Ehab El Sayed,CCM
Manager of Project Management Control Systems & Document Management
Page 1 of 4
Personal Information
Nationality : Egyptian
Year of Birth : 1973
Year in Industry : 24 years
E-Mail :
******@*****.***
Contact : 001**********
Profile
Civil Engineer with a diversified background over the past 23 years, Additional experience includes technical,Reporting and project management. Familiar with site supervision, able to coordinate multiple projects and teams simultaneously and consistent record of completing projects on time and within budget. Recognized for expert Analytical and qualitative abilities.
Education:
BSc in Civil Engineering from Alexandria University, Egypt (1996)
Certified Construction manager (CCM)
OSHA 50 Hours Construction Industry Certified # 376053
ACI Certified- Certification ID # 01401024
Professional Memberships:
Member of Saudi Council of Engineers.
Technical Skills:
Planning and Schedules Programs: Primavera P6,Ms Projects, Premaster and Navis work 4D Reporting Programs: BIM,Ms Office, Sketch up8 for 3D,Bluebeam -VBA
Area of Experience:
Manage the project within the contract condition and limited to approved budget and planned schedule
Manage the project within the contract condition and limited to approved budget and planned schedule
Supervise site's tasks and evaluate the result of each phase
Monitor and control the materials & adequate resources available for the work in accordance to planned schedule
Adhere with the project management techniques, methodology and tools .
Control and manage the whole project by dividing the main deliverables to smaller manageable activities by using Work Breakdown Structure.
Execute and track the activities with maintain the performance of other trades to suit customer satisfaction
Communicate with all stakeholders vertically & horizontally to ease the work .
Coordinate with upper management and liner management to obtain approval to accomplish .
Prepare the required sketches to shown the vision of the project by using sketch up 3D and 4D .
Report the project status shown the schedule, budget index factor SPI, CPI) and analyses to rectify the problems in ahead by using "Risk Management "
Follow the company's procedure or create one for organize the project
"Organization Skills "
Create technical specification and method statement for all the stuff apply on the project
Monitoring sub-contractor performance & actual progress against the project schedules maintaining cost & time control of the projects. Ehab El Sayed,CCM
Manager of Project Management Control Systems & Document Management Page 2 of 4
Experience:
Name of Employer From To Brief Description of Job Performed InfoTran Engineers, P.C.
• Project Name: Morris Housing
Developments for NYCHA
Location: NY,USA
Brick repairs, window lintel replacements,
concrete structural repairs, asbestos
abatement and water proofing; and/or
repairs of the existing parapet walls; repairs
to spalled and cracked concrete with
27,461 Million Dollar
Position: Senior Scheduler
2019 Present • Review Project baseline schedule Phase #2 Maintaining submittal log, shop drawings in
conformance to approved plans and specifications.
Performing cost estimation, RFI, RFC, Claims &
Change order processing for efficient contract
management.
Projacs International, KSA
• Project Name: Alesayi Hospitality
Program
Location: Jeddah, KSA
Construction Budget: To build and
Operate 10 Hotels with 1.8 Billion
SR
Position: Senior PCS Manager
2015
2019
• Manage the program Phases Starting from Pre Design including Finalizing the budget and defining the
Contract Strategy, Preparing the Design Procedure
manual
• Claim Avoidance review, Implement cost/scope control measures such as Value Engineering, developing a
realistic,all-inclusive budget that meets the owner’s goals and constructability review for design phase and all the related sub design Phase Concept, Schematic, Design development up to tender Documents.
• Prepare and establish Master schedule for
Procurement and Construction Phase.
• Establish the procedures in line with control forms as required for the construction and post constructions Phase.
Projacs International, KSA
• Project Name: Dar Al Qibla Hotel
with 5B+G+11 floors over 7000m
Location: Madina, KSA
Construction Budget: SR 600M
Position: PCS Manager
2009
2015
• Directing all process and function in coordination with construction managers, supervisors, planners and
work flow.
• Spearheading the process of delays analysis,
assessing claims ensuring accuracy and consistency of claims Settlement.
• Collecting metric data (such as baseline, actual values for costs, schedule, work in progress and work
completed)
Ehab El Sayed,CCM
Manager of Project Management Control Systems & Document Management Page 3 of 4
Name of Employer From To Brief Description of Job Performed Project Name : King Abdelaziz
International Airport 2010
• And preparing reports to take corrective actions in case of variance
ALROSTAMANI PEGEL L.L.C, Dubai,
UAE
Position: Planning Engineer
2007 2009 • Prepare weekly and monthly project status reports, Analyzed problems (4d) and anticipated project need .
• Provide weekly updates and KPI to management.
Analyzed Delays and Prepare EOT
• Monitor and control the projects to complete within time and budget .
• Assist the P.M to make a decision in time through evaluation of the project (time, cost and resource). GIBCA GROUP-Arabian Profile,
Sharjah, UAE
Position: Planning Engineer
2005 2007 • Preparing master plan related to available time, cost and resource .
• Proactively managed projects by preparing and
presenting, witting statement of works and building client relationships .
• Reviewed project reports and schedule status at the completion of each phase, proficient in handling
simultaneous
• projects and meeting deadlines effectively .
• Estimate projects (production, installation, ...) based on historic data .
• Accelerate the progress based on production
experience and related to cost controlled .
• Maintain proper cash flow scheme in parallel to the progress payments.
Self FOR CONSTRUCTION L.L.C, Egypt
Position: Division Manager
2001 2005 • Self for construction one of construction Filed Company, Part of Self group
• Overall division's activity management, Estimation, Control mould design with regard to cost and time
• Ensure proper design Mix, Cost control & Develop new products (Poly stone, Dry Cast
MEAN FOR ENGINEERING, Egypt
Position: Executive Manager
1998 2001 • Assist the setting up for the factory, Select and evaluate the qualified crew
• Monitor and check the requirements for the production
(Raw materials, Resource, )
• Develop and produce modified GRG
• Mean Roman Building-GRC cladding panels 4,500m2
full cladding Sprayed by GGAP,SPRAY TEC CO.USA
French Arabic CO, Egypt
Position: Project Engineer
1996 1998 • Coordinate between factory and site to ensure to get materials and panels on time
• Record daily activity such as manpower, machinery and tools
• Ensure that all previous activities are approved &signed Ehab El Sayed,CCM
Manager of Project Management Control Systems & Document Management Page 4 of 4
Name of Employer From To Brief Description of Job Performed off by consultant before proceeding further
• SHERATON ABU SUMA -HURGADA GRG &GRC