Demonstration & training)
2. TECHNICAL SKILLS FOR AWQAF AND COLLEGE OF TECHNOLOGY STUDIES:
Sound Knowledge of LT panels,ATS,Generators,MSB,SMSB,DB,lighting,power,Data,fire alarm, Public address, Clock Systems,CCTV,BMS and Lightning arrestor
Installation and termination of AHU-DB’s, starter panels and Duct heater
Installation of Bus duct raiser and feeder in the electrical shaft
Installation and termination of Smoke Exhaust fan(SEF) Isolators and starters
Installation and termination of Exhaust Air Fan (EAF) Isolators and starters
Coordinating with BMS for the starter panels connection
Coordinating with BMS for DDC panel termination
Coordinating with HVAC for cooling tower MCC panel connection and its VFD commissioning
Coordinating with HVAC for Chiller panels and its flushing work process
Coordinating with Plumbing for sump pump, Foam systems and its electrical connection
3.PREVIOUS EXPERIENCE (APR 2012 TO OCT 2013)
Working as an Electrical Project Engineer at Shimz corporation India pvt limited
Project
Details
Name: Honda Construction plant
Details : Construction of manufacturing plant for Honda scooters
Client : Honda
Project Cost : 400 Crores
WORKING INSTALLATION:
Installation,laying,termination of HT cables as per ITP standard
Installation of HT Generators and HT transformers in Substation
Installation of cable tray & raceway for HT Cable pulling
Installation of MLTP Panels and EMSB panels
Installation of lightning arrestor
Installation of Earth pits for panels,Generators,Transformers & Battery charger
TESTING AND COMMISIONING:
Conducting Lux level testing for lighting.
Conducting HIPOT, Insulation resistance and continuity test for HT cables and LT cables
Conducting Insulation resistance, phase sequence test for Panels
Conducting earth resistance test for earth pits
• Conducting IR, magnetic current, magnetic balance, vector group, winding resistance and ratio test for transformers.
4.PREVIOUS EXPERIENCE: (APRIL 2011 TO APRIL 2012)
PROJECT DETAILS:
Working as a Project Engineer in NEW DOHA INTERNATIONAL AIRPORT at QATAR
Project: New Doha International Airport
Client : QATAR AIRWAYS
Consultant : Overseas Bechtel Inc
Main contractor : ADCC
Total Project Cost : 11 Billion U.S. Dollar
SITE RESPONSIBILITIES:
Make sure all relevant specification, documentation(Method statement, Material data sheet, ITP) and drawings are obtain before start of the work
Inspection of Low voltage switchgear panels, cables according to Inspection test plan activity
Inspection of lighting and power conduits according to ITP activity.
Conducting MEGHER testing of cables
Inspection of earth rods & earth pits according to ITP activity
Witness of testing of earth resistance between earth rods and record the values
Inspection and testing of Wiring devices
Conducting inspection of pre functional and functional test of UPS
TESTING & COMMISIONING (TCP) :
Witness the Primary injection & secondary injection testing of relays in panels
According to testing and commissioning procedure
Inspect the decibels testing (85db to 88db) for public address system and check
The coordination with fire alarm due to emergency condition
Inspect and testing the Automatic transfer switch for generator during power failure condition and check the automatic transfer is take place in less than 5 seconds
Testing the UPS by checking N+1 condition, the two of the 160KVA ups is called N+1 condition, during failure of one UPS the other can withstand the full load for 30min
Inspect the testing of telecommunication and distribution system by checking the length of the CAT cable and fiber optic cable. By OTDS tester if it is CAT cable the length should be less than 90 meters, if it is fiber optic the length should be more than 90 meters
Inspect the testing of fire rated MCKEON door for LVS room and checking that the fire rated door should automatically close during emergency condition and prevent the LVS room from fire
Inspect the testing of intelligent door panel for all kind of non fire rated and fire rated door.Intelligent door panel consist of relays for open and closing the door automatically.
Inspect the Megher testing for all kind of cables ranging from 400v to 600v.
Inspect the testing of GROUND POWER UNIT, where GPU is the 400HZ supply for
Aircraft during aircraft is at rest condition.GPU consists of nose pit, PCA pit, fuel exhaust pit.
Inspect the testing of ACCESS CONTROL SYSTEM for all doors and the access control system is linked with intelligent door panel.
The testing and commissioning of all these electrical activities is done according to approved T & C procedures given by the consultant. The submission of T & C should include the installation of all electrical activities which means inspection request form should attached during T & C.
5.PREVIOUS EXPERIENCE (JAN 2008 TO APR 2011)
• Worked as a Project Engineer (construction and high rise building) in Electrical field in BLUESKY L.L.C, Dubai, U.A.E
Project: Emirates Hotel
Details: 60 Floor Building
Consultant: Arch group
Main Contractor: Brook Field Multiplex
SITE RESPONSIBILITIES:
Installation of DDC Enclosures and pulling of 2 core Belden cables for DDC communication
Installation of I/O Devices inside the AHU mechanical rooms for Siemens system
Installation of AHU Starter panels and Fan & Smoke System Starter panel in the mechanical floors
Installation of Temperature sensors, Pressure sensors and Flow Switch in the chiller pipes after the provision of well made by HVAC team
Commissioning of all BMS system
Installation of Smoke Detectors, heat detectors, Break glass, Horn & Strobe & Fire man Switch
Installation of Fire alarm Wiring and BMS Wiring inside the AHU Starter Panels and Fan Starter Panels
Installation of lighting and power DB
Tapping of power from Bus duct raiser by pulling of cable from the isolator to near by Distribution Boards
Estimation Responsibilities:
Review tender document in detail and develop clear understanding the scope of work and responsibilities.
Perform basic design and Engineering calculations for various Electrical systems like Load schedule calculation, Transformer sizing, Generator sizing, Circuit breaker sizing, Capacitor bank sizing, voltage drop, cable sizing, cable tray, trunking and Earthing & Lightning protection system etc.
Quantity take-off for all Electrical Systems from the consultant /tender drawings.
Floating Enquiry to the Suppliers / Manufacturers as per the makes specified in the tender documents.
Preparation of cost comparison sheet for all suppliers & Sub-contractors offer.
Evaluating of vendors’ technical and commercial proposals, and providing recommendations.
Preparation of BOQ and compiling accurate and efficient estimation for the projects.
Preparation of technical proposal for tender submission.
Familiar with the various standards like IEC, BS EN, Ingress protection (IP ratings)
PERSONAL DETAILS:
Father’s Name : N.Chandrasekaran
Date of Birth : 31.05.1986
Marital Status : Married
Nationality : Indian
Languages Known : English, Tamil, Hindi (speak only)
Permanent Address : Trichy, Tamilnadu, India
Passport No : G 2278580
Issue & Expiry on : 12/04/2007&11/04/2017
Driving license : QATAR, INDIA, KUWAIT
DECLARATION
I do hereby confirm that the information furnished above is true to the best of my knowledge and beliefs.