TECHNICAL QULIFICATION

Diploma (Electrical Engineering) from the board of Technical Education and Industrial Tearing Punjab Chandigarh with Fist Division.

WORKING EXPERIENCE:-

1.Working with M/S GILLENDERS ARBUTHNOT & CO LTD (Punjab) as a Shift Engineerfrom nov 2019 to till date

PLANT DETAILS

Boiler : 34THP AFBC Water Tube 66kg/cm2490-+50(thermax)

Turbine: 6.5MW Bleed cum Extraction cum condensing (Triveni)

2.Worked with M/S TRIVENI ENGINEERING AND INDUSTRIES LTD – O&M as a Shift Engineer at site Gillenders Arbuthnot & co. ltd

PLANT DETAILS TRIVENI (G.A.C.L) (March 2012 to Till Date)

MCR : 34TPH AFBC Boiler

Make : Thermax Water Tube Boiler

Heating Surface : 2258M2

Working Pressure : 66g/cm2

Temperature : 490 50C

3. Worked with HPCL-MITTAL ENERGY LTD under O & M of JS ENGINEERING

IN EMD having 165 MW CCPP during erection commissioning period.

PLANT DETAILS (J S ENGINEERING PVT LTD) (March 2011 to Feb 2012)

GAS Turbine : 2*34.5MW Frame 6B.

HRSG : 2*110 TPH with Supplementary Firing.

STG : 2*35 Impulse Reaction Condensing cum Double Extraction.

BPTG : 1*32 Impulse Reaction Back Pressure Turbine.

Utility Boiler : 4*240 TPH Natural Circulations Bi Drum with Front Firing.

4.Worked with M/S TRIVENI ENGINEERING AND INDUSTRIES LTD – O&M

at site Gillenders Arbuthnot & co. ltd.

PLANT DETAILS TRIVENI (G.A.C.L) (March 2009 to March 2011)

MCR : 34TPH AFBC Boiler

Make : Thermax Water Tube Boiler

Heating Surface : 2258M2

Working Pressure: 66g/cm2

Temperature : 490 50C

5. Worked with ARC India Engineering PVT LTD at Guru Gobind Singh super thermal power plant roper from 2007 to 2009 looking after maintenance.

Boiler: 650TPH dumping grade make BHEL

Turbine: 210MWx6 make BHEL

Operating Temperature & pressure: 550 0C and 150kg/cm2

TRANING EXPERIENCE:-

Two month training at 1260 MW Guru Gobind Singh Super Thermal Power Plant Roper

JOB RESPONSIBLITY:-

I have good Knowledge about turbine operation and auxiliary

I have good Knowledge about boiler operation or maintenance

I have good Knowledge of boiler auxiliary and mounting

I have good Knowledge about AFBC, And Trawling Garaged or etc boiler operation

Good Knowledge about ESP (electrostatic precipitator )

I have good knowledge of Ro plant 50m3

Monitors the operation, makes frequent visual inspections, checks for abnormal conditions and operates the generating plant including all auxiliary equipment in a safe, reliable and efficient manner in accordance with industry standards, environmental restrictions, original equipment manufacturers recommendations and Standard Operating Procedures

Prepare routine daily, weekly and monthly reports prepare

Availability to work in rotating shift. 20. Team player

PASSPORT DITEAL

Passport No- S2068294

Patna 18/7/2018 TO 17/7/2028

PERSONAL DETAL:-

Father name: - Sh Sham Bali

Date of birth: - 06/05/1986

Sex : - Male

Marital status: - Married

I do hereby declare that all the statements made above are true complete and correct to the best of my knowledge and belief

(surinder yadav)



Contact this candidate