SUMARTONO
Komplek Pesona Somerset, Balikpapan Baru
Blok DK-8, Damai Baru, Balikpapan Selatan
Kalimantan Timur – Indonesia
Phone : +62-813********
Email : ***********@*****.***
Personal Profile
Operation and Maintenance Planner, Electrical Maintenance Supervisor, Group Leader Maintenance, Safety Officer, Senior Electrical Technician and Electrical Engineer in Oil and Gas Company experience for more than 20 years, particularly in oil and Gas company Offshore and Onshore Production with Chevron Indonesia and Unocal (Offshore and Onshore) at east Borneo and Riau.
Familiar with Turbine Engine/Compressor/Generator from (Siemens, GE, Saturn, Centaur and Taurus of Caterpillar), from 1 MW until 100MW (Maintenance, Retrofit, Overhaul, Unit dismantle, Unit Reinstalled, alignment, Vibration and Repairing), Engine dual Fuel (diesel and Gas Engine) wartsila 34 DF 4 x 10 MW, Diesel and gas engine of caterpillar (3346, 3408, 3516).
Familiar with Overhaul and Maintenance and various Diesel Engine, Gas engine, LV, MV and HV, shutdown system, transformer, spice cable high voltage, Electric submersible Pump, Crane pedestal and mobile, overhaul electric motor until 300 HP, over haul electric Generator, UPS, HVAC, Fire and gas detector, PABX, Paging alarm, safety device of process control, function test safety device of breaker Generator, centrifugal pump (shipping pump, Jockey Pump, well clean pump), system maintenance reporting and documentation, Well head control Panel.
Safety Management
Familiar with standard operational procedure, Job Safety analysis, Standard Work Permit Oil and Gas, Pressure safety valve, Oil and Gas surface Production facilities, Construction safety, hazardous area, Incident Report, LOTO Implemented (Log Out and Tag Out), member of EMT/ERT, familiar with SIMOP (before drilling on board) and Turn around Job, Familiar with hazardous area, Hazid, What If, Hazop, Hazcom, RCA certified, Rigger certified, crane certified, scaffolding supervisor certified, AK3 Electric Certified, APAR Certified BLS, HUET, Medical Evacuation and Emergency Response, Behaviour base safety certified
Conscientious person who works well under pressure, flexible and organized approach to heavy work load, Good team Player able use own initiative.
Name : Sumartono
Date of Birth : September 14, 1974
Marital Status : Married
Nationality : Indonesia
Religion : Moslem
Gender : Male
Current Location : Indonesia
Education : Bachelor Degree Electrical Engineer
General
Good education, discipline and dedicated, ability in leading a group of people, ability to adapt in situations, trustworthy, believe in quality and team work, communicative, self motivated and fast learner.
Computer Ability
Spreadsheet & Word Processing (MS-Excel, MS-Word, Acrobat Reader)
Programming (PLC 5, 555 alan bradly, PLC M580 Schneider, Control engine Unix C-3, Fire and Gas detector of detronic eagle quantum)
CMMS, JDE, Ariba, E-procurement, Contract, AFE, MOC
Microsoft Project
Education
Bachelor’s degree of Engineering,
Department of Electrical Engineering,
Faculty of Technical Electro
Tridharma University
GPA 3.00 of 4.00
Final Project
Analyze Generator management relay (GMR-489) for protection gas engine and generator
Diploma III in Polytechnic State of Brawijaya University
Department of Electrical Engineering
GPA 2.75 of 4.00
Final Project
Planning and design tools of digital measure wind direction and speed
Organization experience
Member of Student Association
Head of Student Association
Vice of Head Student Association
Day to day activities 2017 – Now
( Electric Maintenance Supervisor at Bontang Site, East Borneo)
Time
Job Activities/Remarks
Nov-Feb 2017
Commissioning and Function Test of Power Plant Wartsila Engine 4 x 10 MW on Bontang site, East Borneo.
Join Inspection for electrical and instrument job with PP and Consultant
Supervise project of electrical and instrument Job
Function test safety device of Fire alarm, Generator protection, transformer protection
Provide attention on outstanding WO
Prepare, analysis, procurement critical part
Tracking and monitoring PM, PDM and CM activities
Maintain WTP and WWTP within good result
Prepare SOP and JSA
Routine Function test safety device
Routine safety walk
Speaker of safety moment before perform job.
Feb-Now 2019
Supervise and Implement all maintenance activities in the Power Plant to ensure safe, reliable and efficient operations.
Checks and monitors operating parameters and ensure that they are within limits. Initiates corrective and preventive actions on abnormalities
Implementation of Quality, Environment, Health & Safety (QEHS) and Housekeeping programs & policies.
Close coordination with other Supervisor including Customer on daily operation.
Coordinates all maintenance activities with Operation and Maintenance Manager.
completed Work Order requests and records (maximo)
Prepares completely and accurate maintenance records and reports.
Trouble shooting for engine problem
Day to day activities 2013 – 2017
(Operation and Maintenance Planner at Duri Field, Riau)
Time
Job Activities/Remarks
Daily
Manage and integrates all planning activity, work schedule and cost ($ 18 M)
With Business Planning team prepare budget for operation and maintenance team.
Input data daily activities of operation and maintenance
Analysis and develop daily, weekly, monthly and annually work
Monitor routine daily maintenance and operation activities using planning tools
Provide attention on outstanding WO
Prepare, analysis, procurement critical part
Tracking and monitoring PM, PDM and CM activities
Implement Reliability Centre Maintenance (RCM)
May 1-8, 2016
CI (Compressor Inspection) and HRSG Inspection of CT 3 in Duri Field, Riau, Chevron Pacifik Indonesia.
Daily
Maintain Reliability and availability of Gas Turbine (Engine and Generator), auxiliary and BOP
Every Project
Handling Project Outage, prepare AFE for budget and closing
2014
Prepare, review and handling document contract of recalibration and certification all permit, equipment and safety device ($ 1,8 M)
Monthly
Planning and scheduling daily, monthly, annually until 5 year operation and maintenance activities
Every 3 Month
Tracking and monitoring PM, PDM and CM activities
Lead of rout cause analysis for equipment with high cost
Ensure update equipment data base
Monthly
Monthly report for operation and maintenance activities and achievement target
Monthly report of SERIP
Every outage
Review and check outage list for unit outage and curtailment
2015
Implement Reliability Centre Maintenance (RCM)
Every 3 Month
Oversee Work order management (Issue, Track and closing) implementation.
April 4-may1, 2016
HGPI (Hot Gas Patch Inspection) for Turbine Engine and Generator CT-1 100 MW in Duri Field, Riau, Chevron Pacifik Indonesia. ($ 3,5 M)
Every Project
Turn Around Planning and execute Manages and coordinates major maintenance project such turn around, project using project management methodology from initiation, planning, execution, control, and project close out stages. It includes develop a realistic budgets with in an efficient use of resources, tools, and material.
Jan 11-Feb 6, 2016
Replace Rotor Generator 100 M Watt of CT-2 in Duri Field, Riau, Chevron Pacifik Indonesia. ($ 4,0 M)
Day to day activities 2008 – 2013
(Group Leader of Maintenance at Attaka & NIB Field offshore, East Borneo)
Time
Job Activities/Remarks
Daily
Responsible Reliability and availability equipment of Turbine Compressor, Turbine Generator, Gas Engine, Diesel Engine, centrifugal pump, screw pump, Instrument air compressor, transformer, Pedestal Crane, flow meter, function test safety device)
Input data daily activities of operation and maintenance
Analysis and develop daily, weekly, monthly and annually work
Monitor routine daily maintenance and operation activities using planning tools
Provide attention on outstanding WO
Prepare, analysis, procurement critical part
Tracking and monitoring PM, PDM and CM activities
May 1-8, 2016
Identify bad actor and worst actor such rotating equipment, shipping pump, electrical and instrument equipment in Attaka Field, Offshore, East Borneo, Chevron Indonesia.
2008
Laydown sub sea cable 4160 Volt and perform splice cable from Attaka quarter with Lima platform, foxrot Platform, Bravo Platform and Charli Platform
2014
Engineering, Install, commissioning and Start up Gas Engine Caterpillar 3408 at STA Platform, offshore.
2009
Commissioning and start up hydrocylone and sump caisson Tank for waste at STA Platform, Offshore
2010
Turn Around for install Gas lift compressor and replace passing valve at STA Platform, Offshore
2011
Install, commissioning and start up Fire and Gas detector eagle quantum at, Bravo, Hotel and STA Platform, Offshore
2011
Engineering, Install, commissioning and Start up 4 x 1M Watt Gas Engine Caterpillar 3516 at Attaka Platform, offshore.
2012
Start for Implement Reliability Centre Maintenance (RCM)
2013
Turn Around for replace passing valve, clean up hydrocyclone and wemco, retrofit Solar Turbine control centaur 4000, attaka field offshore, east Borneo.
2013
Engineering, Install, commissioning and Start up 1 x 255 Watt Gas Engine Caterpillar 3408 at Kerindingan Platform, offshore.
Every Project
Turn Around Planning and execute Manages and coordinates major maintenance project such turn around, project using project management methodology from initiation, planning, execution, control, and project close out stages. It includes develop a realistic budgets with in an efficient use of resources, tools, and material.
Day to day activities 2006 – 2008
(Safety Officer at NIB Field offshore, East Borneo)
Time
Job Activities/Remarks
Daily
Responsible Safety equipment good condition and routine function test safety relay protection of Generator, Turbine compressor, Motor control Panel, Variable speed drive, Well head control panel at NIB Field, Offshore, east Borneo, check work permit, review JSA and SOP, discussing daily job for safety moment, safety Induction every guess on board, Safety training for hazardous area, Make sure Implement LOTO, monitoring for recertificate PSV, Rigger, Crane, scaffolding, FSWP, sea survival and HUET.
Monthly
Monthly inspection and function test Fire fighting equipment and APAR.
2008
Member of Emergency Respond team (ERT) at Attaka field, offshore east borneo
Before RIG Arrival
Perform SIMOP before Rig Arrival and construction job at Serang Platform, offshore, east Borneo.
6 Monthly
Function test safety device of Well, fire and Gas detector, PSHH, PSLL for all Vessel and actual shutdown Platform, Offshore, east Borneo.
To be Fire man for welding cutting job
Weekly
Safety Walk with supervisor and superintendent for all area
Day to day activities 1999 – 2006
(Senior Electrician Staff at Attaka Field offshore, East Borneo)
Time
Job Activities/Remarks
Daily
Handling Upgrade Turbine Generator and compressor from control relay to PLC Turbotronic, Maintain (PM and PDM) and Troubleshooting Turbine Compressor, Turbine Generator LV and MV, Gas Engine, diesel engine, Shut down system, transformer, splice cable high voltage, Crane pedestal, overhaul electrical motor and generator, UPS, Fire and Gas detector, Motor Control (VSD, DOL, Star Delta), Centrifugal Pump, Reciprocating Pump, PABX, Paging Alarm, Pedestal and mobile Crane, safety device of process control PLC, DCS and well head control Panel, Electrical submersible pump and function test safety devices well head control panel (well head and shut down system), Repaired HVAC, Frezer.
1999-2001
Project Upgrade Control Turbine Compressor (C-1A, 1B and 1C) centaur 40 Caterpillar from relay control to PLC 5500 Allan Bradly at Tanjung santan Onshore, East Borneo.
2001
Install and commissioning Electrical Submersible pump and VSD control (Centrilift) for deep well at Charli and Hotel Platform, Offshore.
Monthly
Monthly routine PM of UPS, PABX, Transformer, Crane pedestal, Electric motor, Battery shut down system, Fire and gas detector, paging alarm, Gas engine, Diesel engine, process control, WHCP,
Monthly
Monthly Routine perform PDM of Rotating Equipment
6 Monthly
Function test safety device of Well, fire and Gas detector, PSHH, PSLL for all Vessel and actual shutdown Platform, Offshore, east Borneo.
Day to day activities 1997 – 1999
(Electrical Engineer at Total Indonesie Field offshore, East Borneo)
Time
Job Activities/Remarks
1997
Project for Barge KGM-2, Engineering, Install, commissioning and start up of well test process on Barge, with equipment Diesel engine, Electric motor, switch gear, process control, shutdown system, safety device at total indonesi offshore area, UPS, Fire and Gas detector, Motor Control (VSD, DOL, Star Delta), Centrifugal Pump, Reciprocating Pump, PABX, Paging Alarm,
1999
Project for Barge M-150, Engineering, Install, commissioning and start up of well test process on Barge, with equipment Diesel engine, Electric motor, switch gear, process control, shutdown system, safety device at total indonesi offshore area, UPS, Fire and Gas detector, Motor Control (VSD, DOL, Star Delta), Centrifugal Pump, Reciprocating Pump, PABX, Paging Alarm,
1999
Project for engineering, Process shutdown system. Control system at Tuban.
Awards
Teladan Award, Chevron Indonesia Company, 2008
Certificate of appreciation for success Turn Around without accident and on schedule, Chevron Indonesia Company.
Terima Kasih award, Chevron Indonesia Company, 2009
Certificate of appreciation for success Install and commissioning Shipping Pump with VSD Control., Chevron Indonesia Company.
Terima Kasih award, Chevron Indonesia Company, 2010
Certificate of appreciation for success Install and commissioning Electrical Submersible Pump, Chevron Indonesia Company.
Training Record
No
Course Title
Date
Status
1
HAKIT for supervise Maintenance of Power Plant
16 Dec 2019
Completed
1
OHS Electrical Expert
17 Sep 2018
Completed
2
Control of UNIC C-3
6 Mar 2018
Completed
3
Turbine Generator and Steam 100 MW
1 Mar 2016
Completed
4
Managment Spare Part for Power Generation Outage 3 x 100 MW
8 Feb 2016
Completed
5
Limbah B3
26 Jan 2015
Completed
6
SERIP
6 Jan 2015
Completed
7
Reliability University - 202 Root cause Analysis
20 May 2014
Completed
8
OE IMPACT – Management of change
17 Apr 2014
Completed
9
Lean Sigma Green Belt Week 2
27 Mar 2014
Completed
10
Lean Sigma Green Belt Week 1
24 Mar 2014
Completed
11
Certification Electrical and Instrument Qualified – Migas Cepu
20 Oct 2013
Completed
12
Scaffolding Inspector & Supervisor
11 Nov 2012
Completed
13
Basic Scaffolding
08 Nov 2012
Completed
14
Basic Sea Survival (BSS)
31 Oct 2012
Completed
15
PLC Advance Process Control
17 Sep 2012
Completed
16
Fire Fighting
18 Jan 2012
Completed
17
FSWP (Fundamental safe work Practice)
06 Dec 2011
Completed
18
Management of Change (MOC)
02 Aug 2011
Completed
19
Solar Gas Turbine Advance Level (Caterpillar)
01 Jun 2011
Completed
20
Basic Fire Fighting
07 Jun 2010
Completed
21
Reliability University 207U
13 May 2010
Completed
22
Basic Sea Survival (BSS)
17 Dec 2009
Completed
23
Medium Voltage Motors
21 Jul 2009
Completed
24
Caterpillar Power Generator - Trakindo
22 Jun 2009
Completed
25
Reliability Overview Course
20 Mar 2009
Completed
26
Reliability Ctd. Mtce Awarenes
19 Mar 2009
Completed
27
RIGGING IMPROVEMENT PROGRAM
22 Jan 2009
Completed
28
PLC-5 - Rockwell
24 Nov 2008
Completed
29
VARIABLE SPEED DRIVES - Schlumberger
28 Jul 2008
Completed
30
BBS OBSERVATION & SOFTWARE
12 Mar 2008
Completed
31
INSTALLATION EMERGENCY MG TEAM
11 Sep 2007
Completed
32
FUNDAMENTAL SAFE WORK PRACTICE
04 Apr 2007
Completed
33
HAZCOM (Hazard Communication)
04 Apr 2007
Completed
34
LEAN SIGMA TRAINING
04 Apr 2007
Completed
35
SEA SURVIVAL
01 Jan 2007
Completed
36
JDE TRAINING (CMMS)
12 Dec 2006
Completed
37
FUNCTION TEST SAFETY DEVICE
08 Aug 2006
Completed
38
FIRE EXTINGUISHER INSPECTION
07 Jul 2006
Completed
39
FIRE FIGHTING REFRESHING COURSE
07 Jul 2006
Completed
40
KLOs INSTALLATION EMT (EMERGEN
05 May 2006
Completed
41
LASER SHAFT ALIGNMENT
03 Mar 2006
Completed
42
ON BOARDING AND CULTURAL ORIEN
11 Nov 2005
Completed
43
CRANE OPERATOR CERTIFICATION - MIGAS
09 Sep 2005
Completed
44
Basic Life Support
07 Jul 2005
Completed
45
STA GASLIFT PROJECT Wakesha Engine
03 Mar 2005
Completed
46
ELECTRICAL MAINTENANCE AND LOW & MEDIUM VOLTAGE Certification (IATKI)
08 Aug 2004
Completed
47
Electrical submersible Pump
05 May 2004
Completed
48
DET TRONICS GAS DETECTION SYSTEM
01 Jan 2004
Completed
49
FIELD MAINTENANCE & TROUBLE SHOOTING
01 Jan 2004
Completed
50
WORK PERMIT LOTO TTT AND USER
01 Jan 2004
Completed
51
CONTROL SYSTEM LOGIC TURBOTRONIC
12 Dec 2003
Completed
52
MOC REFRESHER TRAINING
10 Oct 2003
Completed
53
OPERATION AND MAINTENANCE OF POWER
10 Oct 2003
Completed
54
HAZARD COMMUNICATION, PPE
09 Sep 2003
Completed
55
MICROSOFT OFFICE XP TRAINING
09 Sep 2003
Completed
56
VSD TRAINING
06 Jun 2003
Completed
57
SEA SURVIVAL
03 Mar 2003
Completed
58
CATTERPILLAR GENERATOR G-3516 - TRAKINDO
10 Oct 2002
Completed
59
CONVERSATION ENGLISH COURSE
06 Jun 2002
Completed
60
WOODWARD 723 AND DLSC (GEN-SET)
02 Feb 2002
Completed
61
INTERMEDIATE ELECTRIC - LEMIGAS
07 Jul 2001
Completed
62
MICRO MOTION ANOC SERVICE / CO
06 Jun 2001
Completed
63
BASIC FIRE FIGHTING
04 Apr 2001
Completed
64
Fundamental of Hazards Control
04 Apr 2001
Completed
65
RIGGING TRAINING
02 Feb 2001
Completed
66
SOLAR TURBOTRONIC Advance
11 Nov 2000
Completed
67
BASIC ELECTRIC - LEMIGAS
06 Jun 2000
Completed
68
HELICOPTER UNDERWATER ESCAPE
04 Apr 2000
Completed
69
US FILTER HYDROCYCLONE & WEMCO
11 Nov 1999
Completed
References :
1.Bambang Dian
Team Manager of Operation and Maintenance Chevron Indonesia Company, offshore, Kalimantan.
2.Jafar Ma’arif
Team Manager of operation and maintenance 3 x 100 MW, Chevron Geothermal Indonesia, Duri, Riau
3.Aman Irianto
Team Leader Maintenance, Chevron Indonesia Company, offshore, Kalimantan.
4.Helmy Baharuddin
Plant Manager PLTMG 40 MW, Wartsila, Bontang, Kalimantan.