Post Job Free
Sign in

Mechanical engineer

Location:
Coimbatore, Tamil Nadu, India
Posted:
August 19, 2020

Contact this candidate

Resume:

V.E-CHANDIRASEKARMail: adff30@r.postjobfree.com

Contact: 797-***-****

versatile,A ProjectPROFESSIONAL Management high-energy professional ~ Site JUNIER Engineering with the MANAGEMENT distinction & Management of executing ~ Piping prestigious ~ Fabrication projects and of large Erection magnitude ~ Commissioning within strict time schedule, cost & quality

Seeking challenging assignment in Project Management with India an organization of repute in Steel / Oil & Gas sector, preferably in PROFILE SUMMARY

• • • • • • • Diploma Management, Expertise test, Proficient Expertise Activity Capabilities building Skilled machines, Exemplary consultants, Commissioing in and in manpower handling in in in relationship Automobile contractors, coordination in Site developing managing Piping handling planning Activities project and Operations, and –Managing Engineering monitoring management, – Erection with Daily activities - statutory and Prefabrication, internal Handover and & Fabrication the commissioning overall with monthly agencies with / communication Site external accountability within over Activity project Piping Progress, with Operations, 9 departments the years Erection operations - consummate activities Manpower, Time skills Cost of of experience and working, control, with Erection Pipes involving for Quality Equipment, ease the ensuring Assembled out Preplanning ability in & Norms. resource various Project Commissioning timely to Material. pipe network requirements planning, Management, for completion racks, Hydro with Mechanical in-& test Cost process project with and Site Control,respect Commissioning members, Engineering inspection, Clearance, to Maintanance.utilities, Hydro team & ORGANIZATIONAL EXPERIENCE

Piping site engineer: ESSAR PROJECT INDIA LTD – Gujarat, odisha. (From Jun 2007 – to Nov 2014 Some of the Responsibility handed at steel, oil & gas Project:

• • • • • • Maintaining Responsible the Understand Monitoring and Coordinate status Review time standards (Equipment the manner. forecast with and the the of are all progress scope standards the aspect maintained. and plan PM of Pipe (work and of Project and of the Materials) safety look performance and day management ahead coordinates to and day of Quality schedules Available fabrication of the Department) with as fabrication per and in the and stores the take different erection company to the and and ensure necessary transportation. erection discipline activities procedure. the timely crew action in of order the in release to order project future to mitigate to the in ensure work drawing, terms of related the interference/of datas safety, productivity, issues. and Quality clashes. Materials Quality and in PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor

• • • • • • • • • • • • • Carrying Facilitate Maintaining by Preparation Responsible commissioning Raise Ensure project.Coordinating Handling when Ensure Coordinating Verifying Planning welding the necessary. the the out the the timely Materials the all labor maps. of the to the sub-all daily with with punch the carry for piping queries problem HSE force contractors engineering Client, piping activity the requirement point out and allocating project.Erection and the resolution PM, system Quality list as investigating Erection per bills Engineer, are and status for on test the Walk resolved, and construction the Hydro with project packages,,Mechanical hand daily through Contractors. job the all test is client by over milestones. the construction productivity and highlighting including to with field the handover clearance,make Oil billing pipe client flushing sure system crew. used. work red on is details hydrotest,the satisfactorily the activaties.line related standards limit detail to in Billing pneumatic on isometrics problems, engineering P&. are concluded ID Departments and followed test, drawing. including piping requirement.fulfilling and and isometrics. that Joint the maintained. the there welding drawing commissioning is no status of prolongation field maintained sketches and pre of Projects • • • • • VGO CSP Plate Electric 135MW Mill Plant Handled:Mill arc Power – – Utility – Utility furnace Process plant Piping and – Piping – Utility Hydraulics Thermal and boiler hydraulics Piping erection piping and Internal piping, External piping of boiler, Underground piping ORGANIZATIONAL EXPERIENCE

Piping site engineer: ESSAR PROJECT INDIA LTD –Odisha. (From AUG 2016 – to MAY 2017)

• • • • • • • • • • • • • • • • Maintaining Responsible the Understand Monitoring and Coordinate status Review Carrying Facilitate Maintaining by Preparation Ensure project.Coordinating Handling when Forecast Ensure Coordinating Planning welding time standards necessary. (Equipment the the the manner. the out the timely the all labor the maps. forecast with and the of the of tool the all daily with with punch are the standards all progress scope piping queries problem the HSE force and aspect maintained. engineering Client, piping activity and plan PM point equipment and of allocating Erection Pipe (and work and of Project and resolution PM, system of Quality list as the safety Materials) investigating look per performance Engineer, are and and day status management needs on test the Walk ahead resolved, and coordinates to construction the with project packages, day daily Quality of through in Contractors. job schedules the Available advance all fabrication of is client by milestones. the construction the productivity Department) as highlighting with including to with field fabrication per handover make of and in the the the and pipe stores client take different sure requirement.company system erection crew. used. work red on is to the and and the satisfactorily ensure the line necessary related transportation. standards erection limit discipline activities procedure. detail in the on isometrics problems, engineering P&timely crew action are in concluded of ID order the and followed in release to drawing. order project including piping future to requirement.and mitigate to the and in isometrics. ensure work that Joint drawing, the terms maintained. there of welding drawing related the interference/of is data’s safety, productivity, no issues. status of prolongation field and Quality maintained clashes. Materials sketches Quality and of in PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor EDUCATION

• Diploma in Automobile Engineering from Nachimuthu Polytechnic College, Pollachi, Coimbatore with 89 % in 2007 IT SKILLS

• • MS-AutoCAD Office, - MS-2D & Project 3D

PERSONAL DETAILS

Date Permanent of Birth: Address: 25th 6/27 July Poovalaparuthi, 1988 Kambala Patti, Pollachi-642001, Coimbatore, Tamil Nadu Language Passport No: Known: Tamil, J5642455 English, Telugu and Hindi Date of Expiry 24th April 2021

PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor



Contact this candidate