Post Job Free

Resume

Sign in

AWS CWI

Location:
Midland, TX
Salary:
TBD
Posted:
August 23, 2020

Contact this candidate

Resume:

KEVIN C. LANDRY

Morgan City, Louisiana *****

985-***-****

adfi3d@r.postjobfree.com

Currently in Midland TX.

EDUCATION:

Graduate of Fort Walton Beach High School

Completed welding course at Okaloosa Walton Vocational School

AWS Certified Welding Inspector #92030481 March 2022

Safe Gulf #SFG003990269

TWIC # 01496120 January 2023

U. S. Passport #533064863 May 5, 2025

T-HUET with Sea Survival #00735195300118145231 January 2022

Confined Space Entrant/Attendant, Rescue, Supervisor Training February 2019

Fall Protection End User, Rescue, Competent Person Training February 2019

EXPERIENCE:

5/2018- 5/2020 Intertek Aim

Conducting welder performance testing on API 1104 and ASME Section IX

3/2018-5/2018 Intertek

QA/QC contracted to Dynamic Ind. For the Chevron Big Foot Offshore Hookup

7/2015-12/2017 Intertek

Structural Lead Inspector/HSSE (assistant coach) for Shell Appomattox

Packaged Equipment Fabrication at Dynamic Industries Inc. New Iberia, La.

5/2014-6/2015 Intertek

Quality Verification Lead Inspector/HSSE (assistant coach) for Shell Stones

Suction Piles and Spring Buoy Fabrication at Twin Brothers Marine LLC

Responsibilities include overseeing construction, NDE and Dimensional

control of six (6) 18’-6” x 90’ three (3) 18’-6” x 93’ suction piles, and all

associated spring buoys for the Shell Stones FPSO.

4/2014- 5/2014 Intertek

QA/QC Inspector / Consultant

8/2013 – 4/2014 Intertek

QA/QC Inspector / Consultant Contracted to New Industries for outside

Vendor Inspection. Included inspection of Plems & Plets throughout fabrication

and coatings.

7/2011 – 8/2013 Intertek Moody

Structural / Piping Lead Inspector on Shell WD 143C Project

Responsibilities include fabrication of a four leg, four skirt pile jacket,

deck, piles and bridge at McDermott’s yard in Amelia, La.

Review of all X-Ray film associated with structural and piping, visual

inspection of welding associated jacket and deck.

Monitor fitting, welding and dimensional checks by the subcontractors

throughout the fabrication of the project.

2004 – 2011 Casbarian Engineering Associates, LLC

Construction Superintendent / CVA

In charge of coordinating and overseeing offshore and onshore construction fabrication and installation of structures, pipe lay, refurbishment, riser installation, P&A, process piping and caissons. Coordinated underwater and topsides inspections and repairs for platforms damaged in hurricanes. Repairs consist of installing underwater repair clamps that were welded, grouted or mechanically stressed and member grouting with the assistance of divers from a DSV. Major projects include fabrication of a 670’ W.D. four leg, eight skirt pile structure (Simba) for Taylor Energy Company. Establish cost and time frame estimates required to perform work and keeping track of schedule and costs involved during fabrication.

2003 – 2004 Petro-Marine/BCI Engineering, Inc.

Project Supervisor

In charge of coordinating and over seeing offshore and onshore construction fabrication and installation of structures, refurbishment, riser installation, P&A, process piping and caissons.

2001 – 2003 Paloma Energy Consultants

Project Supervisor

In charge of coordination and overseeing onshore and offshore construction i.e., Pipe lay, fabrication and installation of structures, refurbishment, riser installation, P&A, process piping and caissons

2000 – 2001 Dynamic Ind., Inc. (Port of Iberia)

Quality Control Dept.

Inspection of structural and process piping for oil and gas companies in all aspects of fabrication.

1998 – 2000 Twin Brothers Marine (Port of West St. Mary)

Quality Control Dept.

Inspection of structural and process piping for oil and gas companies in all aspects of fabrication.

1998 – 1998 MEI Engineering and Quality Services

Quality Control Dept.

Contracted to Brown and Root (Houston TX.) for Exxon Diana Project.

1990 – 1998 J. Ray McDermott, Inc.

QA/QC Dept. Involved with fabrication of four U.S Naval Catamaran hull type vessels (T-Agos) at McDermott’s Shipyard. QA/QC involvement with the fabrication of modules for NewPort News Ship Builders of the (CVN 74) Air Craft Carrier. Visual inspection, tractability and NDE in many aspects of Fabrication throughout McDermott’s Amelia, La. Yard. Fabrication inspection on Texaco Petronius Compliance Tower. 3- years in inspection of roll goods from the pipe mills.

1986 – 1990 Swiftships, Inc.

First Class Fitter/Welder

1985 – 1986 Gulfcraft, Inc.

First Class Fitter/Welder

1978 – 1985 Swiftships, Inc.

First Class Fitter/Welder



Contact this candidate