Post Job Free
Sign in

Power Plant Electrical Engineer

Location:
Dubai, United Arab Emirates
Posted:
August 17, 2020

Contact this candidate

Resume:

SUNIL KUMAR UDE

Mobile : +971*********: +91-939*******

E-mail : *****.***@*****.***

What’s app: +971*********

Self-motivated and dedicated Sr. ELECTRICAL ENGINEER (Buildings, Infrastructure and Industrial projects) ability to work under pressure, targeting assignments in Project management/co-ordination, Electrical Engineering with a growth-oriented organization. PROFILE SUMMARY

o 20+ Years of experience in multidiscipline Electrical & MEP works (MEP Projects – Building & Infrastructure) in multi Storey residential/commercial buildings, Infrastructure and industries including 10 Years in UAE/Malaysia.

o Preparation of Design, shop drawings, Technical submittals and RFIs and required as per specs. o Hands on knowledge in Supervision and monitoring of complete Electrical installation works, Testing and Commissioning activities for HV/MV/LV PCC/MDB/MCC, GIS/VCB/Isolators, SMDBs, DBs, ABB ACS-800 M SCADA, YOKOGAWA PLC/DCS, Digital I/O’s and its automation using FBD Ladder Logic blocks, Generators, Transformers, Motors, VFD-AC/DC Drives/Soft Starter/DOL/Star Delta Panels & its protection relay Panels, using Profibus/Modbus Communication, Fire alarm System, Emergency lighting system (Central Battery & Self-contained central monitoring), UPS, DC Battery Charger Panel, Relay Control Panels, Generator-Synchronizing/Turbine Control panel, Cooling Towers, pumps, High Capacity Boiler Feed pumping stations & its auxiliaries through automation, Electrostatic precipitators, Diesel Generators, Chiller Pumps & its Management (HMI Software), D.M./R.O. water treatment plants, Waste Water treatment plants, River water intake pumping stations, Building Management System (BMS), PID, Temperature Transmitter, Pressure Transmitter, Motorized Valves, Damper actuators, Level indicators, Air compressors, and other Process Instrumentation Systems.

o Modification/Upgradation of Existing Power/substation stations, boilers and its auxiliaries. o Troubleshooting/preventive maintenance/shutdown activities of Electrical Utilities o Preparation of closeout documents (AS BUILT Drawings, O&M Manual and Training handouts) for Consultant/Client’s approval and final hand over of the systems. o An effecting team player and coordinating efficiently with other MEP Mechanical services such as Lighting, Small Power, Lightning/Earthing system, HVAC System, Fire Fighting system, Water Supply, Drainage and other associated works.

o Experience in developing tray/trunking/containment design development, P& IDs flow charts, control hierarchy, I/O data point schedules, Turbine/Generator/Boiler auxiliaries Interlock and logic systems, Loop diagrams, cause and effect schedules detailed layouts. o Coordination / follow-ups with authorities like DEWA, du, Etisalat, Civil Defense & Dubai Municipality for final inspection and approval.

o Calculations and all other documents for Electrical instrumentation and control works o Ability to supervise and manage both direct/in house and sub-contractor’s work. o Monitor and report progress. Provide support to Field Engineering to resolve Technical Queries o Independently performs all the tasks necessary to complete primary design elements for engineering works

CORE COMPETENCIES: Electrical Engineering MEP/Infra/Industrial, Coordination, Project Management & Construction Management

EMPLOYMENT DETAILS

M/s KIER DUBAI LLC (KIER Groups), Dubai, UAE June 2018 to Present Sr Engineer – Electrical & MEP Co-ordination (2 Yrs) M/s Haydon MEC LLC, Dubai, UAE June 2016 to June 2018 Sr. Project Engineer-MEP (2 Yrs)

M/s Prime Electrical Contracting LLC, Dubai, UAE Sept 2014 to May 2016 Project Manager (1 Year 8 Months)

M/s SPM Engineering & Constructions (ALSTOM), Tanjung Bin, Malaysia Mar 2014 to Sept 2014 Site Manager– Electrical & Instrumentation (6 Months) M/s Scalla Contracting LLC (SNC LAVALIN), Abu Dhabi, UAE Mar 2013 to Mar 2014 Electrical POV specialist (Testing & commissioning) (1 Yr) M/s SPM Electromechanical Contracting LLC, Abu Dhabi, UAE Nov 2011 to Mar 2013 Project Manager(Electrical & Instrumentation) (1 Year 4 Months) M/s ARASMETA Captive Power Plant (P) Ltd, Bilaspur, India April 2010 to Nov 2011 Maintenance Manager (Electrical & Instrumentation) (1 Year 6Months) M/s Gopal Sponge & Captive Power Plant(P) Ltd, Raipur, India April 2005 to April 2010 Maintenance Manager(Electrical & Instrumentation) (5 Years) M/s Popuri Engineering & Consultancy Services, Hyderabad, India Nov 1998 to April 2005 Electrical & Instrumentation Design Consultant Engineer (6 Years) KEY PROJECTS HANDLED IN UAE/MALAYSIA (INFRASTRUCTURE, INDUSTRIAL, SUBSTATIONS & BUILDINGS)

1. EXPO-2020-Infrastructure & MEP buildings-Dubai

Client: - EXPO-2020

Consultant: -PARSONS & AECOM

2. Al-Barsha South Residential complex (GF+2P+12Floors+Roof) x2Units--Dubai

Client: NSHMI Development LLC

Consultant: -KWEK

3. Four Seasons Hotel (34-storey tower- 12 hotel floors +20 residential floors+2 Plant rooms)- Abu Dhabi

Client: Mubadala-Al-Futtaim carillon

Consultant: -AECOM

4. Marsa-Al-seef-Dubai

Client: Meraas Development

5. Gate Village-11-(5B+Serv+Conc+9Floors+Roof)-Commercial project-Dubai

Client: - DIFC

Consultant-LACASA

6. Spring Mall-B+G+1 Storey community centre, Spring Village – Dubai

Client: -Emaar Properties

Consultant-WME

7. DEWA 132KV/11KV substation-Business Bay & Doha ROAD S/S, Dubai

Client: -DEWA

8. RTA-R1011-Airport Upgrade Junctions

Client: -RTA

Consultant: - Louis Berger

9. Emirates Global Aluminium Smelters-Taweelah, Abu Dhabi

Client: -EMAL/SNC LAVALIN

10. Tanjung Bin Power Station (1000MW super critical)-ALSTOM EPC-JOHAR, MALAYSIA

11. GASCO-IGD-05 Development-HYUNDAI E&C-EPC- ABUDHABI, UAE RESPONSIBILITIES

Develop drawings including site plans, plan and elevation views

Preparation of Material Submittal and Shop drawings based on project specification and IFC drawings for consultant approval.

Preparation for material procurement and assistance to procurement team for order placement and timely delivery.

To ensure QA/QC in compliance with specification and requirement of the projects. Ensure client’s satisfaction and quality of deliverables

Allocation of work, monitoring of site activities and review progress of the activities on Daily/Weekly/Monthly basis.

Supervise and manage both direct and sub contractor’s work.

Liaise with other related disciplines and co-ordinate work with them.

Coordination of project design services with other disciplines and external parties.

Coordination meeting with all concern team to move forwards the site progress. Preparation of Agenda and Minutes of Meeting

Coordinate and follow up with all necessary departments & Client timely basis to ensure smooth flow of activities

Providing technical inputs for methodologies and coordinating with site management activities. Practical approach to solve the site issues. Provides guidance to entry level engineers.

Ensure that the Design meets all relevant international Codes and Middle East Standards

Inspect completed installations and observe operation to ensure confirmation to design and specification and Co-ordination with other trades.

Provide the necessary technical support to the engineers and manage deliverables within CAD and Engineers within the allocated budgets

Prepare design schedules and assist in preparation of design budgets

Attending Consultant and contractors meeting.

Assisted & enabled Testing and Commissioning of Electrical (HV/MV/LV & ELV) systems.

Prepared variation and take verification from consultant.

Obtaining DEWA & du/Etisalat’s final connection. Assistance for Civil Defense & DM approval.

Submission of online application for DCD inspections.

Ensure that the work will be done as per tender documents and handing over as per Client’s Requirement.

Preparation of As Built Drawings, O&M Manuals and other closeout documents for Consultant/Client’s Approval and final hand over of the systems / project.

Carry out all electrical work to the required quality and industry standards following the set guide lines.

Observe health and safety regulations and best work practice on sites to include the use of tools and other equipment.

Carry out all assigned tasks in an efficient and timely manner

Always represent and promote the company in a professional manner especially on client sites

Conversant in the testing procedures for industrial testing procedures

Carry out work on live electrical systems

KEY PROJECTS HANDLED IN INDIA

1. M/S. Arasmeta Captive Power Plant (p) ltd, India

Project: -43MWx 2No’s-132KV O/D substation-EPC Project

2. M/S. Gopal Sponge & Power Plant Pvt Ltd, Raipur, India

Project: -15MW Power Plant and 2x100 Ton DRI plant with 33KV outdoor Substation-EPC Project

3. Under M/S. Popuri Engineering & Consultancy Services, Hyderabad

Projects: -SOVA Ispat & Alloys Ltd (Mejia, Bankura dist., WB), SPS Steels (Jharsuguda, Orissa & Durgapur-WB), Sham Ispat-Barbil, Orissa, Singhal Enterprises- (Raigarh, C.G), Adhunik Metallics, ltd.,

(Durgapur, WB).

RESPONSIBILITIES

Develop design drawings for Power station, DRI/Coal Washers/Rotary Kiln/Indoor/Outdoor substation, Boiler/Water/Pumps/Cooling Tower/pumps/Raw/DM water pumping stations Electrical and its Instrument controls.

Develop Logics/integrating plant in operation with PLC/DCS

Provides guidance to entry level engineers

Support in progress meetings/communications with contractors, consultants and authorities.

Plan the maintenance activities with contractors, gain knowledge of the EPC contract and the plant in order to collect information about the plant.

Organize the operation and maintenance manuals, plan all the preventive, predictive and corrective maintenance activities, produce the maintenance policy and procedures.

Highlight any defects in the plant design or installation, raise punch list and warranty claims to EPC contractor

Propose modifications that can improve the plant performance and availability or reduce operation and maintenance cost.

Find the required subcontractors for the specialized maintenance activities.

Gain knowledge of the ERP system (SAP) and ensure that: All preventive maintenance activities are programmed in the system, all functional locations are identified, all other maintenance activities are routed through the system.

Provide the Continuous improvement Program for maintenance team through: Improve and update the maintenance procedure, update and organize maintenance manuals and drawings

Check for training requirement of the team and provide the required training ACADEMICS

B.Tech (Electrical) with 65%

Diploma in Electrical and Electronics Engineering with 75%

MBA Dual Degree in Project Operation Management & HR management with 57% ADDITIONAL QUALIFICATIONS: -

Registered member Electrical Engineer in Society of Engineers-UAE

DEWA-IIP Dept., authorized NOC Engineer.

DEWA-Solar -Approved Electrical Engineer.

RTA-DUBAI-Street & Tunnel Lighting approved Electrical Engineer KNOWN LANGUAGES : Telugu, English & Hindi

PERSONAL DETAILS

Date of Birth : 09.10.1977

Marital Status : Married (Kids: 2)

Address : Flat 201, Ramnagar Towers, Ramnagar, Hanamkonda, Warangal District, Telangana State, India-506001

Driving License : UAE/Malaysia Driving License

COMPUTER SKILLS

Basic computer skills, MS Office & Internet applications.

AUTOCAD, EICA DESIGN SOFTWARE

Yours truly,

(SUNIL KUMAR UDE)



Contact this candidate