Name : Surender Singh Dharam Singh
Nationality : Indian
Passport : Z 3047083, Date of Expiry 21/01/2025
Date of Birth : 179/02/1976
Medical :
Seaman’s Book : P201880, DATE OF EXPIRY - 17/10/2022
QUALIFICATION
HSE SATURTION DIVER COURSE
CERT NO CB/555667/08
( CLOSED BELL)
SAFETY TRAINING BOISIET (OPITO APPROVED)
Sea Survival / Offshore Survival
H2S OPITO APPROVED
DMT
CSWIP 3.1U
STCW 2010
VALID TO -
CERT.NO.- IMES/PST/63395/08/2017
18-08-2020
{EXPIRY DATE-
{EXPIRY DATE
{ CERT.NO
SKILLS
SATURATION DIVING /DMT/CSWIP3.1u IN OFFSHORE IN INDIA AND ABOARD.
EXPERIENCE SUMMARY
I am working in commercial diving since 1992. I am working in offshore commercial diving since 2005 I am working as Saturation Diver since 2008.
Career History
{Company} – {Designation} – {Date of Joining} until present
Overview of responsibilities
EMPLOYMENT HISTORY
Project
Vessel/Barge
Job Title
From
Until
KPCL
VARIOUS DAM PROJECTS
DEC 2018
TILL DATE
KPCL
VARIOUS DAM PROJECTS
29-11-16
06.09.18
MCDERMOTT/ SAUDI ARAMCO
DB-27
BOAT LANDING INSTALLATION
02-08-15
16-10-15
MCDERMOTT/ SAUDI ARAMCO
DB-27/ALLAIAZ ARRISTON/ INTERMAC 406
STINGER CHECK/ LEGS CLEANING USING WATER JET/ SPOOL PIECE INSTALLATION WITH SUBSEA VALVE SKID/ TIE INS
04-05-15
25-06-15
MCDERMOTT/ SAUDI ARAMCO
DB-27
INSTALLATION OF BOAT LANDING/ VIDEO INSPECTION OF CABLE CROSSING
01-12-14
02-01-15
MCDERMOTT/ SAUDI ARAMCO
INTERMAC-406
INSTALLATION OF MATRESS OVER CABLE, CABLE LAYING/ SEA BED SURVAY, ISPECTION OF TRENCH
02-08-14
15-11-14
MCDERMOTT/ SAUDI ARAMCO
INTERMAC-406
SPOOL PIECE INSTALLATION / TIE INS / INSTALLATION OF RISER / METROLOGY & INSPECTIOS / FEXI PIPE LAYING
26-04-14
14-07-14
MCDERMOTT/ SAUDI ARAMCO
DB-32
SPOOL PIECE TIE-IN/ RISER INSTALLATION/ METROLOGY AND INSPECTIONS
12-02-14
03-04-14
MCDERMOTT/ SAUDI ARAMCO
DB- 27
SLEEPER INSTALLATION,VIDEO INSPECTIONS OF TOUCH DOWN WHILE DOING 24 INCH AND 16 INCH PIPE LAYING/ AND INSPECTIONS OF STINGER.
21-08-13
24-11-13
MCDERMOTT/ SAUDI ARAMCO
DB- 27
MATRESS LAYING ON CABLE LAYING PROJECT/ DREDGING TO FILL THE TRENCHE
18-02-13
17-04-13
MCDERMOTT/ ONGC/ /MHNRD
DB- 101
BROCO CUTTING OF BUCKETS, CUTTING OF TRUNIONS,CUTTING OF BOUYANCY TANKS USING BROCO RODS
30-10-11
05-02-12
MCDERMOTT/ ONGC/ KAKINADA
DB-32
BROCO CUTTING OF BUCKETS, INSPECTIONS OF GROUTING
23-04-11
23-05-11
AMMA LINES PVT LTD
KARAIKAL/ PONDICHERRY
SEA BED PREPRATION/ BLOCK PLACING/ SEA BED SURVEY.
15-03-11
05-04-11
AOGC/ UDPL/ ONGC MUMBAI
WB MADHWA
RISER INSTALLATION, ANODE CUTTING USING BROCO/ CLAMP INSTALLATION
04-10-2010
16-02-11
UDPL/ L&T/ONGC/MUMBAI HIGH
WB MAHESH
INSTALLATION AND INSPECTION OF RISER.
28-03-10
27-05-10
SIX CONSTRUCT CO
DOHA, QATAR
AIR SUPERVISOR/ DIVER/ SEA BED PREPRATION/ BLOCK PLACING/ SEA BED SURVEY
13-01-10
16-03-10
SIX CONSTRUCT CO
DOHA, QATAR
AIR SUPERVISOR/ DIVER/ SEA BED PREPRATION/ BLOCK PLACING/ SEA BED SURVEY
09-06-2009
30-008-2009
AOGC/ UDPL/ ONGC MUMBAI
WB MADHWA/ SAT DVER
SPOOL TIE-IN WITH RISER AND PIPE LINE/ SURVEY (29 DAYS SAT.)
08-03-2009
07-05-2009
AOGC/ UDPL/ ONGC MUMBAI
WB MADHWA/ SAT DVER
INSTALLATION OF RISER CLAMP, INSTALLATION OF J TUBE, UNDERWATER CUTTING OF BOUYANCY TANK AND GROUT PIPES (15 DAYS SAT.)
23-10-2008
10-01-2009
CCC/ NQP/MUMBAI HIGH
HLS 2000
INSTALLATION OF RISER AND CLAMP/ J TUBE
29-04-2008
26-05-2008
UDPL LTD
DOHA QATAR
REMOVALS OF COFFER DAM, INSPECTION OF OIL BOOMS/ SCREENS
01-10-2007
14-01-2008
BEKK SOLUTIONS LTD
SEA STALLION /RPL, SIKKA
/ INSPECTION OF SEA BED/ ISTALLATION OF GROUT BAGS/ INSPECTION OF GROUT BAGS AFTER GROUTING/ UNDER WATER CUTTING OF CASINS
12-04-2007
31-05-2007
FALCON OFFSHORE SUBSEA LTD
TAHARA RIG / PY3, PONDICHERRY
WELDING JOINT CLEANING/SEA CHEST CLEANING/ REMOVAL AND FIXING OF SEA CHEST/ VDM & HM JOINT CLEANING
28-02-2007
14-03-2007
ARCHIRODON CONSTRUCTION
QATOFIN, DOHA, QATAR
SEA BED PREPRATION/ AGGREGATE LEVELLING / BLOCK PLACING FOR JETTY/ PIPE LAYING
SEPT 2006
FEB 2007
ARCHIRODON CONSTRUCTION
DUBAI MARITIME CITY, DUBAI
LAYING OF GEOTEX/PLACING OF STABITS/ SEA BED INSPECTIONS
22-12-2005
12-06-2006
GULF DREDGING CONSTRUCTION COMPANY
UMM al Maradem/ FAHAHEEL
BLOCK PLACING/ GEOTEX PLACING/ ARMOUR PLACING/ STABITS PLACING.
20-02-2002
14-08-2005
DIVERS AND ENGINEERS INTERNATIONAL
MUMBAI
VARIOUS SHIPPING WORKS/ UNDERWATER SHIP REPAIRING/ PROPELLER DEFOULING
20-10-2000
25-01-2002
KIER INTERNATIONAL LIMITED
PPN POWER PROJECT
PIPE LAYING OF DIA 2.7 MTRS/MUD LIFTING OF SEA BED AROUND THE PIPE LINE/ WATER JETTING NEAR THE PIPE.
29-06-1999
18-10-2000
DIVERS AND ENGINEERS INTERNATIONAL
MUMBAI AND JAMMU
SEALING OF SILT GATE OF DAM/ UNDER WATER VIDEO GRAPHY OF SHIP/ UNDERWATER SHIP REPAIRING/ PROPELLER DEFOULING.
07-03-1996
15-06-1999
EMGE DIVING
KPCL
CLEAN BLOCK JOINTS USING PNEUMATIC CHIPPER, CLEAN JOINTS BY PNEUMATIC BRUSH/ JOINTS BY PNEUMATIC BRUSH/ JOINT FILLING USING CEMENT
28-06-1994
21-12-1995
EMPLOYMENT HISTORY
Project
Vessel/Barge
Job Title
From
Until
AMMA LINES PVT LTD
VIKRAM ISPAT, REVDANDA
INSPECTION OF SEA BED/ WELL SINKING/ SEA BED PREPRATION AND BLOCK PLACING
17-09-1992
30-04-1994
THE UNDER WATER CENTRE
SAT DIVER TRAINING
TRAINING COURSE
21-02-2008
07-03-2008
THE WEST COAST DIVING SCHOOL
IMCA AIR DIVER TRAINING
TRAINING COURSE
26-12-2006
26-01-2007
EMPLOYMENT HISTORY
Project
Vessel/Barge
Job Title
From
Until
SURENDER SINGH DHARAM SINGH
SATURATION DIVER
H.NO. 408,
Nr. Gyan Devi Montessori School, SECTOR- 9,
GURUGRAM,
HARYANA - 122001
INDIA
E-MAIL ID – ***********@*****.***
AND
***********@*****.***
CONTACT NO. +91-987*******
&