** *********** ***** *****, *******, Louisiana 70663 C: 252-***-**** ****.*********@*****.*** PROFESSIONAL SUMMAY

Thirty-Four years of experience in the Construction Industry. Experience in the Power and Industrial Industry. Supervises and coordinates activities of workers engaged in erecting and operating machines to hoist and convey machinery and equipment, such as structural beams, metal tanks, and wall and floor slabs, at construction site: Specifies locations for movement and erection of derricks, hoists and cranes, using knowledge of various methods of Jack and sliding and lifting equipment. Ensures timely engineering and procurement documentations. Plans and schedules work and coordinate with other craft. Primarily responsible for quality, accuracy, productivity and the timely completion of the work with safety in the best interest of the workers. Provides clear direction and explains plans and contract terms in a clear and understandable way. Safety-conscious and detail-oriented. At this point of life I’m ready for the next step of my career. WORK HISTORY

Structural General Foreman, 2017-2019 Sasol Mega Project- West Lake, LA Rigging Superintendent, 2015-2017 Alliant Energy – Marshalltown, IA Rigging Superintendent, 2015 Agrium US Ammonia – Borger, TX Coordinate with construction managers and mechanical engineer, over seen all critical lifts and rigging plans Oversaw setting of equipment (pool reactor 840 ton, chiller 340 ton, stripper 150 tons and set others heat Exchangers and vessels. All riggers and crane operators worked under my department.

Rigger/Ironworker Structural Superintendent, 2012-2015 Solid Waste Authority – West Palm Beach, FL Coordinate with the structural engineers, oversee all steel erection of 12,000 + tons Review and plane all critical lifts and in charge of all cranes, operators and riggers. Worked boiler dept. of setting boiler components, water walls, economizers, steam drum, SDA, heat exchangers for three units. Setting of three over head cranes, conveyors for millwright Department. Watch over sub-contractors for steel erection 1500 + tons.

Rigging Superintendent, 2012

Molycorp – Mountain Pass, CA

Worked with engineering and coordinated steel deliveries throughout the project. Planned all critical crane lifts; oversaw all steel erection of 850 ton. Set all equipment and modules. Rigging/Ironworker Structural Superintendent, 2009-2011 Solid Waste Authority – West Palm Beach, FL

Engineering, procurement, and construction contract with both fixed and reimbursable components for refurbishment of two RDF (trash burning) boilers, including replacement of two precipitators with bag houses.

Ironworker Structural Superintendent,

Siemens Westinghouse – Franklin, GA

Wansley 500-MW combined.

Ironworker Structural Superintendent, 2008 Archer Daniels Midland – Cedar Rapids IA Provided construction labor and supervision to perform the steel erection, piping and equipment installation for the milling, mash preparation, fermentation, and distillation units at the ADM, Cedar Rapids, ethanol facility.

Ironworker Structural Superintendent, 2007 Catlettsburg Refining, LLC, – Catlettsburg, KY Boiler replacement and consolidation.

Rigging/Ironworker Structural Superintendent, 2007 BP Alternative Energy – Texas City, TX

Engineering, procurement, and construction for the installation of a 250-MW steam turbine-generator with Ancillary equipment.

Rigging/Ironworker Structural Superintendent, 2007 Trans Carolina Products, LLC

TCA project. Provided steel erection and setting all equipment. Rigging/Ironworker Structural Superintendent, 2006-2007 OCI – Green River, WY

Engineering, procurement, and construction of an alternative energy conversion project. Project included a new 320mm BTU/hour, vertical down-fired pulverized coal combustion chamber feeding a new 320-tph, Metso Rotary calciner and a new FLS ESP. The project also included a 216mm BTU combustion chamber retrofit to an existing calciner. Ironworker Structural Superintendent, 2006

Owens Corning – Chester, SC Cultured stone capacity increase project. Rigging/Ironworker Structural Superintendent, 2005 International Paper – Georgetown, SC Recovery and power boiler annual inspection and repair of four boilers, plus wall panel replacement capital work on two recovery boilers.

Ironworker Structural Superintendent, 2005 U.S. Gypsum – Bridgeport, AL Provide craft labor and supervision.

Ironworker Structural Superintendent, 2004

Plaskolite Inc. – Zanesville, OH

CP technology project.

Rigging/Ironworker Structural Superintendent, 2002-2003 Weyerhaeuser – Valliant, OK Recovery boiler rebuild and planning. Rigging/Ironworker Structural Superintendent, 2000-2002 OCI Chemical Corp. – Decatur, AL

Grassroots sodium per carbonate facility. First manufacturing plant to be built in the U.S. by this Korean chemical company. OSBL engineering, procurement, and construction of a plant to make 40,000 mtpy of coated Sodium per carbonate through the reaction of soda ash and hydrogen peroxide.

Rigging/Ironworker Structural Superintendent, 1996-1997 Mead Paper – Stevenson, AL

Installation of new 300,000-pph waste fuel boiler, new recovery boiler, and chemical conversion system. Wood yard upgrade included new portal crane, chip screen, and washing system. Installation of new continuous digester, new refiners, washers, upgrade of stock approach system, and rebuild of No. 2 paper machine.

Rigging/Ironworker Structural Superintendent, 1994-1996 KBR – Houston, TX

Rigging/Ironworker Structural Superintendent, 1988-1994 Fluor Daniels – Greenville, SC

Ironworker Structural Superintendent, 1997-1998

Southeast Paper Manufacturing Co. – Dublin, GA

Engineering and construction for the No. 2 newsprint paper machine upgrade project. Ironworker Structural Superintendent, 1997-1998

Mead Paper – Chillicothe, OH

Major pressure part replacement, retrofit of the No. 9 recovery boiler. Ironworker Structural Superintendent, 1997-1998 Anniston Chemical Agent Disposal Facility

– Anniston, AL Entire site development and construction to install equipment for four major buildings: container handling building, process utility building, laboratory building, and warehouse building.

Rigging/Ironworker Structural Superintendent, 1995-1996 Cabot Corp., – Ville Platte, LA Engineering, procurement, and construction services for emission systems to collect and flare or incinerate all uncombusted tail gas and collect and disperse all combusted tail gas at two carbon black facilities.

Rigging General Foreman/Iron General Foreman, 1988-1994 Flour Daniels, Exxon Mobile- Baton Rouge, LA

Rebuilt Coke Drums, Coke Drum Change Out, Paper Machines Rebuilds and new installment, Trash Incinerators, and Modules

LEADERSHIP DEVELOPMENT

Crew Leadership Training

Front Line Supervisor Training

Construction Supervisor Academy

Strategic Thinking for Supervisors

Leadership Essentials

Coaching and Mentoring

EDUCATION

High School Diploma: 1981

Sulphur High- Sulphur, LA

NCCER Certified Instructor Practical Examiner Iron NCCER Certified Plus Rigger Practical Examiner Rigging

NCCER Certified Plus Iron Worker