KANAGALAKSHMI.P Page *
KANAGALAKSHMI P
**/*, ********** **** ***** Street, Kodambakkam, Chennai.
Contact No: 822*******
Email id: ***************@*****.***
Career Objective:
Attain challenging position in civil industry where my technical, analytical and interpersonal skills will play key role in achieving organizational goal.
Academic Qualifications:
Bachelor of Engineering (Civil Engineering)
Govt. College of Engineering, Anna University
First Class with Distinction - 80%
Graduated: May 2008
Post Graduate Diploma in Project Management
Maharastra Institute of Technology, Pune,
First Class - 70%
Graduated: May 2012
Work Experience:
Company: VAX Consultants Pvt Ltd, Chennai
Position: Quantity Surveyor, January 2016 - Present Responsibilities:
Preparation of Bill of Quantities and Cost Estimate for Detailed Project Report
• Construction of Elevated Highway 10 km along Avinashi Road in Coimbatore City from Upplipalayam to Chinniyampalayam - Kalapatti Airport (SHU-52).
• Elevated Six laning corridor and Six laning at grade with Service Road from Km 14+635 to Km 37+000 from Maduravoyal (Junction with Chennai Expressway) upto Sriperumbdhur (Junction with Bangalore-Chennai Expressway) in the State of Tamilnadu under EPC mode
• Elevated Six lane corridor and Six lane at grade with Service Road from Km 28+000 to Km 50+000 of NH-45 from Tambaram to Chengalpattu Section and at-grade Eight lane with Six lane Flyover in built-up Section from Km 50+000 to Km 121+000 on NH-45 from Chengalpattu to Tindivanam (Total 93 km) in the state of Tamil Nadu KANAGALAKSHMI.P Page 2
• Elevated Six laning corridor and Six laning at grade with Service Road from Km 11+000 to Km 21+400 from Mathavaram (Junction with Chennai Expressway) upto Ponnamalleee (Junction at ORR) 10.4 km in the State of Tamilnadu under EPC mode
• Extension of Vadapalani Flyover to Ashok Pillar Junction
• Gooty to Manvi 143 km Two Lane with Paved Shoulder in the State of Karnataka
• Channarayapattana - Holenarssipur - Arkalgud - Kodlipet - Madikeri - Virajpet - Makutta and connecting Kannur ( in Kerala ) 180km 4 Lane/2 Lane in the State of Karnataka.
• Walajapet to Sriperumbadhur 70 km of NH-4 ( 6 Lane) in the state of Tamil Nadu
• Nagercoil to Kanyakumari NH-47 & 47B Additional Cross Drainage structures across water tank areas i.e. Bridges, Culverts etc in the state of Tamil Nadu on EPC Mode.
• NH565 – Gotlagattu – Podili – Uppalapadu – Chimakurthi – Ongole on NH16 (SH-53 Existing) in the state of Andra Pradesh
• Up-gradation of Pathapatanam to Nasarnapeta 40 km of NH 326A road to Two lane with paved shoulders in the state of Andhra Pradesh
• Up-gradation of Badrachalm to Kunta 64 km of NH 30 road to Two lane with paved shoulders in the state of Andhra Pradesh
• NH-45C Four Laning of Cholapuram – Tanjavur Section from CH:116+440 to CH:164+275 (47.83 km) of NH-45C in the State of Tamil Nadu
• NH-45C Four Laning of Pinalur - Sethiyathopu to Cholapuram Section From Ch:60+250 to CH:111+000 (50.75 km) of NH-45C in the State of Tamil Nadu
• NH-227 2/4 laning of Trichy – Jayamkondan – Chidambaram section of NH-227 130 Km in the State of Tamil Nadu
• Improvement of Port Access Road and Kamarajar Port Road from Vallur Junction to Kamarajar Port Road (KPL) Main Gate (2.376 Km) for Tamil Nadu Road Development Company
Company: Gammon India Ltd, Chennai.
Position: Assistant Manager, November 2014 – December 2015 Project: Chennai Metro Rail Project Underground UAA – 02 & UAA - 03, Chennai. Responsibilities:
Certification of Subcontractor’s Bill for Subcontractors like L&T Constructions, L&T Geo Structures, Al- Ghurair Foundation India Pvt Ltd and HSSG India Pvt Ltd.
Preparation of Work Order with Detailed Terms and Conditions and Update the same in ERP
Comparison of Subcontractor Bill with Client Bill KANAGALAKSHMI.P Page 3
Company: Gammon India Limited, Mumbai.
Position: Assistant Manager, June 2008 to October 2014 Project: Santacruz - Chembur Link Road Project Section - II, Mumbai. 2.45 Km, 1st Level Flyover 2 x 2 Lane, 2nd Level flyover 0.69 Km 4 Lane, additional Cross arm of 0.9 Km 4 Lane, 6 Lane ROB Composite Girder 51m Span and 4 Lane RoB 40m Span
Responsibilities:
1. Bill of Quantities (B.O.Q) preparation & analysis, Rate Analysis, quantity surveying, Finalization & Negotiation with Contractors & Vendors, Preparation of interim payment certificates, certifying Subcontractor’s Bills, Calculating the quantity of constituent materials from the drawings in advance to facilitate the purchasing of items
2. Generation of client bill as per required formats 3. Preparing client billing including taking daily measurement of works. 4. Getting certifications, recording variation, collecting payment, complete documentation required for the job. 5. Site visits, Cost Control of the project and Coordination with contractor 6. Coordinate and monitor a team of contractor works 7. Calculating the quantities as per the drawings. 8. Reconciliation between estimated quantity and contractor's billed quantity. 9. Finalizing project cost analysis.
10. Responsible for reviewing drawings in AUTO CADD and workout Quantities from AutoCAD drawings. Must be able to coordinate all AUTO CADD drawings received from design team & various consultants. 11. Purchasing of materials required for construction by coordinating with suppliers / vendors / contractors, obtaining quotes, technically qualifying the specifications, finalizing vendors. 12. Prepare regular MIS reports on time
Skills:
o Expertise in AutoCAD, STAD Pro and ERP
o Could operate effectively with Microsoft office tools namely word, excel, power point, access. o Efficient management and organizational abilities o Excellent team player, initiator, quick learner and responder o Have good problem solving with analytic thinking Personal Profile:
FATHER’S NAME : Perumal. R
DATE OF BIRTH : 20.03.1987
KANAGALAKSHMI.P Page 4
MARITAL STATUS : Single – Unmarried.
LANGUAGE KNOWN : Tamil, English and Hindi
PERMANENT ADDRESS : 328/1, Keelapalayam Street,
Tenkasi - 627811,
Tirunelveli Dt,
Tamilnadu State, India.
Declaration:
I hereby declare that all the information furnished above is true to the best of my knowledge. Place: Chennai Yours truly,
Date: 15.02.2019 (KANAGALAKSHMI.P)