Post Job Free
Sign in

Engineer Civil Engineering

Location:
Dubai, United Arab Emirates
Salary:
20000
Posted:
August 25, 2020

Contact this candidate

Resume:

AHMED SAMIR ABDUL MONEEAM

(+***)- 055*-******

Senior Planning and Project Control

adfj74@r.postjobfree.com - adfj74@r.postjobfree.com

Page1 of 9

To work in a dynamic environment with growth potential where creativity, team spirit, hard work, dedication and sincerity are appreciated, where I can utilize my professional skills.

Career Objective

- Total years of experience is 26 years – 17 years in UAE and 9 years in Egypt

- 10 years of experience in the field of Project Management/& Consultancy as a Senior planning engineer by reviewing & comment of contractor baseline/revised/recovery program, review contractor reports, raise the monthly report/project dashboard/project presentation to client, review & recommendation of contractor EOT to client, replies/response of contractor letters and correspondence regarding to notice of delays/claims/liquid damages, handling weekly minutes of meeting in planning/progress/programs aspects.

- 10 years of experience in the field of Construction Contracting Companies as a planning engineer in residential,& commercial Buildings, public & services facilities, villas and projects horizontal, precast cladding & hollow core as well as specialized hospitals as a planner schedules to how make the baseline program, revised program due to EOT, recovery program by crashing the duration and relationship, preparing weekly/monthly report, follow-up progress at site and make action plan/corrective action plan etc.

- 4 years of experience in the field material & procurement engineer and preparing the E1, 2 Log’s and follow-up & coordinate with varies suppliers in order to avoid any further delays in Scope of works.

- 2 years of experience in the field cost control & QS engineer for civil activities by making a standard analysis for all civil items inclusive of materials, labor, subcontractors & equipment’s and comparing with actual outgoing expenses from site.

Main Key Features

- Work in the spirit of the team work

- Higher coordination and data sharing between all.

- Creativity and the ability to analyze information to serve the interest of the work>

- Organizing and arranging the work environment and ability to save information in good position to get any information at any time.

- Compliance with the laws and the system of the establishment. Proposed Job Description

Planning Manager

Senior Planning & Project Control

Additional Qualifications / Professional Courses

Certified Course of Primavera 15.1 – Oct, 2015, Dubai (CIBM Institute).

Certified Course of Primavera 6.8.1 – Oct, 2014, Dubai (Chicago Institute management).

Course of Project Management Professional - PMP – Mar, 2014, Dubai, (MSIP Institute)

Course of Construction Claims & Delay Analysis. – 2009, Sharjah, U.A.E (Progress line management)

Certified Primavera 6 Course & Project Management – 2008, Sharjah (Progress line management).

Certified Safety In Construction Course From Contractors Association – 2005, Sharjah, U.A.E

Course of Planning, Schedule, Monitoring & Cash flow in Primavera Project Planner P3- 1996, Egypt AHMED SAMIR ABDUL MONEEAM

(+971)- 055*-******

Senior Planning and Project Control

adfj74@r.postjobfree.com - adfj74@r.postjobfree.com

Page2 of 9

Previous Work Experience & Achievements

UAE Experience

1

Date : From 01/09/16 to Present

Company : Gececo Engineering Consulting - P.O.B 21733 Dubai Client : Sheikh Zayed Housing Programme - SZHP

Activity : Consulting Engineers

Location : Head Office – Abu Bakr Al Sedik Road – Dira House, Dubai Position : Senior Planner - مهندس تخطيط وبرامج

Project Profile:

Design & Supervision Projects for:

Residential complex (888 villas), Ras Al Khimah – 1 billion Dirhams

Residential complex (761 villas), Ajman - 1 billion Dirhams

Residential complex (818 villas), El Syouh, Sharjah - 1 billion Dirhams Job Responsibilities:

a. Review and approved the baseline program which submitted by main contractor (WBS, activity codes, activities relation, productivity of manpower, cost loading assignment on activities, calendar, Noc’s & local authorities relations, sequence of work ...etc).

b. Review and approved the recovery, revised program which submitted by main contractor due to delay events or EOT.

c. Preparing monthly report for client and project status report for our top Management including Key milestone of project, pct. % planned vs. actual, main event occurred during of the month, reasons of delays, corrective action has been taken by ENGINEER, breakdown of pct. % by bid items, planned payment vs. actual, Progress site photos. d. Sending & reply on all contracting letter’s regarding notice of delay, low progress, leak of resources ...etc. e. Prepare and review the variation orders which submitted by main contractor due to client modification. f. Review the ongoing monthly payment and all which submitted by main contractor (review the monthly progress) g. Study and review for EOT regarding with reasons of delay, Contractor entitlement, the method of calculating the claim (Impacted as plan, time impact analysis in concurrent delay...). AHMED SAMIR ABDUL MONEEAM

(+971)- 055*-******

Senior Planning and Project Control

adfj74@r.postjobfree.com - adfj74@r.postjobfree.com

Page3 of 9

2

Date : From 23/08/15 to 15/08/2016

Company : Naga Architects, Engineers, Designers, Planners - P.O.B 730733 Dubai Activity : Consultant – Design & Supervision

Location : Head Office – Al SZR Road – API tower, Dhabi Position : Senior Planner and Project Control

Project Profile:

Design & Supervision Projects for:

Residential & commercial Villas.

Building Offices.

Residential Towers.

Master Development

Job Responsibilities:

a. Preparing the full plans for all design projects by phase wise (concept, schematic, detailed design, construction doc

& tender doc) and for discipline wise (architects, structure, mech., elect, interior design, landscape...) by shows the plan dates and resource allocation.

b. Preparing forecasting cash flow for ongoing projects. c. Preparing and calculate the man-hrs. In each phase/discipline within project budget for new projects/proposals.. d. Arrange recourses allocation for all discipline staff (arch., interior design & landscape) for ongoing projects to ensure that all the staff are busy and working constantly. e. Update and follow-up the weekly progress for design dept. in PIM system for ongoing projects and coordinate with all departments due to any delays could happen and submit the weekly status report to top management. f. Preparing the new schedule, manpower histogram and cash flow for design and tendering phase for new projects/proposals tender using P6.

g. Coordinate with Projects Manager for shifting staff, follow-up progress and any problems facing the designer’s team.

h. Study and evaluating the Contractors claims (EOT) in Construction dept. (Delay Analysis). i. Study and evaluating the Contractors baseline / recovery programs in Construction dept. (P6). j. Attending weekly management meeting to discuss the projects status, achievable deliverables, performance of design team, actual cost compering with actual work done for each discipline ...etc. 3

AHMED SAMIR ABDUL MONEEAM

(+971)- 055*-******

Senior Planning and Project Control

adfj74@r.postjobfree.com - adfj74@r.postjobfree.com

Page4 of 9

Date : From 1/6/13 to 22/08/2015

Company : Dorsch Group Consultant Abu Dhabi - P.O.B 26417 Abu Dhabi Client : Abu Dhabi General Services Company - Musanada, Activity : Consultancy – Al Salam Road - Abu Dhabi Position : Senior Planning Engineer –Site Office

From 16/06/2015 to 22/08/2015 – Al Falah, Abu Dhabi Project Profile:

Abu Dhabi Future School - Al Falah Boys School (152,860,000 AED)

Abu Dhabi Future School - Al Falah Girls School (152,860,000 AED) Job Responsibilities:

a. Review of Daily Report for manpower allocation. b. Review & comment on a Weekly Report and submit it to Client as weekly basis. c. Preparing the bi-weekly Snapshot for Client shown the progress, situation of procurement, authorities NOC’s, quality at site and important issues of risk analysis and area of concern. d. Review Contractor dash board and risk register and submit it to Client as monthly basis. e. Preparing letters & correspondences regarding progress delay, Engineering submittals delay, long lead items not delivered to site, review Contractor EOT and what entitlement or not. f. Review Client CEO Presentation.

From 01/06/2013 to 15/06/2015 - Western Region Projects, Abu Dhabi Project Profile:

Design & Built for 20 villas & infrastructure at Al Yabana, Jaraa (52,000,000 AED)

Design & Built for 60 villas & infrastructure at Bida’a Al Mutawaa (161,000,000 AED)

Design & Built for 20 villas & infrastructure at Um Al Ashtan (59,000,000 AED) Job Responsibilities:

a. Review and approved the baseline program which submitted by main contractor (WBS, activity codes, activities relation, productivity of manpower, cost loading assignment on activities, calendar, Noc’s & local authorities relations, sequence of work ...etc.

b. Preparing Weekly report for client and top Management including pct. % planned vs. actual, KPI curves for main activities, delayed activities, manpower & cash flow histogram). c. Preparing Monthly report for client and project status report for our top Management including pct. % planned vs. actual, progressed activities for Design, Engineering & construction phases, KPI index curves for main activities, expecting running activities (look ahead), manpower & cash flow histogram, summary E1 log and what pending submittals should be released by consultant, NCR, RFI) d. Sending & reply on all contracting letter’s regarding notice of delay, low progress, leak of resources ...etc. e. Review weekly update from the viewpoint of the Consultant. f. Study and review the mitigation plan and corrective action measurements should be Contractor taken to overcome on current delay.

g. Review, commented & approved of recovery program of work due to Contractor delay. h. Study and review for EOT regarding with reasons of delay, Contractor entitlement, the method of calculating the claim (Impacted as plan, time impact analysis in concurrent delay...). 4

AHMED SAMIR ABDUL MONEEAM

(+971)- 055*-******

Senior Planning and Project Control

adfj74@r.postjobfree.com - adfj74@r.postjobfree.com

Page5 of 9

Date : From 1/4/10 to 31/12/2012

Company : Core Engineering Consultancy - P.O.B 70352 Abu Dhabi Client : Ministry Public of Works - MPOW

Activity : Projects Management - Airport Road - Abu Dhabi Consultant : Perkins Eastman Int. / Al Bayaty Architects Position : Senior Planning Engineer – Site Office

Project Profile:

H.H. SHEIKH KHALAIFA SPECIALIST HOSPITAL – RAK

Construction phase 600,000,000 AED

Medical Equipment phase 300,000,000 AED

Job Responsibilities:

a. Review and approved the baseline program which submitted by main contractor (WBS, activity codes, activities relation, productivity of manpower, cost loading assignment on activities, resources, etc. b. Review the Weekly/monthly reports which submitted by main contractor (actual progress vs. planned, manpower & resources allocation, critical activities & priority sequence, work performance as BCWP, BCWS, Earned value, equipment & machinery at site, Pending submittals like NCR’s, RFI’s, etc ) c. Review the E1 log status (closed item, pending submittals more than 14 days, submittals due). d. Review the E2 log status for MEP elements and long lead items (not ordered, open LC, purchased items, under delivered at site)

e. Address and Correspondence the contractor for any issues concerning with baseline program, notes of delays, updates, time extension, contractual milestones, ...) f. Prepare and submit weekly/monthly reports to Ministry Public of work (MPOW) and Ministry of health. g. Attend weekly progress meeting at site and rescored the minutes. h. Weekly site visit to monitor the progress & compare with the baseline, site photographic, delayed activities, site comments such as safety & quality.

i. Review and approved contractor EOT (identify delays, effect of delays & delay types) by using Delay Analysis Techniques (impacted as planned program-IAP, as planned vs. as built program-IAPAB, time impact analysis -TIA). j. Prepare the corrective actions & recommendations by project management to overcome the current delay of the project.

k. Prepare the risk analysis that must be taken into consideration by the client into monthly report. 5

AHMED SAMIR ABDUL MONEEAM

(+971)- 055*-******

Senior Planning and Project Control

adfj74@r.postjobfree.com - adfj74@r.postjobfree.com

Page6 of 9

Date : From 10/03/2007 to 03/03/2010

Company : Juma AL Majid Group, Dubai

Activity : Precast Cladding, Hollow Core Slab & GRC Panels Location : Head Office - Al Quoz Industrial Area - Dubai Position : Sr. Planning Eng. & Follow-up

From 01/02/2009 to 03/03/2010 - Concrete Products Plants (CPP), Al Quoz, Dubai, Projects Profile:

Zumurud Tower (G+5P+29) - (Panels) 4,000,000 AED

Dubai Police Boundary Walls. – Khawanig 36,000,000 AED

Loft Podium Towers. – Burj Dubai Area (Panels) 15,000,000 AED

Water tank Reservoirs (beams & Hollow core slab) 10,000,000 AED

Dunes Villages (wall panels, beam & parapets) 5,000,000 AED

Ansar School – (Precast & HCS) 7,000,000 AED

Qatar Tower (Podiue+30th typical floor Roof 18,000,000 AED Job & Responsibilities:

Preparing the baseline for new projects (design, production & erection phases).

Preparing revise & recovery program as per employer request in case delaying occurred in any project.

Daily update for issued, produce and erected panels (precast, hollow core)

Weekly schedule report for running project by updating in p3 software.

Monthly work for all projects as showing actual of production, delivery at site and erection panels vs. planned rate.

Coordinate with site for which panels needed to delivered & erected as per the approved sequence.

Preparing the time extension documents (contract clauses, executive summary, delay effect, correspondences, etc.). From 10/03/2007 to 31/01/2009 - Al Majid Contracting –, Al Rashidiah, Dubai, Projects Profile:

Car Showroom & Workshop – Ras AL-Khaima 75,000,000 AED

(2B+G+M+5) Residential Bldg. – Hamriya 240,000,000 AED

(3B+G+M+5) Residential Bldg. – Karama 45,000,000 AED

(G+3) Residential Bldg. – Hamriya 33,000,000 AED

(G+M+2) Car Repair Workshop – Abu Dhabi 100,000,000 AED

(2B+G+1) Banking Hall – Nasser Square 20,000,000 AED

Refrigerator Factory – Al Qouz Ind. 12,000,000 AED Job & Responsibilities:

Preparing the baseline for different projects (Workshop & showrooms, residential Buildings, banks, schools).

Preparing revise & recovery program as per employer request in case delaying occurred in any project.

Weekly update for running project and prepare the weekly report.

Scheduled for provisional sum and Pc rates items (submission date for Samples, shop drawing, approval date & material arrive at site).

Monthly work in place & cash flow (strategy plan). AHMED SAMIR ABDUL MONEEAM

(+971)- 055*-******

Senior Planning and Project Control

adfj74@r.postjobfree.com - adfj74@r.postjobfree.com

Page7 of 9

Weekly site visit for follow up the progress, project Performance and discussion for delay reasons (resource, manpower required, activities should be start in next week, productivity rate for manpower).

Preparing the time extension documents (contract clauses, executive summary, delay effect, correspondences)

Reply on incoming correspondences (By consultant & owner) and preparation the clarification & explanation. 6

Date : From 19/2/2003 to 08/03/2007

Company : Al Huda Contracting Co. LLC – P.O.B 6152 Dubai Activity : Engineering, Procurement & Construction – EPC Location : Head Office – Al Qarhood, Dubai

Position : Planning Engineer – Site Office

From 02/01/2005 to 08/03/2007

Projects Profile:

Discovery Gardens 2 (30Bldg.) X, Y types (G+ 5) 405,000,000 AED Client: Al-Nakheel – Discovery Gardens2

Job & Responsibilities:

Full submission for work program as per TURNER Requirements (as per contains of work program - clause 14.1).

BI-weekly & monthly reports to TURNER.

Monthly Payment application included material on site documents.

Getting time extension due to obstruction bldgs. & Extra Qty for excavation & Soil improvement & unexpected holidays.

E1 Log (Submittals status).

E2 Log (Procurements material table (ordered Qty, pur. Order date, Delivered Qty, Required on job date.

BI-Weekly update and internal follow up report contains :-

Cum. Delays per Bldgs wise.

Reasons of delays and what req. resources to reduced the delay.

Recovery action Plan.

Established database entry for QC dep. and technical office contains the following:-

Daily Inspection Request.

Concrete Pouring Qty at site (Bldgs & Time wise).

Order Confirmation & agreements for subcontractors.

All planning department reports (T7 Report – Progress status – Activities Ready to start).

Daily manpower and classification (suppliers, subcontractors).

Productivity rates for masons (Concrete-Block-Plaster-Ceramic).

Overtime for labors.

Situation of subcontractors - monthly Qty and location (level/flat/room wise). From 19/02/2003 to 31/12/2004

AHMED SAMIR ABDUL MONEEAM

(+971)- 055*-******

Senior Planning and Project Control

adfj74@r.postjobfree.com - adfj74@r.postjobfree.com

Page8 of 9

Projects Profile:

National Falcon Center – Nad Al Shaba 15,400,000 AED

B+G+ 4Offices Building for Sheikh Zayed Housing. 28,000,000 AED

Private Villa-2,3,4 -Umm Hureir First 26,500,000 AED

G+2 School Building at Al Nahda Second 11,000,000 AED

G+4 Res. / Commercial Bldg at Al Nahda Second 25,200,000 AED

Mosque Jama at AL-Garhoud (Municipality). 10,600,000 AED Job & Responsibilities:

Weekly Follow-up Report to all hand Project – counties :-

Time wise - Schedule Index & Money wise – Cost Index.

Delaying Activity.

Work Program Performance BCWP via Schedule Performance BCWS.

Submittal Register of Material, Subcontract & Shop dwg (Weekly update).

Comparison between Plan & Actual labor in site.

Prepare Time Schedule from New, Cash Follow on Bid Item in BOQ, Manpower & S curve based on time.

Weekly Progress meeting with GENERAL MANAGER to discus Progress For all projects, delay Act., Problems & Obstruction and Requirements to solve these Problems.

Handling and follow-up submittals (samples, shop dwg, subcon.) & order Confirmation. AHMED SAMIR ABDUL MONEEAM

(+971)- 055*-******

Senior Planning and Project Control

adfj74@r.postjobfree.com - adfj74@r.postjobfree.com

Page9 of 9

Educational Qualifications & Professional Studies

B-SC Civil Engineering : Alexandria University – Class May-1994

Grade : Good

Project : Reinforced Concrete (grade very good)

Languages & I.T Skills

Arabic: Mother Tongue

English:– Influent .(Read, written & spoken)

a) Computers software (Primavera 15.1, 6,8.1 & 3.1- Excel 2019

– Word

2019

– Access

2007

– Power Point)

b) Programming of any database by using by Access

2007

c) PIM System (Project information Management)

d) Photo Shop

e) Internet software tools

f)

Personal Details

Date of Birth 05-05-1972

Marital status Married and I have 2 kids

Contact Number UAE: (050-******* (mobile 2)

(06)-5305410 (home)

EGYPT: (002-********* (home)

E-mail (Alternative) adfj74@r.postjobfree.com

Residence Valid UAE residence visa – Dubai

D/L Valid UAE D/L - Dubai issued

Best Regards



Contact this candidate