ALI E I SAYED
PETROLEUM ENGINEER
A c a d e m i c S K I L L S
Petroleum Engineerimg
Drilling Engineering
Production Engineering
Reservoir Engineering
Project Management
Pipeline Design
Public Speaking
Research
Report Writing
L E A D E R S H I P
Head of HR at API AZHAR
Chapter
P E R S O N A L D A T A
ALI ELSAYED ALI ABDELMAWLLA
Date of Birth : 02 / 12 / 1993
Passport No : A21686807
Have valid visa for Kuwait
Profession: PETROLEUM ENGINEER
Kuwait Socity of Engineers
Membership No : 36318
P R O F E S S I O N A L E X P E R I E N C E
W o r k E x p e r i e n c e s
P R O F I L E
Aiming to have the chance to
increase my experience that I
gained in the last Three years in
the OIL&GAS Field and to develop
myself technically
and non-technically through your
company.
E D U C A T I O N
Petroleum Engineering
AL-AZHAR UNIVERSITY
From 2012 To 2017
Total appreciation (V G)
Courses in my college.
Drilling, reservoir, production
technology, Process, natural
gases,Refining
Well logging, Geology and
Geophysics.
Graduation Projects
Drilling engineering
Reservoir engineering
Pipe line design
Natural gas process & Refining
Appreciation project (EXCEL)
Al-azhar Petroleum for Innovation
(API) we will consider everyone in
the Oil & Gas industry,interested
and wanna refresh his information
in petroleum field as a Crude oil
,we will improve their properties
and raise their quality to the
degree of innovation.
FLARE PETROLEUM SERVICES Company JULY 2019 – PRESENT I Have Experience in Well Completions.
Previous experience in wells diagnosis.
Experience in artificial lift technology.
Working Experience on well integrity.
Experience in performing well testing and Good Software knowledge. Petroleum Engineer
Operations Engineer (Work-over Rigs)
Petroservices Drilling Overseas (PSDO) SEPT 2017 – May 2019 Handle all the operations related with work-over Rig as Tripping, Fishing, Completion, Testing, Scrubber, Wireline & slickline & coiltube, Rig up &Rig down.
Review rig performance and develop plans to enhance rig specifications so as to profitably deliver improved service to customers. Lead the crew to handle all the operations related to the well. Check My Profile
linkedin.com/in/ali-el-sayed-794967b0/
nrgedge.net/profile/ali-el-sayed-ww4r2c
P e r s o n a l S K I L L S
communication
presentation
Teamwork
Hard worker
Self-motivated
Solve problems
Adobe Photoshop
Microsoft Excel
Microsoft Word
L E A D E R S H I P
Head of PR at SPE AZHAR Chapter
My achievement.
Get 35 field winter training to students.
(15) training at khalda petroleum comp
(20) training at Agiba petroleum comp.
Courses at the engineers' syndicate.
Well control (IWCF), Cement design and
new technology, Well planning.
Wireline & formation evaluation.
with more than 70 audiences.
.
C O N T A C T
Hawally city, Kuwait
Mob : +965-********
Mail:******@**************.***
G: ****************@*****.***
W: *****-********@*****.***.**
P R O F E S S I O N A L E X P E R I E N C E
Drilling, Process, Production Technology
KHALDA Petroleum Company February, 2017 Winter Training (Elsalam Field) Drilling rigs (TS & EDC) surface casing cement job, MWD & LWD, DD, mud logger& mud engineer, oil& gas plant, PT (beam pump & ESP team & wireline).
Drilling, Production Technology
AGIBA Petroleum Company February,2017 Winter Training (Meleaha Field) Drilling rigs (EDC & weatherford) equipment and mud system (Halliburton comp) workover Rig(Trust) problem with ESP pump, well intervention clean by Nitrogen coiletube (Schlumberger comp) fishing job (weatherford comp), gas process, water injection.
Process, Production Technology
Badr Eldeen Petroleum Company September, 2016 Summer Training (Niag Field) Workover rig (dasco) leak in tube and replace ESP with new another (elkhoraif company) Oil plant (tanks& H and L pressure separator& heater). M A I N P R O J E C T S
Economic
About cost evaluation at project in
petroleum industry
Integrity
Corrosion assessment in oil industry.
Oil pollution
About oil spill specially
(MACONDA accident)
C O U R S E S
IWCF (well control)
Lvel one and two
Well Controle equipments
Problems during Drilling
Kick Detection
Killing Method
INTERESTS
Drilling, Production Technology
Belayim Petroleum Company August, 2016 Summer Training (Abo Rdees) Drilling rig ST, complete losses use BBL tool,casing out of target, cleaning by scrubber, high Deviated well, workover rig EDC, Hai way frack job (schlumberger comp), well logging.
Drilling Off Shore, Production Technology, Process Gulf Of Suez Petroleum Company (Gapco) July, 2016 Summer Training Safety introduction, PT (well intervention, wireline) gas lift system, oil plant, HPHT WE.
Elmansoura Pet Comp. (Office) & Khalda Pet Comp (Abo Elgharadeek) Pharaonic Pet Comp & Magawish Pet Comp (Ras Greb)
A N O T H E R T R A I N I N G
T R A I N I N G & I N T E R N S H I P
Well Planning
Well Logging and
Formation Evaluation
Cement Design and
new technology
Driving sport cars.
Kayaking.
Walking.
Travelling.
Parcor.
Reservior Simulation