SACHCHIDA NAND PANDEY
Scaling new heights of success with hard work & dedication and leaving a mark of excellence on each step;
aiming for top level assignments as Plant Head with a leading organization of repute in Thermal Power Plant (Captive
& Mega) Sector, preferably in PAN India, Overseas, Gulf Countries
: ************@*****.*** +91-882******* http://in.linkedin.com/in/snpandey15/
CORE COMPETENCIES PROFILE SUMMARY
Result-oriented Business Leader offering over 3 decades of rich experience with
impressive success in consistently increasing business turnover YOY by re-
Strategic Planning
organizing business direction through strategic initiatives & cost control
measures
Program / Project Administration
Led successful execution of large scale construction of Mega (BTG & BOP
Statutory Compliance Supercritical & Sub Critical) & captive power projects encompassing
installation, commissioning, testing, operation and maintenance(day to day,
Resource Optimization
predictive & annual O/H of BTG & BOP) in all the discipline Civil, Mechanical,
Electrical & C&I construction works in RKM Power Gen Pvt. Ltd.
Operations Excellence
Comprehensive experience in managing the entire gamut of project site
Workforce Governance activities, right from preparation of schedules, technical specifications,
planning of erection / commissioning sequences, material related activities till
Financial Mgmt. (CAPEX Planning / Budgeting)
handover in compliance with safety, health and quality standards
Quality Management Systems Implementation Expertise in Installation & Commissioning of BTG & BOP / Operations &
Maintenance of Thermal Mega & Captive Power Plants
Process / Productivity Improvements
Excellent track record of setting up plants from scratch and turning around
Management Reporting performance of underperforming production units into high performing units
Designed, scheduled & set-up projects, ensured completion of assignments and
SOP Development / Management
minimized performance bottlenecks for high productivity with maximization of
men, material, cost & machine
Tendering / Techno-Commercial Matters
Excellent in enhancing the operational efficiency, eliminating obsolescence and
HSE Management achieving cost reduction through process improvements, fuel replacement,
heat reduction, materials management and inventory control
Stakeholder Mgmt. (External / Internal)
Experienced in managing functions for interfacing with Villagers, Statutory State
Supplier & People Relationship Management Govt. Agencies such as Director of Boilers & Safety, Electricity Regulatory
Bodies, Police, District Collector, Tahsildar, Labour Commissioner & Labour
Plant Operations & Maintenance
Officers, CPCB & SPCB Clearances, Hazardous Permission
Supply Chain Planning Implemented supplier partnership programs that provided competitive
advantage while ensuring premium quality supply and a reduction of total
Manpower Management
system costs
Time & Cost Reduction Management Track record of implementing cost saving measures to achieve substantial
reduction in terms of raw materials, manpower and machine utilization
SOFT SKILLS CAREER TIMELINE
Collaborator Since
RKM Power Gen Pvt. Ltd 4X 360MW, Uchpinda Near Kharasia,
May14
Dabhra, District- Champa (CG) as Sr. V.P. Cum Director
Communicator Jun13
Apr14 M/S SHEL NGP. RIG. as Sr. VP (Project)
Planner
Nov11- NCCL, Khuntani, Orissa as AVP (Sr. GM) / Project Head
Jun13
Change Agent Apr10- Jindal India Thermal Power Limited, Derang Angul, Orissa as
Nov11 V.P. (BTG & BOP-Head/Project Head)
Nov07
Adani Power Limited, Mundra, Gujarat as DGM -Project
Apr10
Mar06- Hindalco Industries Ltd. (Unit: Birla Copper) Dahej, Gujarat Manager
Nov07
Mar93
Grasim Industries Ltd. Nagda (M.P.) Deputy Manager
Mar06
May84 U. B. Engg. (W. I. E. Ltd.) Obra, Nagda as Sr. Engineer
Mar93
WORK EXPERIENCE
Since May14 with RKM Power Gen Pvt. Ltd . 4X 360MW, Uchpinda Near Kharasia, Dabhra, District- Champa (CG) as SR. V.P. Cum
Director of The Board Member, Occupier of Factory & Plant Head
Key Result Areas:
Increasing technical specification of BTG & BOP area and raising tenders for price biding, finalization of bid & vendors, issuing of LOI
for engineering, materials, execution and commissioning of equipment
Reviewing design, acquiring approvals, basic engineering, sizing of boiler, turbines, ESP Cooling Tower, WTP
Working on the wide gamut of tasks entailing Water Balance Diagram, QAP, Valve Selection, Piping Pressure Drop Calculation,
selection of materials and thickness calculation
Managing and reviewing the plot plan, layout, general arrangement, P&ID, flow diagram, calculation of shaft power for rotating
equipment and determination of auxiliary power consumption
Reviewing the activities for area grading and development infrastructure like roads, drains, boundary wall, offices, stores, labour
colony, staff / workers gate and materials in & out gates
Planning schedule for sequential flow of incoming materials for the BTG & BOP according to project schedule & commissioning
requirement & monitored for the same
Implementing planned schedule of BTG & BOP for sequential monthly erection requirements up to coal synchronization to meet the
project schedule & monitoring the same
Scheduling for availability of Contractors Manpower, Tools & Plants and other resources up to coal synchronization to meet project
schedule & monitoring the same
Reviewed Plant Standard Operating Procedures (SOP) and provided necessary support for Job Safety Analysis (JSA) /Risk
Assessment
Executing proper quality control system, handling construction of foundation of BTG & BOP areas, chimney, cooling tower, ETP, DM
plant, intake reservoir & pump house, CWP pump house, all control rooms, labs, switch yard foundation, HT & LT transformer
foundation, of civil works after that installation & commissioning BTG & BOP
Performing Installation, commissioning, O & M of BTG & it auxiliaries & BOP (AHP, CHP, DM Plant, ETP) of the supercritical, subcritical
plant, captive power plant (PF,AFBC & CFBC boilers) like 660MW,600MW, 330MW,360MW,,30MW,40MW,60MW & 15MW etc.
Administering operations like cold, warm & hot start up & emergency handling and safe shut down of the BTG of 330MW, 360MW,
60MW, 30MW, 12.5MW subcritical & captive power plant & its BOP
Developing:
o Checklist & spare parts list for maintenance of all the equipment of BTG & BOP for preventive, annual overhauling and day to
day maintenance
o SOP & check list for supercritical & subcritical plant & captive power plants
o Inter locks & protection of all the equipments of BTG & BOP
Spearheading the preventive & shutdown maintenance and ensuring maximum availability of equipment
Planning, scheduling & allocating the work and ensuring the working conditions are as per safety standards
Collaborating with the Production Department, facilitating the infrastructure and operating the plant with optimal power and fuel
consumption
Worked in the areas of budget development and tracking, value capture assessment, reporting, communications as well as leading
various corporate-wide and operations-specific initiatives as required
Supervising the financial aspects and CAPEX related to payback, infrastructure and development activities
Maintaining close coordination between productions, supply chain management, sourcing, and other functional divisions for smo oth
Plant Operations and project execution
Reviewing existing processes and initiating measures for enhancin g productive capacity as well as productivity, within same
budgetary limits
Managing projects for the erection and commissioning of equipment and utilities for enhancing operational capacity
Tracking project progress with respect to cost, resource deploym ent & utilization, time overruns, compliance with quality standards,
and manpower planning
Ascertaining areas of improvement and recommending process modifications and equipment calibrations to enhance operational
efficiencies of the systems
Ensuring maintenance of optimum inventory levels to achieve adequate stock of spare parts
Interacting with Villagers, Statutory State Govt. Agencies such as Director of Boilers & Safety, Electricity Regulatory Bodie s, Police,
District Collector, Tahsildar, Labour Commissioner & Labour Officers, Factory Director, CPCB & SPCB clearances, hazardous
permission
Highlights:
Administered the planning, installation, erection & commissioning of BTG and its auxiliaries, & BOP ( AHP, HCSD Pumps & its piping,
BTG & Bop Compressor, Chp, Stacker & Re - Claimers, Twin Bagan Tippler with 8 Hoppers, ETP and DM plant, intake pump house
with 40 km pipe line to reservoirs, raw water pump hose
Ensured dispatches in the erection sequence order
Led operations and maintenance of power plants with reliability, economical, safety and also developing the operation staff on
maintenance aspects
Implemented cost saving and energy saving techniques/ measures and modifications to achieve substantial reduction in O&M
expenditures and work within the budget
Developed, managed and monitored the performance of multi-skilled work force and conceptualizing need-based training programs
for maximizing operational efficiency
Successfully commissioned all four unit & made COD in time as desired and saved the plant from NPA
Single-handedly managed Unit third and fourth made the commissioning and COD in record time with in four month of 50% left out
jobs and convert in to mega project
Managed unit operations or export the power 350 MW to UPPL from March -16 from unit -1 and other Three units are in commercial
generation Power supply to Telangana through Discom
Coordinated with SECL cement plants, CECB Raipur, Bilaspur, national highway for coal procurement and ash disposal and 100% ash
utilization for clean environment
Worked on feasibility report finalization for FGD & SCR & SNCR, to reduction of SPM equipment installation of facilities to meet MoEF
& CC emission norm gazette notification on Dec15
Prepared the COD (Commercial Operation Date) unit-1 26-11- 2015, unit-2 11-02-2016, unit -3 14-11-2017, unit-4 20-03-2019
Worked on Applicable Emission Limit Unit 3&4 So2-100mg/Nm3, Nox-100mg/Nm3,SPM-30mg/Nm3,Mercurry-.03mg/Nm3 by
December 2022
Jun13-Apr14 with M/S SHEL NGP. RIG. as Sr. VP (Project) Coordinator for various Projects
Nov11-Jun13 with NCCL, Khuntani, Orissa as AVP (Sr. GM) / Project Head
Apr10-Nov11 with Jindal India Thermal Power Ltd., Derang Angul, Odisha as V.P. (BTG & BOP-Head/Project Head)
Nov07-Apr10 with Adani Power Limited, Mundra, Gujarat as DGM -Project
Mar06-Nov07 with Hindalco Industries Ltd. (Unit: Birla Copper) Dahej, Gujarat as Manager
Mar93-Mar06 with Grasim Industries Ltd. Nagda (M.P.) as Deputy Manager
Highlight:
Completed 10,000 Tons erection of above sets and its commissioning within 24 months from material ordering to commissioning
under supervision of equipments suppliers
Single handedly managed complete plant on DCS based provided by BHEL Max System
Managed a wide gamut of activities entailing finalization of machineries, Design engg, erection, commissioning, operations,
maintenance, inventory planning & performance assessment of :
o 75 TPH & 65 Kg/ Cm2, Coal Fired Air Fluidized Bed Combustion Boiler of BHEL make
o Extraction cum Back-Pressure Steam Turbines of 16.5 MW capacity of SHIN NIPPON, Japan
o Coal Handling Plant of 150 TPH capacity Coal size: 6mm supplied by M/s Sayaji Iron & Steel Company, M/s Naveen projects
o Ash Handling Plant of 75 TPH capacity, make: M/s Melco, Faridabad
May84-Mar93 with U. B. Engg. (W. I. E. Ltd.) Obra, Nagda as Sr. Engineer
PROFESSIONAL ENHANCEMENTS (TRAININGS)
Undergone trainings with:
o BHEL Thirichy on Power Plant for Operations & Maintenance
o NTPC at Nagda on Power Plant Emergencies
o Design, Selection and Maintenance of High Pressure Boiler at Baroda
o In-plant Skill Development Programme for Updating Plant Operational Skills
o Development Programme for Updating Plant Operational Skills
o Statistic Quality Control Programme
o Computer Awareness Training Programme
EDUCATION/CERTIFICATIONS
B.E. Mech. Engg. from I.M.E., Mumbai in 2002
Diploma in Mechanical Engg. from U.P. Lucknow in 1984
Level -2 for X-ray in NDT from Kota Board in 2000
Boiler Operations Eng. (BOE) from Chief Inspector Boilers Indore (M.P.) in 1996
PERSONAL DETAILS
15th April, 1962
Date of Birth:
Languages Known: Hindi, English
Passport: Pass port no:M9838716, date of Issue:04-08-2015, Date of Expiring:03-08-2025
Present Address: S.N. Pandey c/o Lal Shahab Mishra, Rambhata Road Near Ramlila Maidan, Baglamukhi Mandir,
District- Raigarh 496001 (CG)
Permanent Address: S/o G. S. Pandey, Sector # 8, Near Aeeappa Temple, Post: Obra, District - Sonbhadra 231219 (UP)
ANNEXURE (PROJECTS UNDERTAKEN)
Since May14 with RKM Power Gen Pvt. Ltd. 4X 360MW, Uchpinda Near Kharasia, Dabhra, District - Champa (CG) as SR. V.P. Cum
Director of The Board Member, Occupier of Factory & Plant Head
Project Undertaken:
Worked on planning, installation, erection & commissioning of BTG and its auxiliaries, & BOP (Ahp, HCSD pumps & its piping, B TG &
Bop compressor, CHP, Stacker & Re - Claimers, Twin Bagan Tippler with 8 Hoppers, ETP and DM Plant, Intake Pump House with 40
km Pipe Line to reservoirs, Raw Water Pump Hose
Jun13 Apr14 with M/S SHEL NGP. as Sr. VP (Project) Coordinator for Various Project s
Project Name: Coordinating of 2x300MW BTG TRN Project through BGR, 2x 600MW BTG & BOP of Athena Power Project
Ltd. at Raigarh (CG), 1x120 MW BTG of Thermax at vizag VSTPP, 2x660MW Supercritical Power Plant
Location: BTPP East Coast Thermal Power Pvt. Ltd. (A.P.), ATPP & TRN Thermal Power plant
Key Result Areas:
Concluded the contract, KOM and accordingly submitted L-2 schedule, deployed staff, manpower T&P according to the L-2
schedule
Managed erection procedure of structure, pressure part schedule up to drainable & non-drainable HT, up to COD of the plant
Prepared:
o H.T. procedure, erection procedure of auxiliary boiler
o FQP, FWP & safety plan for zero accident ISO Level for the time of execution up to hand over plant
o PBG, ABG against mobilization of T&P, manpower & resources
Monitored the L2, L3 & L4 schedule for the progress, DWGS & materials planning as sequential erection to proper utilization of
T&P and men power
Nov11 Jun13 with NCCL, Khuntani, Odisha as AVP (Sr. GM) / Project Head
Projects Undertaken:
Managed plant operations with the capacity 4x330MW of China Make in phase I 2x330MW & Phase II 2x330MW
Directed installation of Batching Plant, Cement Godowns, Steel Yard, Sand and Aggregate Yard
Reviewed:
o Construction & activities for foundation of BTG & BOP Areas, Chimney, Cooling Tower, ERH, DM Plant, Intake Reservoir, CWP
Pump House, All Control Rooms, Labs, Switchyard Foundation, HT & LT Transformer Foundation
o Mechanical, Electrical & C & I Erection activities for BTG & BOP areas of 330MW subcritical plant
Gained good understanding of implementation & documentation formalities for Quality Systems such as W.C.M Activity, 18001,
ISO 9000 activity
Single-handedly worked and troubleshot issues raised during plant stoppage at Kharach (BCP) for 2 x 110 T/ HR Boiler and its
auxiliaries
Apr10-Nov11 with Jindal India Thermal Power Limited, Derang Angul, Odisha as V.P. (BTG & BOP-Head/Project Head)
Projects Undertaken:
Managed the plant consisting BTG & BOP having capacity of 2x600MW of BHEL Make in Phase I 2x600MW & Phase II 3x600MW
Planned schedule for sequential flow of incoming materials for the BTG & BOP according to project schedule & commissioning
requirement as well as monitored the same
Made schedule of BTG & BOP for sequential monthly erection requirements up to coal synchronization to meet the project schedule
& monitoring the same
Administered the scheduling for availability of Contractors Manpower, Tools & Plants and other resources up to coal synchroni zation
to meet project schedule & monitored the same
Nov07 Apr10 with Adani Power Limited, Mundra, Gujarat as DGM -Project
Projects Undertaken:
Worked on planning, installation, erection & commissioning of BTG and its auxiliaries, & BOP (AHP, HCSD pumps & its Piping, BTG &
Bop Compressor, CHP, Vegan Tippler, ETP and DM plant, Intake Pump House with 50 km Pipe Line to Cooling Towers)
Managed installation & commissioning of BTG & BOP of the plant having capacity of 4x330 MW in phase I&II & 5x660 MW of China
Make Plant
Mar06 Nov07 with Hindalco Industries Ltd. (Unit: Birla Copper) Dahej, Gujarat as Manager
Projects Undertaken:
Installed capacity of the power plant is 135 MW having wide range of Boilers & Steam Turbines as (2.85, 12.5, 10.5, 2x24.5, 60 MW).
The plant consists of CFBC 3x 150 TPH & 1x75 TPH AFBC Boiler and Steam turbine
Administered operation & maintenance of 3 x 150 T/hr CFBC,1x75 T/hr AFBC Boiler and its accessories main Boiler, fuel feeding
system, ESP, Ash Handling system, fans (ID, FD & PA Fan Augmenting Fans)
Took preventive, predictive & annual o/h maintenance of 30 MW, 40MW, 2x12.5MW, 10.5MW, 6.5 MW sets Boiler, T/A and its
auxiliaries
Single handedly worked on maintenance & annual overhauling of Boilers & Turbines along with auxiliaries & operation of the plant
where successfully implemented TPM/ISO and other quality policies
Successfully managed the new green Project 1x60 MW
Prepared modifications in bed S/H clamping for avoiding the Breakdown and reduced two break down reduction in a year,huge
cost saving & increase plant reliability
Managed to plug the Air Heater Tube which were damaged and PA Air Increased, increased the boiler loading & huge amount of
cost saving and mounted frequency drive on the fans for saving the power
Mar93 Feb06 with Grasim Industries Ltd. Nagda (M.P.) as Deputy Manager
Projects Undertaken:
Completed engineering of 3 x 15.5 MW of BHEL sets for IBR project at Indonesia.
Drove efforts in indenting & ordering for material procuring of above sets from the various vendor as BH EL for 3 x 75 tons/ hours
AFBC Boilers and its auxiliaries, ESP, 2 x 15.5 MW Turbines, Generators and its auxiliaries, EOT crane for Turbine building, Feed
pumps, cooling Tower and CW pumps paharpur make, Elegi make screw compressors, coal shed, Truck Tipp lers, EOT crane for coal
shifting, complete coal handling plant from BHP, Ash handling plant from Andure, coal bunkers and Demine plant from Ion exch ange,
Filter Water and demine water pumps, cooling water, filter demine water, L.P. and H.P. extraction v alves, fittings and its piping
Performed Erection, Testing & commissioning & taken the full load on 3x15.5Mw T/A along with 3x75TPH AFBC Boilers and
conducted the PG Test of Boilers & Turbines on design coal at IBR Indonesia.
Managed a wide gamut of activities entailing finalization of machineries, Design Engg., Erection, Commissioning, Operations,
Maintenance, Inventory planning & Performance assessment of :
o 75 TPH & 65 Kg/ Cm2, Coal Fired Air Fluidized Bed Combustion Boiler of BHEL make
o Extraction cum Back-Pressure Steam Turbines of 16.5 MW capacity of SHIN NIPPON, Japan
o Coal Handling Plant of 150 TPH capacity Coal size: 6mm supplied by M/s Sayaji Iron & Steel Company, M/s Naveen projects
o Ash Handling Plant of 75 TPH capacity, make: M/s Melco, Faridabad