NAVEEN KUMAR.S
B.E, Electrical and Electronics Engineering
CAREER OBJECTIVE:
To be in a firm with a professional work driven environment where I can utilize and apply my knowledge, skills which would enable me as a graduate to grow while fulfilling organizational goals.
ADDRESS FOR COMMUNICATION:
No.6, k.v.t avenue, 2nd
main road, Sholavaram,
Chennai- 67.
MOBILE NUMBER : 729-***-****
EMAIL : *************@*****.***
PERSONAL DATA
Father name : D.Sivapragasam
Date of birth : 16/07/1997
Gender : Male
Nationality : Indian
Marital Status : Single
Mother tongue : Tamil
Languages
Known : English(read &write),Tamil(read &write),Telugu(listen &speak) Strengths : Hard working, self-confidence, good learner ACADEMIC CREDENTIALS:
COURSE
UNIVERSITY/BOARD
MONTH &
YEAR OF
PASSING
% OF MARKS
B.E(EEE)
R.M.K Engineering
college May - 2018 6.8/10 (68%)
12th
Std.
(computer science)
Velammal-surapet
Matriculation March - 2014 79.75%
10th
Std.
Velammal-surapet
Matriculation April - 2012 85.4%
SOFTWARE SKILLS & CERTIFICATIONS:
Skills in AUTOCADD and E-CADD (studied in Cadd School). Presented a paper titled “A Novel on Airborne Wind Energy” in the International conference held at Madha engineering college.
Secured good marks in BEC (Business English Certificate). Proficiency in MS office, C, C++ and java.
Done a workshop on MAT LAB.
I had won the second prize in the BGM event during my academic year. Successfully completed on PRE TERMINATED DATA CENTER SOLUTIONS in COMMSCOPE.
EXPERIENCE: 1 year
Microtech engineering
Designation - Electrical Supervisor
Duration - 4 months (Contract)
Role & Responsibilities:
- Keeping good coordination / relation with other dept and vendors.
- Identification of local shops for local purchase such as hardware's near site at starting stage of project.
- Before receiving the material make of material and qty should be checked. Material inspection report need to prepared.
- Briefing of the drawing to the vendor
- Plug top should be used for all equipment’s.
Undergone projects
- Baashyaam Willow Square (Guindy)
- Aavin (Nanthanam)
- ADGP office (Ambattur)
Keechery engineering co
Designation - Project Engineer (MEP)
Duration - 8 months
Roles & Responsibilities:
- Coordinate with all vendors(Electrical, HVAC, Sprinkler, FAS, Access, Partition, Carpentry, Painting, Glass Partition, Pluming, Flooring, False ceiling, Networking).
- Briefing of the drawing from designer and evaluate the execution possibilities at site.
- Studying the BOQ and ensure no deviation between BOQ and Drawing.
- Preparing the schedule and material chart with the help of planning dept.
- Check the material delivery date with project schedule.
- Collect the details of PO issued by the material dept and understand the scope of work in brought out item & Scope of vendors.
- Monitoring the project schedule and BOQ with vendor.
- Before receiving the material make of material and qty should be checked. Material inspection report need to prepared.
- Maintaining Site Office and Display Board & Safety in the site.
- Identification of local shops for local purchase such as hardware's near site at starting stage of project.
- Maintaining Registers, safety register, Visitors Register, Attendance Register, Handing taking Over Register.
- Any mistake happens at site need to intimate project manager with solution. Undergone Projects & Achievements:
- Prepartion of Lighting BOQ for lulu mall
- Mock up Done for lulu mall in kerala.
- Project Engineer in Zuper soft (T.nagar).
- Supporting MEP engineer in Ez (Guindy).
- Supporting MEP engineer in Work Ez (Mount road).
- Supporting MEP engineer in Coco cola (T.nagar) .
- MEP Designs & BOQ done for Cooper Project (Guindy).
- Design & Product development of Linear Light fitting.
- Clearing of snag list in L&T, HCCB, Zuper soft, Malladi drugs, Sulzer projects
- Preparing schedule and Infra report for SKCL 1st floor corridor project DEGREE PROJECT:
TITLE: LED DRIVER BASED ON “ONE AND A HALF STAGE”
FORWARD-FLYBACK CONVERTER
PROJECT AREA : Power electronics
PROJECT DESCRIPTION: We can achieve higher efficiency than the traditional two stage topologies at the same time power decoupling can be realized the one and a half stage converter and the electrolytic capacitor can be eliminated. DECLARATION:
I do hereby declare that the particulars of information and facts stated herein above are true, correct and complete to the best of my knowledge and belief. Place : Chennai Signature :
Date : Name : Naveen Kumar.S