Post Job Free
Sign in

Electrical Engineer Power Plant

Location:
Balikpapan, Kalimantan Timur, Indonesia
Posted:
August 23, 2020

Contact this candidate

Resume:

SUMARTONO

Komplek Pesona Somerset, Balikpapan Baru

Blok DK-8, Damai Baru, Balikpapan Selatan

Kalimantan Timur – Indonesia

Phone : +62-813********

Email : ***********@*****.***

Personal Profile

Operation and Maintenance Planner, Electrical Maintenance Supervisor, Group Leader Maintenance, Safety Officer, Senior Electrical Technician and Electrical Engineer in Oil and Gas Company experience for more than 20 years, particularly in oil and Gas company Offshore and Onshore Production with Chevron Indonesia and Unocal (Offshore and Onshore) at east Borneo and Riau.

Familiar with Turbine Engine/Compressor/Generator from (Siemens, GE, Saturn, Centaur and Taurus of Caterpillar), from 1 MW until 100MW (Maintenance, Retrofit, Overhaul, Unit dismantle, Unit Reinstalled, alignment, Vibration and Repairing), Engine dual Fuel (diesel and Gas Engine) wartsila 34 DF 4 x 10 MW, Diesel and gas engine of caterpillar (3346, 3408, 3516).

Familiar with Overhaul and Maintenance and various Diesel Engine, Gas engine, LV, MV and HV, shutdown system, transformer, spice cable high voltage, Electric submersible Pump, Crane pedestal and mobile, overhaul electric motor until 300 HP, over haul electric Generator, UPS, HVAC, Fire and gas detector, PABX, Paging alarm, safety device of process control, function test safety device of breaker Generator, centrifugal pump (shipping pump, Jockey Pump, well clean pump), system maintenance reporting and documentation, Well head control Panel.

Safety Management

Familiar with standard operational procedure, Job Safety analysis, Standard Work Permit Oil and Gas, Pressure safety valve, Oil and Gas surface Production facilities, Construction safety, hazardous area, Incident Report, LOTO Implemented (Log Out and Tag Out), member of EMT/ERT, familiar with SIMOP (before drilling on board) and Turn around Job, Familiar with hazardous area, Hazid, What If, Hazop, Hazcom, RCA certified, Rigger certified, crane certified, scaffolding supervisor certified, AK3 Electric Certified, APAR Certified BLS, HUET, Medical Evacuation and Emergency Response, Behaviour base safety certified

Conscientious person who works well under pressure, flexible and organized approach to heavy work load, Good team Player able use own initiative.

Name : Sumartono

Date of Birth : September 14, 1974

Marital Status : Married

Nationality : Indonesia

Religion : Moslem

Gender : Male

Current Location : Indonesia

Education : Bachelor Degree Electrical Engineer

General

Good education, discipline and dedicated, ability in leading a group of people, ability to adapt in situations, trustworthy, believe in quality and team work, communicative, self motivated and fast learner.

Computer Ability

Spreadsheet & Word Processing (MS-Excel, MS-Word, Acrobat Reader)

Programming (PLC 5, 555 alan bradly, PLC M580 Schneider, Control engine Unix C-3, Fire and Gas detector of detronic eagle quantum)

CMMS, JDE, Ariba, E-procurement, Contract, AFE, MOC

Microsoft Project

Education

Bachelor’s degree of Engineering,

Department of Electrical Engineering,

Faculty of Technical Electro

Tridharma University

GPA 3.00 of 4.00

Final Project

Analyze Generator management relay (GMR-489) for protection gas engine and generator

Diploma III in Polytechnic State of Brawijaya University

Department of Electrical Engineering

GPA 2.75 of 4.00

Final Project

Planning and design tools of digital measure wind direction and speed

Organization experience

Member of Student Association

Head of Student Association

Vice of Head Student Association

Day to day activities 2017 – Now

( Electric Maintenance Supervisor at Bontang Site, East Borneo)

Time

Job Activities/Remarks

Nov-Feb 2017

Commissioning and Function Test of Power Plant Wartsila Engine 4 x 10 MW on Bontang site, East Borneo.

Join Inspection for electrical and instrument job with PP and Consultant

Supervise project of electrical and instrument Job

Function test safety device of Fire alarm, Generator protection, transformer protection

Provide attention on outstanding WO

Prepare, analysis, procurement critical part

Tracking and monitoring PM, PDM and CM activities

Maintain WTP and WWTP within good result

Prepare SOP and JSA

Routine Function test safety device

Routine safety walk

Speaker of safety moment before perform job.

Feb-Now 2019

Supervise and Implement all maintenance activities in the Power Plant to ensure safe, reliable and efficient operations.

Checks and monitors operating parameters and ensure that they are within limits. Initiates corrective and preventive actions on abnormalities

Implementation of Quality, Environment, Health & Safety (QEHS) and Housekeeping programs & policies.

Close coordination with other Supervisor including Customer on daily operation.

Coordinates all maintenance activities with Operation and Maintenance Manager.

completed Work Order requests and records (maximo)

Prepares completely and accurate maintenance records and reports.

Trouble shooting for engine problem

Day to day activities 2013 – 2017

(Operation and Maintenance Planner at Duri Field, Riau)

Time

Job Activities/Remarks

Daily

Manage and integrates all planning activity, work schedule and cost ($ 18 M)

With Business Planning team prepare budget for operation and maintenance team.

Input data daily activities of operation and maintenance

Analysis and develop daily, weekly, monthly and annually work

Monitor routine daily maintenance and operation activities using planning tools

Provide attention on outstanding WO

Prepare, analysis, procurement critical part

Tracking and monitoring PM, PDM and CM activities

Implement Reliability Centre Maintenance (RCM)

May 1-8, 2016

CI (Compressor Inspection) and HRSG Inspection of CT 3 in Duri Field, Riau, Chevron Pacifik Indonesia.

Daily

Maintain Reliability and availability of Gas Turbine (Engine and Generator), auxiliary and BOP

Every Project

Handling Project Outage, prepare AFE for budget and closing

2014

Prepare, review and handling document contract of recalibration and certification all permit, equipment and safety device ($ 1,8 M)

Monthly

Planning and scheduling daily, monthly, annually until 5 year operation and maintenance activities

Every 3 Month

Tracking and monitoring PM, PDM and CM activities

Lead of rout cause analysis for equipment with high cost

Ensure update equipment data base

Monthly

Monthly report for operation and maintenance activities and achievement target

Monthly report of SERIP

Every outage

Review and check outage list for unit outage and curtailment

2015

Implement Reliability Centre Maintenance (RCM)

Every 3 Month

Oversee Work order management (Issue, Track and closing) implementation.

April 4-may1, 2016

HGPI (Hot Gas Patch Inspection) for Turbine Engine and Generator CT-1 100 MW in Duri Field, Riau, Chevron Pacifik Indonesia. ($ 3,5 M)

Every Project

Turn Around Planning and execute Manages and coordinates major maintenance project such turn around, project using project management methodology from initiation, planning, execution, control, and project close out stages. It includes develop a realistic budgets with in an efficient use of resources, tools, and material.

Jan 11-Feb 6, 2016

Replace Rotor Generator 100 M Watt of CT-2 in Duri Field, Riau, Chevron Pacifik Indonesia. ($ 4,0 M)

Day to day activities 2008 – 2013

(Group Leader of Maintenance at Attaka & NIB Field offshore, East Borneo)

Time

Job Activities/Remarks

Daily

Responsible Reliability and availability equipment of Turbine Compressor, Turbine Generator, Gas Engine, Diesel Engine, centrifugal pump, screw pump, Instrument air compressor, transformer, Pedestal Crane, flow meter, function test safety device)

Input data daily activities of operation and maintenance

Analysis and develop daily, weekly, monthly and annually work

Monitor routine daily maintenance and operation activities using planning tools

Provide attention on outstanding WO

Prepare, analysis, procurement critical part

Tracking and monitoring PM, PDM and CM activities

May 1-8, 2016

Identify bad actor and worst actor such rotating equipment, shipping pump, electrical and instrument equipment in Attaka Field, Offshore, East Borneo, Chevron Indonesia.

2008

Laydown sub sea cable 4160 Volt and perform splice cable from Attaka quarter with Lima platform, foxrot Platform, Bravo Platform and Charli Platform

2014

Engineering, Install, commissioning and Start up Gas Engine Caterpillar 3408 at STA Platform, offshore.

2009

Commissioning and start up hydrocylone and sump caisson Tank for waste at STA Platform, Offshore

2010

Turn Around for install Gas lift compressor and replace passing valve at STA Platform, Offshore

2011

Install, commissioning and start up Fire and Gas detector eagle quantum at, Bravo, Hotel and STA Platform, Offshore

2011

Engineering, Install, commissioning and Start up 4 x 1M Watt Gas Engine Caterpillar 3516 at Attaka Platform, offshore.

2012

Start for Implement Reliability Centre Maintenance (RCM)

2013

Turn Around for replace passing valve, clean up hydrocyclone and wemco, retrofit Solar Turbine control centaur 4000, attaka field offshore, east Borneo.

2013

Engineering, Install, commissioning and Start up 1 x 255 Watt Gas Engine Caterpillar 3408 at Kerindingan Platform, offshore.

Every Project

Turn Around Planning and execute Manages and coordinates major maintenance project such turn around, project using project management methodology from initiation, planning, execution, control, and project close out stages. It includes develop a realistic budgets with in an efficient use of resources, tools, and material.

Day to day activities 2006 – 2008

(Safety Officer at NIB Field offshore, East Borneo)

Time

Job Activities/Remarks

Daily

Responsible Safety equipment good condition and routine function test safety relay protection of Generator, Turbine compressor, Motor control Panel, Variable speed drive, Well head control panel at NIB Field, Offshore, east Borneo, check work permit, review JSA and SOP, discussing daily job for safety moment, safety Induction every guess on board, Safety training for hazardous area, Make sure Implement LOTO, monitoring for recertificate PSV, Rigger, Crane, scaffolding, FSWP, sea survival and HUET.

Monthly

Monthly inspection and function test Fire fighting equipment and APAR.

2008

Member of Emergency Respond team (ERT) at Attaka field, offshore east borneo

Before RIG Arrival

Perform SIMOP before Rig Arrival and construction job at Serang Platform, offshore, east Borneo.

6 Monthly

Function test safety device of Well, fire and Gas detector, PSHH, PSLL for all Vessel and actual shutdown Platform, Offshore, east Borneo.

To be Fire man for welding cutting job

Weekly

Safety Walk with supervisor and superintendent for all area

Day to day activities 1999 – 2006

(Senior Electrician Staff at Attaka Field offshore, East Borneo)

Time

Job Activities/Remarks

Daily

Handling Upgrade Turbine Generator and compressor from control relay to PLC Turbotronic, Maintain (PM and PDM) and Troubleshooting Turbine Compressor, Turbine Generator LV and MV, Gas Engine, diesel engine, Shut down system, transformer, splice cable high voltage, Crane pedestal, overhaul electrical motor and generator, UPS, Fire and Gas detector, Motor Control (VSD, DOL, Star Delta), Centrifugal Pump, Reciprocating Pump, PABX, Paging Alarm, Pedestal and mobile Crane, safety device of process control PLC, DCS and well head control Panel, Electrical submersible pump and function test safety devices well head control panel (well head and shut down system), Repaired HVAC, Frezer.

1999-2001

Project Upgrade Control Turbine Compressor (C-1A, 1B and 1C) centaur 40 Caterpillar from relay control to PLC 5500 Allan Bradly at Tanjung santan Onshore, East Borneo.

2001

Install and commissioning Electrical Submersible pump and VSD control (Centrilift) for deep well at Charli and Hotel Platform, Offshore.

Monthly

Monthly routine PM of UPS, PABX, Transformer, Crane pedestal, Electric motor, Battery shut down system, Fire and gas detector, paging alarm, Gas engine, Diesel engine, process control, WHCP,

Monthly

Monthly Routine perform PDM of Rotating Equipment

6 Monthly

Function test safety device of Well, fire and Gas detector, PSHH, PSLL for all Vessel and actual shutdown Platform, Offshore, east Borneo.

Day to day activities 1997 – 1999

(Electrical Engineer at Total Indonesie Field offshore, East Borneo)

Time

Job Activities/Remarks

1997

Project for Barge KGM-2, Engineering, Install, commissioning and start up of well test process on Barge, with equipment Diesel engine, Electric motor, switch gear, process control, shutdown system, safety device at total indonesi offshore area, UPS, Fire and Gas detector, Motor Control (VSD, DOL, Star Delta), Centrifugal Pump, Reciprocating Pump, PABX, Paging Alarm,

1999

Project for Barge M-150, Engineering, Install, commissioning and start up of well test process on Barge, with equipment Diesel engine, Electric motor, switch gear, process control, shutdown system, safety device at total indonesi offshore area, UPS, Fire and Gas detector, Motor Control (VSD, DOL, Star Delta), Centrifugal Pump, Reciprocating Pump, PABX, Paging Alarm,

1999

Project for engineering, Process shutdown system. Control system at Tuban.

Awards

Teladan Award, Chevron Indonesia Company, 2008

Certificate of appreciation for success Turn Around without accident and on schedule, Chevron Indonesia Company.

Terima Kasih award, Chevron Indonesia Company, 2009

Certificate of appreciation for success Install and commissioning Shipping Pump with VSD Control., Chevron Indonesia Company.

Terima Kasih award, Chevron Indonesia Company, 2010

Certificate of appreciation for success Install and commissioning Electrical Submersible Pump, Chevron Indonesia Company.

Training Record

No

Course Title

Date

Status

1

HAKIT for supervise Maintenance of Power Plant

16 Dec 2019

Completed

1

OHS Electrical Expert

17 Sep 2018

Completed

2

Control of UNIC C-3

6 Mar 2018

Completed

3

Turbine Generator and Steam 100 MW

1 Mar 2016

Completed

4

Managment Spare Part for Power Generation Outage 3 x 100 MW

8 Feb 2016

Completed

5

Limbah B3

26 Jan 2015

Completed

6

SERIP

6 Jan 2015

Completed

7

Reliability University - 202 Root cause Analysis

20 May 2014

Completed

8

OE IMPACT – Management of change

17 Apr 2014

Completed

9

Lean Sigma Green Belt Week 2

27 Mar 2014

Completed

10

Lean Sigma Green Belt Week 1

24 Mar 2014

Completed

11

Certification Electrical and Instrument Qualified – Migas Cepu

20 Oct 2013

Completed

12

Scaffolding Inspector & Supervisor

11 Nov 2012

Completed

13

Basic Scaffolding

08 Nov 2012

Completed

14

Basic Sea Survival (BSS)

31 Oct 2012

Completed

15

PLC Advance Process Control

17 Sep 2012

Completed

16

Fire Fighting

18 Jan 2012

Completed

17

FSWP (Fundamental safe work Practice)

06 Dec 2011

Completed

18

Management of Change (MOC)

02 Aug 2011

Completed

19

Solar Gas Turbine Advance Level (Caterpillar)

01 Jun 2011

Completed

20

Basic Fire Fighting

07 Jun 2010

Completed

21

Reliability University 207U

13 May 2010

Completed

22

Basic Sea Survival (BSS)

17 Dec 2009

Completed

23

Medium Voltage Motors

21 Jul 2009

Completed

24

Caterpillar Power Generator - Trakindo

22 Jun 2009

Completed

25

Reliability Overview Course

20 Mar 2009

Completed

26

Reliability Ctd. Mtce Awarenes

19 Mar 2009

Completed

27

RIGGING IMPROVEMENT PROGRAM

22 Jan 2009

Completed

28

PLC-5 - Rockwell

24 Nov 2008

Completed

29

VARIABLE SPEED DRIVES - Schlumberger

28 Jul 2008

Completed

30

BBS OBSERVATION & SOFTWARE

12 Mar 2008

Completed

31

INSTALLATION EMERGENCY MG TEAM

11 Sep 2007

Completed

32

FUNDAMENTAL SAFE WORK PRACTICE

04 Apr 2007

Completed

33

HAZCOM (Hazard Communication)

04 Apr 2007

Completed

34

LEAN SIGMA TRAINING

04 Apr 2007

Completed

35

SEA SURVIVAL

01 Jan 2007

Completed

36

JDE TRAINING (CMMS)

12 Dec 2006

Completed

37

FUNCTION TEST SAFETY DEVICE

08 Aug 2006

Completed

38

FIRE EXTINGUISHER INSPECTION

07 Jul 2006

Completed

39

FIRE FIGHTING REFRESHING COURSE

07 Jul 2006

Completed

40

KLOs INSTALLATION EMT (EMERGEN

05 May 2006

Completed

41

LASER SHAFT ALIGNMENT

03 Mar 2006

Completed

42

ON BOARDING AND CULTURAL ORIEN

11 Nov 2005

Completed

43

CRANE OPERATOR CERTIFICATION - MIGAS

09 Sep 2005

Completed

44

Basic Life Support

07 Jul 2005

Completed

45

STA GASLIFT PROJECT Wakesha Engine

03 Mar 2005

Completed

46

ELECTRICAL MAINTENANCE AND LOW & MEDIUM VOLTAGE Certification (IATKI)

08 Aug 2004

Completed

47

Electrical submersible Pump

05 May 2004

Completed

48

DET TRONICS GAS DETECTION SYSTEM

01 Jan 2004

Completed

49

FIELD MAINTENANCE & TROUBLE SHOOTING

01 Jan 2004

Completed

50

WORK PERMIT LOTO TTT AND USER

01 Jan 2004

Completed

51

CONTROL SYSTEM LOGIC TURBOTRONIC

12 Dec 2003

Completed

52

MOC REFRESHER TRAINING

10 Oct 2003

Completed

53

OPERATION AND MAINTENANCE OF POWER

10 Oct 2003

Completed

54

HAZARD COMMUNICATION, PPE

09 Sep 2003

Completed

55

MICROSOFT OFFICE XP TRAINING

09 Sep 2003

Completed

56

VSD TRAINING

06 Jun 2003

Completed

57

SEA SURVIVAL

03 Mar 2003

Completed

58

CATTERPILLAR GENERATOR G-3516 - TRAKINDO

10 Oct 2002

Completed

59

CONVERSATION ENGLISH COURSE

06 Jun 2002

Completed

60

WOODWARD 723 AND DLSC (GEN-SET)

02 Feb 2002

Completed

61

INTERMEDIATE ELECTRIC - LEMIGAS

07 Jul 2001

Completed

62

MICRO MOTION ANOC SERVICE / CO

06 Jun 2001

Completed

63

BASIC FIRE FIGHTING

04 Apr 2001

Completed

64

Fundamental of Hazards Control

04 Apr 2001

Completed

65

RIGGING TRAINING

02 Feb 2001

Completed

66

SOLAR TURBOTRONIC Advance

11 Nov 2000

Completed

67

BASIC ELECTRIC - LEMIGAS

06 Jun 2000

Completed

68

HELICOPTER UNDERWATER ESCAPE

04 Apr 2000

Completed

69

US FILTER HYDROCYCLONE & WEMCO

11 Nov 1999

Completed

References :

1.Bambang Dian

Team Manager of Operation and Maintenance Chevron Indonesia Company, offshore, Kalimantan.

2.Jafar Ma’arif

Team Manager of operation and maintenance 3 x 100 MW, Chevron Geothermal Indonesia, Duri, Riau

3.Aman Irianto

Team Leader Maintenance, Chevron Indonesia Company, offshore, Kalimantan.

4.Helmy Baharuddin

Plant Manager PLTMG 40 MW, Wartsila, Bontang, Kalimantan.



Contact this candidate