Post Job Free
Sign in

Engineer Civil Engineering

Location:
Jubail, Eastern, Saudi Arabia
Salary:
20,000 SR
Posted:
August 19, 2020

Contact this candidate

Resume:

Khamis Jassim Al Mahmoud

BSc (Civil Engineering), (Construction &Management)

Date of Birth: 23th Augusts, 1981

Email id: adffl2@r.postjobfree.com

adffl2@r.postjobfree.com

Skype: Abo yousef 2020

Mobile No.: 009**-*********

Present Address: Saudi Arabia –AL Riyadh, Exit 1

Objectives:

I am Professional qualified planning engineer, Graduate Civil Engineer of more than 10 Years’ experience on challenging Projects in capacity of Planning, Scheduling, Monitoring and Controls. Further I am fully equipped with State of the Art knowledge and skills perfected with experience to undertake projects of Roads, Hospitals, Data center, administration Building accommodation buildings, Villas and infrastructures, I worked for Big companies and organizations. I have a proven track record of delivering Construction Supervision, scheduling, resource management, monitoring, reporting, controls, the estimated cost of these projects reached to hundreds of millions dollars, self-motivated, I have excellent technical and analytical skills, I have led multi-cultural teams on critical construction projects. able to work well on my own initiative to meet tight deadlines and achieve goals set, particularly under pressure. And can communicate concisely at all levels which make me the ideal candidate for the Job.

Professional Education and qualifications:

BSc (civil engineering 2006) University of Engineering & Technology, Damascus, Syria.

Specialization: Engineering Management &Construction.

PROFESSIONAL EXPERIENCE:

Sep 2017 till Present Archen consultant Engineering Riyadh, Dammam, Madeinah Project: Integrated Public Security Operation Project (IPSO-911) –MOI Project Buildings: Main Building- (Operation & Admin, Accommodation building, Substations, Workshop, Storages, RO Plant, Sewage Plant, Site infrastructure, Basement Parking, Guard House, Villa. Cost: 1,014,000,000 SR.

Position: Sr-Planning Engineer

Responsibilities:

Reviewing weekly and monthly updated schedule of the Contractor and forward to the PM, CM with comments.

Reviewing the weekly and monthly reports of the Contractor and forward to the PMCM with comments.

Ensure that the Contractors outlined deadlines/Milestones are met.

Works close to the Resident Engineer to ensure that the Project runs on schedule.

Flag the potential delays ahead of time looking into the progress of works to ensure that the necessary mitigation measures are implemented by the Contractor.

Monitor the material procurement schedule of the Contractor including submission of the QA/QC related document timelines as per schedule, and compare the delivery dates of procurement table with the dates in the updated schedule to measure any deviation and notify the contractor to take any corrective action.

Monitor the resources of the Contractor at site in comparison to the requirement in the baseline schedule.

Planning Engineer has to prepare the Consultant Reports for submission to the PM, CM which include site actual progress visiting plan progress, SV, SPI and TF.

Rreview and comment the EOT claim of the Contractor in any format as required by the Client and prepare the Consultant report for the review and approval of the Resident Engineer, based on Contract Conditions and specifications.

Carrying out of any task been assigned to me by PM to Prepare PM letters and contractors response letters as per my discipline.

Maintain and report on project metrics issued from and through consultants, contractors and document control.

November 2016 till Sep 2017 Saudi Lebanese Tarouk Co &In Riyadh KSA Project: KAFD Iconic Station for Al-Riyadh Metro.

Project Brief: Main station with three lines, Cost: 428,000,000 SR Position: Sr. Planning Engineer& Cost control.

Responsibilities:

Prepare Master & Detailed Construction Schedule for EPC (Engineering-Procurement- Construction) project in coordination with construction manager, interface managers, package managers and subcontractors.

Supervise planners in preparing Short-Term Schedules, Plan of the Day Schedule and communicate the plans to in-charge project/site engineers for proper implementation. Follow up with Engineering, Procurement and Construction teams to collect and verify project progress then use them in updating project schedule to assess if the project milestones are achievable.

Prepare marked-up drawings to track and verify the progress received from site engineers and subcontractors.

Ensure that shop drawing schedules and material delivery schedules are well planned and in accordance with construction sequence of the planned project.

Analyze actual project progress, review interim milestones path, revised critical path and available floats of activities and recommend possible solutions to Project Manager, Construction Manager if critical path is beyond the required completion dates.

Prepare weekly and monthly reports for Client and Head Office.

Prepare 5Weeks Look Ahead schedule, Summary Baseline, Longest Path, Progress and resources Curves and Milestones.

Prepare Key Performance Indicators for major activities/subcontractors to closely monitor the progress on each period.

Provide reports on resource requirements (Day & Night Shift) Manpower Histograms and Spreadsheets to Project Manager/Construction Manager.

Attend meetings with Project Management Team, Subcontractors and Client to follow up on project progress.

Attend coordination meeting with Construction Manager, Interface Managers, Package Managers and subcontractors to tackle interface issues and come up with resolution.

Prepare recovery and revision schedules to comply with the project and Client requirements.

Assist Claim Consultant and Contracts Department by providing impacted activities September 2015 till November 2016 Saudi Intel Tec Co &In Riyadh KSA Projects:

Shooting fields Project for RSAF, and time schedule, Cost: 42,000,000 SR

Hydraulic blocker for NWC and security fences, Cost: 10,000,000 SR

DATA Center for national grid, Cost: 156,000,000 SR. Position: Senior Planning Engineer& Cost control.

Responsibilities:

prepared more than (35) preliminary schedules for Tender Department associated with Histogram, S-Curve, Resource Loading, Cost Loading and Equipment requirement.

Prepare Detailed Construction baseline time Schedule loaded with cost and resources.

Update and prepare weekly, bi-weekly and monthly progress report showing the actual versus planned schedule then submit to client and main office.

Prepare project measurement reports which is in excel version of the work schedule showing the weights of all activities obtained from the costs and progress as planned as well as the actual progress.

Follow up with Engineering, Procurement and Construction teams to collect and verify project progress then use them in updating project schedule to assess the project milestones are achievable.

Review critical path and progress percentages of every project then recommend solutions to avoid delays.

Prepare Recovery & Extension of Time Schedule using Window Analysis.

Resource Loading, Cost Loading, Productivity Curves and Look-ahead Schedules.

Ensure that drawing schedules and material delivery schedules are well planned and in accordance with construction sequence of the planned project.

Interact constantly with the Site Project Managers and Construction Managers then provide hands-on assistance and support to keep the project schedule up to date.

Good experience in cost estimation, I have professional forms in this field for pricing June 2011 till September 2015 Al Saghyir Trading & Contracting. Co / Riyadh / KSA Projects Achieved:

Building Construction of King Abdullah College for Air Defense in TAIF Cost: 227,382,587 SR.

Construction of Housing for Defense and Air Forces in Eastern Region Cost: 479,174,300 SR.

Construction of Housing for Air Defense in Eastern Region, Cost: 249,933,642 SR

Construction of Staff Housing for Ministry of Higher Education in Magma Shaqraa and Zulfi Cost: 900,000,000 SR.

Construction of king Fahd hospital 500 bed in Tabuk for MOH, Cost: 447,000,000 SR Position: Senior Planning Engineer & Cost control. Responsibilities:

Prepare Baseline and update project schedule based on the contract Set work program and target milestones.

Prepare project measurement reports which is in excel version of the work schedule showing the weights of all activities obtained from the costs and the progress as planned as well as the actual progress.

Update & prepare weekly & monthly progress report showing the actual versus planned schedule.

Follow up with Engineering, Procurement and Construction teams to collect and verify project progress then use them in updating project schedule to assess the project milestones are achievable.

Monitor project schedule & priorities according to work sequence

Review critical path & progress percentages of the project then recommend solutions to avoid Delay.

Prepare Histograms, S-Curves, Resource Loading, Cost Loading, Productivity Curves and Look-ahead Schedules.

Review Equipment Requirement & Manpower Requirement Program based on the Estimates.

Calculate man-hours by multiplying quantities with productivity rate in hour.

Ensure that drawing schedules and material delivery schedules are well planned and in accordance with construction sequence of the planned project.

Monitor project performance using Earned Value method.

Good experience in cost estimation, I have professional forms in this field to analyze prices.

April 2009 till June 2011 AL Rawaf Trading &Contracting. CO. / Riyadh / KSA Projects Achieved: Battalion 83 in National Guard in Riyadh 24 Building,3 underground tanks,24 Sunshades, site infrastructure, Cost: 140,000,000 SR. Designation: Planning Cost Control Engineer

Responsibilities:

Prepare Baseline and update project schedule based on the contract. Set work program and target milestones.

Monitor critical activities based on the project schedule and advise project management.

Define the longest path that causes the delaying to the project.

Prepares and submit updated cash flow curve that reflecting the planned and actual progress and identify areas of weakness and take proper action for recovery.

Monitor day to day work progress and prepare the weekly and monthly report.

Prepares monthly report/dashboard reflecting work progress summary. Report to the Project Manager about the current work progress and make comparison between plan and actual progress and study impact of alternative approaches to work.

Participate in project meetings and discussions with the Client as required

Performs other duties and responsibilities as may be assigned from Management. Sep 2007 till Jan 2009 Al Ehab Gen. Co. L.L.C/ in Abu Dhabi UAE Projects Achieved: Private Villas

Eight special villas, six investigated villas.

Site works (infrastructure & landscape and hardscape Cost: 48,000,000 AED

Designation: Site Engineer

Responsibilities:

Structuring & finishing of 14 villas in Khalifa City (a).

Reading architectural and construction drawings

Basic of Building construction, and reinforcement of concrete

Quantity Surveying.

Following up team member and subcontractors and achieving the quality required as per specification to meet the requirement of client and consultant and get approval.

Attend construction meeting.

Learning and developing engineering skills.

Coordination with all disciplines in the project.

Computer Skills

Primavera P3 & P6 Ver8.3, 8.4 Internet skills.

AutoCAD, 2010 and above. Training Course in Computer repairing. Microsoft (word, excel, power point, Project)

Programs

Training course in Sap, Etabs and Safe

Adobe Photoshop.

Additional Qualifications:

Project Planning and Scheduling. Projects Cost Estimation. Project Management Project Cost Control.

Project Coordination Risk Management

Memberships

Member in Syrian Engineers Syndicate Member in SAUDI COUNCIL OF ENGINEERS

References:

Available on request

Thank you

Date: / /



Contact this candidate