Post Job Free

Resume

Sign in

Manager Power Plant

Location:
San Antonio, TX
Salary:
85000
Posted:
August 18, 2020

Contact this candidate

Resume:

Jaime Novoa Hernandez

Industrial Engineer, MBA

Mobile +1-210-*-**-**-**

adfffj@r.postjobfree.com

San Antonio. TX. 78213.

https://www.linkedin.com/in/jaime-novoa-hernandez-11b71117/

Summary:

My primary goals are to create a practical approach to administration and leadership, to promote efficiency and flexibility to better serve customer needs.

I have been a key player in the development and continuous improvement of quality and safe manufacturing applying EHS (OSHA) standards; I apply special to KPI’s targeting planned maintenance (PMP) and manufacturing.

I have extensive experience in equipment maintenance, QMS & DMAIC, manufacturing engineering, assisting in new product releases, quotes, material purchases and cost control, capital investments projects, and environmental health and safety.

I possess strong situational leadership to create, lead, and assist work teams to achieve goals and meet objectives in a timely manner.

I also have hands on experience on: Injection molding, extrusion, painting, CNC and CMM machining IATF, MSA. cutting, sewing, paint application (water and solvent base, electrostatic. assembly lines (TPS, JCMS, WCM), including, design and maintenance of equipment (TPM), machinery, stamping (cold ang hot), head liners, facilities. welding (AWS & ASME, API, ASTM, SAE, ANSI, NACE-SSPC).

Experienced in Automotive Industry QMS/TQM (ISO 9001, IATF/TS, VDA. APQP, 6 Sigma, Kaizen, Kan Ban, 5’s, GEMBA walks, CA+PA), Construction EPC (ASME, AWS, ISO 9001, ISO 18001, ISO 14001), and Aerospace (AS9100) companies.

Aptitudes: Service Orientation Emotional intelligence Proactivity be multipurpose Loyalty

Cognitive Flexibility Capacity for innovation Negotiation.

Work Experience.

Most recent Feb 2020. Quality & Engineering Representative. Assured Quality Systems. San Antonio. Texas.

Directly to Toyota TMMTX for containment, process guarantee. (Tundra & Tacoma).

Our customers - suppliers of parts (Tier I & Tier II) for the conformation of the vehicle such as:

Plastics injection (Interior & Exterior): IP, covers, vents, center consoles, harnesses, bumpers; Seats, headliners.

Metals: Stamping (Supports for roof, chest, sides)., HVAC, engine, and auxiliary power system.

Kpi’s Hoshin Kanri 方針 管理, Root causes (8 D’, 5 Why’s, Ishikawa Diagram).

Quality, Cost, Profitability, delivery and Timing, PPM reduction, Quick response on QPR, QIR, NSI, NONC.

Launch New project program for Sequoia.

Jun 2019 – Feb 2020 Plant Quality Manager. Schlemmer Gpo. (180 Empl). San Antonio. Texas.

Development of automotive injection molding and extrusion processes. Implemented GP12, Firewall, Safe Lunch to protect the customer.

Quality, Cost, Profitability, delivery and Timing, revenue, cost labor, CAPEX, NAFTA.

KPI's, CAPA, TPM, 5's. Kaizen Implementation. EHS (OSHA), GEMBA walks.

Improvement the Quality System Global certification in IATF. “This accomplishment received a special recognition / award by Corporative Office (Germany).

Development of documentation for Quality Manual, Procedures, Work Instructions, Quality Alerts and Visual Aids.

Jan 2017 - Mar 2019. Operations Manager. / Johnson Controls. (820 Empl). Durango. Mexico.

JC vs YORK® chiller solutions, meets the construction efficiency requirements of a variety of industrial and commercial chillers cooled by water and air (HVAC) \ according with ASME UG 90 C 1 and C 2.

•Productivity improvement from 22% to 72% in assembly line Heads (CNC) for evaporator and compressor vs. GEMBA Walks. Base on impact reduction of overtime from 33% to 11%.

•Rework reduction from 23% to 9%. In the process of welding, machining and drilling in heads and supports.

• Delivery compliance from 65% to 92%. • Zero safety accidents improve GEMBA Walks.

Feb 2015 - Jan 2017 Quality CIP & EHS Director / SENER Engineering. (370Empl). Mexico City.

EPC (Engineering Procurement Construction). CCC Cogeneration of power plant. Meet the technical requirements in engineering, based on the contract, specifications, codes for dynamic and static equipment.

•Development of ITP & Control Plan (NDT), ensuring the process, efficient times avoiding malfunctions until startup and warranty process.

•OEM s Develop Supplier in Principal components. Cost reduction material and testing * EHS with Zero accidents, incidents below 1.5% in all projects.

•Establishment for the control of emissions and discharges in the environment. Control of hazardous waste products all phases of construction. Until your certification.

Jun 2012 - Jan 2015 Operation Manager / Mylsa (150 Empl). Durango. Mexico.

Manufacturing of equipment for power generation & metal mechanics. Contractor for construction, maintenance and manufacturing projects. Air Preheater (Rotermuller, Lungström, vents, fireplaces, systems of filtration, conveyor's). Automotive spare parts: (bending, weld, paint corrosion) for bumpers.

Oct 2010 - Jun 2012. Plant Superintendent & CIP. / IQ International. (750 Empl). Mexico. City.

Automotive Manufacture & Electronical equipment, Injection molding components and paint.

Jun 2008 - Oct 2010. Quality CIP & EHS Manager. / Power Alstom. (1600 Empl). Morelia. Mex.

Power Energy Construction, maintenance and plant manufacturing of clean energy, turbines, Pre-heaters, Boilers (Static & Dynamic Equipment’s)

Jul 2006 - May 2008. Quality CIP & EHS Manager / GKN Aerospace. (620 Empl). S.L.P. Mex.

Oct 2003 - Jul 2006. Senior Quality & CIP Engineer/ Takata TRSI (2,500 Empl). Coahuila. Mex.

Oct 1999 - SEP 2003. Quality & Operations Engineer / Pneumafil Corp. (300 Empl). Charlotte. NC

Jul 1997 - Oct 1999. Corp. Certification System Manager/ Trinity Ind. (12,700 Empl). Mexico City.

Sep 1996 - Jun 1997 Quality Engineer / Bundy TI Gpo. (230 Empl). Mexico City.

Education

MS Instituto Politecnico Nacional, UPIICSA CONACyT. Master Business Administration

Scholarship by Center of Monbusho. Japan Kobe & Mexico City. July 1994 - August 1996.

Total Quality Management. (Program by Mitsubishi automotive electronics division).

BS Instituto Politecnico Nacional, UPIICSA. Industrial Engineering .

August 1988 – February 1993.

Languages

Spanish: Native Language Japanese: Intermediate Listener & Speaker, Newbie Reading and Writing

English: Advance. German: Beginning

Professional Skills & Training

AUTOMOTIVE

ISO 9001+ IATF 16949:2016. NAFTA

VDA 6.3 + MSA, PPAP, Core Tools.

JCMS (Lean Manufacturing), GMP; GEMBA, KAIZEN, MUDA

6 Sigma (Green Belt). MSA / SPC.

8Ds, Ishikawa, 5 whys.

TPS (Toyota Production Systems). Genchi Genbutsu “actual place, actual thing”.

WCM World Class Manufacturing-2011

FPS Ford Production System – 2011

GD & T: APQP, PFMEA, PPM s, KPI s CPK, PPK. MSA+ R & R / GD & T. / CMM “B&S” / SPC (Minitab).

Color harmony (Hue Test).

Balance Score Card.

METAL MECHANICS.

AWS - (D1.1, D1.6, D 1.3). Ex CWI.

ASME section VIII Div.1 & Div. 2 / Sec. IX, Sec II, Sec V.

Welding Process (TIG, MIG, submerged arc, SS & CS; aluminum). ASTM / ANSI / SAE / DIN/ NEMA / NACE - SSPC. NOM s / STPS.

ASNT- NDT. (LP, XR, PT, PM -L II: BE, ECT).

API B 31.1, B 31. 3.

API 570, API 1104

API 603, 607 (ISO 14313)

Thermography Technician. L-II.

CE Marking, PED Certify.

AAR-M1003. + DOT.

AEROSPACE.

AS 9100 & NADCAP. (AS9145)

SARA (SNECMA)

FOOD & HEALTHCARE.

NOM 251, ISO 22000 and PAS 220 AiB, BRC. + BSI 2001 DVI)

HACCP (CCP’s), FDA (NACMCF).

SOFTWARES.

Minitab - SPC

CAD/ SOLIDWORKS (GD&T.) ERP/MRP: IFS, SAP, MAPICs, Quick View, In Telesis, SADD. AS 400



Contact this candidate